System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 51
5. UOS&D Report Creation
Return to Main Menu
Matecon Matecon QA & QC Section
Manager Manager Manager
UOS&D
Report Creation UOS&D Report UOS&D Report UOS&D Report
Creation Date
Creator OK OK OK OK OK OK OK OK OK
Attached
UOS&D Report
UOS&D Report
OK OK Register to Corrective
PMT Measures are
Inspector’s Signed after discussed with
Signature Signed after confirming
confirming UOS&D report the person
UOS&D report concerned
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 52
5. UOS&D Report Creation
Create UOS&D Report.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 53
5. UOS&D Report Creation
Create UOS&D Report.
Input filters like RIR No. and
Package No. to narrow the search.
Select the UOS&D List.
Prioritizes and makes UOS&D Report before registering the inspection result. 54
Creates UOS&D Report while inspecting the materials.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
5. UOS&D Report Creation
Create UOS&D Report.
Input filters like RIR No. and Package
No. to narrow the search.
Input detailed information.
Select the UOS&D List.
UOS&D Report Output (Detailed information
is registered simultaneously)
UOS&D Report Creation UOS&D Report Date Created
Person-in-Charge
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 55
5. UOS&D Report Creation Reference No.
Received Date
UOS&D Report Sample RIR No.
Logo, Project Name UOS&D Information
*Editable ID No.
Description
Project Name (shorten) QTY
*Editable UOS&D Category
UOS&D No.
Detailed Information
B/L No. Freight Documents Information
AWB No.
TWB No. MHPS Matecon’s Signature
D/O No. *Editable
Package No.
Invoice No. MHPS QA&QC Manager’s
P/O No. Signature
Suppliers Name *Editable
Inspector’s Signature MHPS QA&QC Manager’s
*Editable Comments
*Editable
Corrective Measure
Contents MHPS Matecon’s Signature
Inspector’s Signature (After corrective measure)
*Editable
(After corrective measure)
*Editable MHPS QA&QC Manager’s
Shortage / Overage Signature
(assumption)
(After corrective measure)
Work Flow
*Editable *Editable 56
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
5. UOS&D Report Creation
Signed UOS&D Report (scanned data) are stored in the system.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 57
5. UOS&D Report Creation
Signed UOS&D Report (scanned data) are stored in the system.
Input filters like UOS&D No. and
Package No. to narrow the search.
Select the UOS&D List.
Signed UOS&D Report (Scanned Data)
Registration Complete
Signed UOS&D Report (scanned data) is stored in the
system. (Registration and reference method is the same as
with RIR) Refer to RIR Creation
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 58
System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 59
6. UOS&D Corrective Measure
Return to Main Menu
Storage Area Matecon Matecon QA&QC
Manager Manager
Corrective Measure UOS&D Report UOS&D Report
Details
Replacement OK OK OK OK OK OK
Corrective
Low Standard’s Measure Contents Attached OK OK OK OK OK OK
Storage Area UOS&D Report
Date Corrected
Storage Area
Person- in-
Charge
UOS&D Report Register to
PMT
Signs after OK OK OK
confirming OK OK Signs after
Corrective confirming Signs after
Replacement Repair Corrective confirming
Measures Measures Corrective
Measures
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
60
6. UOS&D Corrective Measure
Register corrective measures and storage area.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 61
6. UOS&D Corrective Measure
Register corrective measures and storage area.
Select “OPEN” in
UOS&D Status.
Select filters like UOS&D No. to narrow the search.
Click the UOS&D List. Low standard materials are displayed.
Check the corrected material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 62
6. UOS&D Corrective Measure
Register corrective measures and storage area.
Select “OPEN” in
UOS&D Status.
Corrective Measures Complete
(Issuability depends on the Corrective Measures Contents)
Select filters like UOS&D No. to narrow the search.
Corrective Measure Contents Low standard materials are displayed.
(may vary on each UOS&D) Check the corrected material.
Un -issuable
Received ReplacCemliceknttshe UOS&D List.
Stocks
Repair
Input Corrected Qty Set Storage Area
Date Corrected
Corrective Measure
Person-in-Charge
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 63
6. UOS&D Corrective Measure
Store the signed corrective measures in UOS&D Report (scanned data) in the system.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 64
6. UOS&D Corrective Measure
Store the signed corrective measures in UOS&D Report (scanned data) in the system.
Select “CLOSE” in
UOS&D Status.
Input filters like UOS&D No. to narrow the search.
Click the UOS&D List.
Signed Corrective Measures in UOS&D Report (Scanned Data)
Registration Complete
Store the confirmed corrective measure in UOS&D Report
(scanned data) in the system. (Registration method: Same
with RIR) Refer to 4. RIR Creation
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 65
System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 66
7. Issuance to Erection Group
Return to Main Menu
Erection Group Matecon
Attached
Request for
Material Issuance
Issue Request Issue Result
1. Issue Date 1. Issue Date
2. Issue Quantity 2. In-Charge
3. Requester
4. In-Charge
Storage Area
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 67
7. Issuance to Erection Group
Issue Date, Issue Qty, Requester of Request for Material Issuance is registered. (Issue Request)
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 68
7. Issuance to Erection Group
Issue Date, Issue Qty, Requester of Request for Material Issuance is registered. (Issue Request)
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 69
7. Issuance to Erection Group
Issue Date, Issue Qty, Requester of Request for Material Issuance is registered. (Issue Request)
List of
stocks
Issue
Request
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 70
7. Issuance to Erection Group
Issue Date, Issue Qty, Requester of Request for Material Issuance is registered. (Issue Request)
Input filters to narrow search.
Issue Request Registration Complete
List of Select Issue Request Material
stocks
Extract Issue Select Erection Group Issue Date(Req.)
Request Material
Issue Request Delivery Point Issue Request Quantity
Request
Select Subcon and in-charge of Issue Request. Issue Request Date 71
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
7. Issuance to Erection Group
Store Request for Material Issuance (scanned data) in the system.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 72
7. Issuance to Erection Group
Store Request for Material Issuance (scanned data) in the system.
Select Request (default) Input filters like Requester and
Erection Group to narrow the search.
Request for Material Issuance (Scanned Data)
Registration Complete
Select Issue Request
Store the Request for Material Issuance
(scanned data) in the system. (Registration
method is same with RIR) Refer to 4. RIR
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 73
7. Issuance to Erection Group
Register issue results. (Issue)
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 74
7. Issuance to Erection Group 75
Register issue results. (Issue)
Select Request (default) Input filters like Requester and
Erection Group to narrow the search.
Select Issue Request
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
7. Issuance to Erection Group
Register issue results. (Issue)
Select Request (default) Input filters like Requester and
Erection Group to narrow the search.
Select Issue Material If partial issue, change the qty.
Selec(tMIsuslutiepleR-esqeuleecstt)
Issue Result Registration Complete
Subcon Requester Name (Optional)
Company Issue Person-in-Charge Issue Date
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 76
System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 77
8. Return and Storage Return to Main Menu
Erection Group Matecon
Request for Return Storage Area
Material 1. Return Date
Returning 2. Return Material
3. Return Quantity
4. Storage Area
5. Damage
Storage Area
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 78
8. Return and Storage
Register the machinery or device of Return Material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 79
8. Return and Storage
Register the machinery or device of Return Material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 80
8. Return and Storage
Register the machinery or device of Return Material.
Select the Return Material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 81
8. Return and Storage
Register the machinery or device of Return Material.
Return and Storage of Material Return Material Info
Registration Complete Return Quantity
Return Area
Select the Return Material. MNS No.
Remarks
Damage Receiver
Broken: Un- issuable
Not Broken: Issuable Returned by and
Person-in-Charge
Return Date 82
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
8. Return and Storage
Register the Bulk Products or Materials of Return Material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 83
8. Return and Storage
Register the Bulk Products or Materials of Return Material.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 84
8. Return and Storage
Register the Bulk Products or Materials of Return Material.
Return and Storage of Material
Registration Complete
Return Material Info
Return Quantity
Return Area
MNS No.
Remarks
Damage Receiver
Broken: Un- issuable
Not Broken: Issuable Returned by and
Person-in-Charge
Return Date 85
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 86
9. Inventory Management
Return to Main Menu
Matecon Manager Matecon Inventory Result
1. Good Quantity
Instruct inventory work Inventory List Creation 2. Damage Quantity
3. Unsatisfy, Transferred
List up inventory 1. Select inventory materials Material Registration
(Area, Order/Unit No.) 2. Creation Date
3. Person-in-Charge Storage Area
Attached Inventory List Stock Confirmation
Inventory List 87
OK OK Inventory List inventory
Signed inventory OK OK
after confirmation
Signed after inventory
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
9. Inventory Management
List up inventory materials (inventory plan).
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 88
9. Inventory Management
List up inventory materials (inventory plan).
During inventory, issuance and transfer of materials may cause
the stock quantity to appear strange. Please observe caution.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 89
9. Inventory Management
List up inventory materials (inventory plan).
Inspected
Inventory
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 90
9. Inventory Management
List up inventory materials (inventory plan).
Input filters to narrow the search.
Inspected Attention message is displayed during registration.
Select inventory materials
Inventory
Extract the inventory materials.
91
Inventory List Creation (Inventory Plan
Registration Complete)
Inventory Person-in-Charge Inventory Creation Date
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
9. Inventory Management Logo
*Editable
Inventory List Sample
Inventory Result
Inventory Plan Info OK Material Count
List No. NG Material Count
List Creation Date Remarks
Inventory Date
Material Condition
Order, Unit, etc. Remarks Column
MHPS Matecon’s
Inventory List Signature Column
List No. *Editable
Description
Part No. 92
UOS&D
Incident Report
QTY
Storage Area
Inventory Person-in-
Charge Signature
Column
*Editable
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
9. Inventory Management
Register inventory result. (Actual inventory)
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 93
9. Inventory Management
Register inventory result. (Actual inventory)
Input filters like inventory list
creation date to narrow the search.
Select the inventory list.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 94
9. Inventory Management
Register inventory result. (Actual inventory)
Input filters like inventory list
creation date to narrow the search.
Select the inventory list. Input inventory result
OK Material Count
Inventory Result NG Material Count
Registration Complete Remarks
In case Storage Area In case of defect
is different, refer to material, refer to
10 Storage Area 11 Defect
Transfer Material Report
Inventory Person-in-Charge Inventory Date
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 95
9. Inventory Management
Finished inventory list (scanned data) is stored in the system.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 96
9. Inventory Management
Finished inventory list (scanned data) is stored in the system.
Select ”Complete” in Status field. Input filters like inventory date to narrow the search.
Select the inventory list.
Finished Inventory List (Scanned Data)
Registration Complete
Finished inventory list (scanned data) is stored in the
system. (Same method with RIR)
Refer to RIR
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 97
System Use Procedure
1. Data Preparation Import
2. Receiving Shipment data import
3. Inspection of Delivery
Receiving / Inspection
Receiving Date, Storage Area
Inspection Information
4. RIR Creation RIR 12. Progress Management
5. UOS&D Report Creation RIR Output
6. UOS&D Corrective Measure Progress Report & Various Lists
UOS&D List Progress Management, result/follow -up list
UOS&D Report Output
Corrective Measure 13. Information Search
7. Issuance to Erection G. Issue BQ History
8. Return and Storage Issue Request/Result Quantity Confirmation (ex. Received, etc.)
9. Inventory Management
10.Storage Area Transfer Material Return Material Search
11. Defect Material Report Returned Material Status Confirmation (ex. Storage Area, etc.)
Inventory Contract Spare Parts List
Inventory (List Creation) Contract Spare Parts/Special Tools Management
Transfer 14. Attachment Reference
Storage Area Change
Invoice Package
Incident Report
Storing loss/damaged Attachment Reference and Registration
Corrective measure
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 98
10. Storage Area Transfer
Return to Main Menu
Register the number of quantity transferred and where it came from.
Storage Area A Storage Area B
Matecon 99
Information Changed
1. Quantity Transferred
2. Transferred From
3. Transfer Date
4. Person-in-Charge
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved.
10. Storage Area Transfer
Register the quantity transferred and where it came from.
© 2014 MITSUBISHI HITACHI POWER SYSTEMS, LTD. All Rights Reserved. 100