PORTFOLIO - ZUL AFIF (F1055)

PORTFOLIO- ZUL AFIF (F1055)

9.0 CIRCULATION 1 PLAZA TOL
2 PORT DICKSON
MACRO DIRECTION 3 Distance from site
4 to plaza tol 34.5km
1
PD WATERFRONT
2 Distance from site
to PD waterfront
3 14. 2 km
4
PASIR PANJANG
Distance from site
10.7 km

KAMPUNG
KUALA LINGGI ,
MELAKA
Distance from site
21.8 km

40

MICRO DIRECTION 1

1) H . Port 2
Dickson – distance 3
4.8 km from site
45
2) Teluk kemang –
distance 1.5 km 41
from site
3) Politeknik Port
Dickson – 1.6km

4) Tanjung Tuan –
4.6km

5) Lexis Hibiscuss –
5.2km

VEHICLE CIRCULATION

This vehicles circulation showed the density of traffic at Jalan Raya Batu 5, Port Dickson. The time lapse below
showed the traffic flow at the site .Through the analysis, there are several issues which causes the problem
occurred along the street.
Has bus stop on the
main road across
opposite the Jalan
Perdana 4 junction

Safety for roads or
highways near the project
area is guaranteed by the
presence of traffic light
nearby
There is a bus stop across
the street near the shop
area opposite the bus stop
at the exit to the main
road.
Has a bus stop at one of
the exit intersections to the
main road. The bus stop is
always busy until evening
only

42

CIRCULATION : PEDESTRIAN

Existing pedestrian road (blue) at the site is not much. Other than pedestrian road at the opposite, most
of the other pedestrian road are actually quite far from site.

Existing pedestrian road next to the site

ANALYSIS
Because of the lack pedestrian route that is closer to the site, we propose a new pedestrian route to maximizes
user comfort to walk around. A new pedestrian road (red) next to the site that will be connected to the existing
pedestrian road around the site for the user also for the public by make a gap at the existing parking lot.

43

SYNTHESIS
Other than adding pedestrian road (red) closer to the site, we also propose to
add new pedestrian road (red) from the site to the main road and to the
nearest bus stop (141m from Jalan Kemang12), for user's facilities.

44

VIEW FROM MAP TO SHOW THE ROUTE

45

PROPOSE TO ADD A LAMP POST ALONGSIDE WITH THE
PEDESTRIAN ROAD

(ROUTE TO ADD NEW 141M FROM JALAN KEMANG 12 LAMP POST)

Propose to add lamp posts along with the new
pedestrian road for users comfort and security
purpose, so that users still can use the road at night.

46

PROPOSE TO ADD MORE PEDESTRIAN ROAD
FROM SITE TO THE NEAREST BUS STOP

Bus stop (Jalan Pantai) Nearest bus stop is Route to add
new 141m from Jalan Kemang 12

47

10.0 CONCLUSION

The architectural site analysis report increase the complex information and
knowledge. This report consists of nine important topics which are size &
zoning, neighbourhood context, climate, sensory, nature physical features,
man – made features, utilities, human culture and circulation of the site.
Then, this report views site analysis as a sub-system within the design
process, and the major factors in the design process also form the essence of
site analysis and selection. In site analysis, several major environmental
factors are identified based on the information between site and the
surrounding area.

48

DESIGN PROCESS



























































mid term
board

TO BUILD A RETREAT HOUSE /
STAYCATION FOR THE CLIENT , REMY
ISHAK . AND THE BUILD UP AREA FOR
HOUSE MUST BE IN 200 SQM.

LOCATION

THE LOCATION OF THE SITE OF PANTAI PURNAMA
,PORT DICKSON IN NEGERI SEMBILAN . THE
LOCATION SITE IS NEAR TO TOURIST AREA AND
PUBLIC AREA

ISSUES/PROBLEMS

ISSUES NEAR TO
/PROBLEMS PUBLIC AREA

& BEACH
(SOUND)

LACK OF PRIVACY

WEATHER MUST PROVIDE OR PLACE
TOO HOT THE SHADY TREE AND TALL
TREE TO REDUCE SUN DIRECT
AIM & OBJECTIVE

MUST PROVIDE A HIGH
WALL OR NATURAL WALL
LANDSCAPE TO TH E PRIVATE

AREA

AIM &
OBJECTIVE

USE SOUND PROOF MATERIAL
AS HOUSE MATERIAL FOR

THE EXAMPLE FIBER , SPRAY
FOAM AND MINERAL WOOL

ZUL AFIF BIN ZAKARIA
06DSB19F1055

BACKGROUND HIS FULL NAME IS MOHAMMAD WAS BORN IN 11 APRIL HIS A ACTOR,MODEL, HOST &
ZALIMEI BIN ISHAK ,1982 ( AGE 39) SINGER

, MELAKA , MALAYSIA

CHARACTERISTIC HE LOOKS LIKE A FIRM GUY BUT FAVOURITE COLOUR IS DARK DOESN'T LIKE ABOUT
LIFESTYLE HE A MINIMALIST PERSON COLOUR & SOFT COLOUR HIS NEGATIVE SIDE
LIKE TO PHOTOGRAPHY
LIKE TO DO WATER SPORT
JUST LIKE SURFING AND HE LOVES CAT & LIKE A
SIMPLE FASHION
KAYAK

FINISHES

MATERIAL

LARGE BALCONY INTERIOR
WINDOW DESIGN
MINIMALIST

OPENING

CONCEPT EXTERIOR
DESIGN

FLAT ROOF STYLE A SOLID SHAPE
FLAT ROOFS TAKE UP LESS SOUND PROOF MATERIAL
SPACE AND CONSEQUENTLY JUST
USE LESS MATERIAL THAN LIKE FIBER & SPRAY
FOAM
SLOPED ROOFS

USE A SOUND PROOF MATERIAL

ZUL AFIF BIN ZAKARIA
06DSB19F1055

FIRST FLOOR PLAN

GROUND FLOOR PLAN LEFT ELEVATION
FRONT ELEVATION RIGHT ELEVATION

BACK ELEVATION PERSPECTIVE

ZUL AFIF BIN ZAKARIA
06DSB19F1055

VIEW 1 VIEW 2

VIEW 4

VIEW 3

ZUL AFIF BIN ZAKARIA
06DSB19F1055

mock up
model









FINAL
PRESENTATION

BOARD