TIMELINE COURTYARD BY MARRIOTT PIGEON FORGE
Completion: October 2016 MARRIOTT INTERNATIONAL, INC.
SIZE Pigeon Forge, Tennessee, USA
135 Rooms The Courtyard Marriott is in the heart of the Smoky Mountains. The
award-winning, centrally-located Courtyard by Marriott Pigeon
AMENITIES Forge features rooms with private balconies, river and mountain
views, an outdoor pool and lazy river, an indoor pool, and right in
• Meeting Space the middle of action-packed Pigeon Forge.
• Common Area
• Indoor Pool Ranked #1 Courtyard Hotel in the World and Awarded Hotel
• Outdoor Pool Opening of the Year by Marriott International Inc., Courtyard by
• Game Room Marriott in Pigeon Forge offers boutique-style accommodations.
• Fitness Center
• 108,519 sf AWARDS
2017 Opening Hotel of the Year by Marriott International Inc.
Ranked one of the top hotels in Pigeon Forge by TripAdvisor
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897
TIMELINE AUSTIN DUAL BRAND HOTEL
Completion: Estimated 2023 FLORIDAYS DEVELOPMENT CO.
SIZE Austin, Texas, USA
276 Rooms The project includes a 164,372 square foot hotel with 276
rooms spanning a 2.2-acre site. Additional construction on an
AMENITIES 89,123-square foot multilevel parking garage, a rain garden, an
amenity pool and deck, and state-of-the-art drainage and utility
• Courtyard infrastructure are also planned. This new development will be
• Pool central to a rapidly changing East Austin hospitality and tourism
• Parking Garage with 196 Spaces area.
• Rain Garden
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897
TIMELINE COMFORT INN
Completion: Estimated 2023 HICKMAN ENTERPRISES
SIZE Sanford, Florida, USA
75,865 SF The hotel will be located close to Sanford International Airport and
the Boombah Sports Complex. The building is designed to provide 4
AMENITIES floors of rooms, and it includes a total of 110 rooms of 6 room types.
The ground level will offer a substantial dining and lobby area as
• Meeting Space well as meeting spaces. The fitness center overlooks the outdoor
• Common Area amenities that includes a pool, fire pit area, and pool pavilion.
• Outdoor Pool
• Pool Pavilion
• Fitness Center
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897
TIMELINE BEST WESTERN SEAWAY INN
Completion: 2015 *RENOVATION PROJECT*
SIZE Gulfport, Mississippi, USA
178 Rooms FK Architecture completed the exterior and interior renovation work
on the Best Western Seaway Inn property in Gulfport, Mississippi.
The Best Western Seaway Inn combines an ideal location with
personalized attention and premium amenities. Renovation of
Amenties included the reception/lobby area, the lounge, the fitness
center, the business center, and the outdoor pool area.
BEFORE RENOVATION
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897
TIMELINE UNIVERSAL’S ROYAL PACIFIC RESORT
Meeting Space Expansion: Fall 2015 LOEWS HOTELS & CO
Resort Completion: Summer 2002
Orlando, Florida, USA
SIZE
The award-winning Royal Pacific Resort, located at Universal Studios
1,000 Rooms in Orlando, Florida, is a 1,000-room four-pearl resort with a 1930s
Pacific Island/Balinese theme. Guests who stay at this hotel are
AMENITIES supposed to feel like they have journeyed to a South Pacific island.
The South Seas theme is emphasized in the lush tropical surroundings
• 141,330 Sf Meeting Space of the Royal Pacific grounds, where you’ll find palm and bamboo
• 64,000 Sf Outdoor Events Area trees, a lagoon-style swimming pool, and a white sand beach.
• 7 Restaurants The exotic theme is also evident in the décor, including a stunning
• Lounges orchid court and hand-carvings straight from Bali.
• Business Center
AWARDS
ARDA Silver Design Award for Architecture
HBA Aurora Award
2018 “10 Best” by USA Today Reader’s Choice Travel Awards for Best
Amusement Park Hotels
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897
TIMELINE DOLLYWOOD’S DREAMMORE RESORT
Completion: July 2015 HERSCHEND FAMILY ENTERTAINMENT
SIZE Pigeon Forge, Tennessee, USA
100 Acres The award-winning DreamMore Resort in Pigeon Forge, Tennessee,
300 Rooms provides a warm southern-hospitality welcome. There is indeed an
art and science when crafting a memorable arrival experience,
AMENITIES and it takes creative imagination and a well-executed design in the
landscape, lighting, hardscape, and architecture.
• Full-Service Restaurant
• Spa “The heart of the experience of any world-class leisure destination
• Salon is measured by the wonderful memories nurtured by the arrival
• Conference Center experience as well as the threshold between the outside world and
• Indoor Pool the special environment that the hospitality property is promised to
• Outdoor Pool provide.”
• Family Activities Center
AWARDS
After being named the number one Amusement Park Hotel in the
country by USA Today readers in the publication’s 10Best Readers’
Choice awards, it also earned a runner-up finish for the 10Best
Readers’ Choice Award for Best Family Resort in the United States.
© 2022 FK Architecture | 2555 Temple Trail . Winter Park, Florida 32789 | TEL: 407-629-0595 FAX: 407-628-1471 | AR0009897