The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by azah.mankaran, 2021-09-21 04:32:26

COMPANY PROFILE R3

COMPANY PROFILE R3

MAN KARAN PLT

(LL0009950-LGN)



Table Content 1-2
3-4
Company Information 5-10
Vision & Mission
Scope of Work 11
Organization Chart 12
Certificate Registration 13-14
Experiences 15-16
Project Photo 17
Customer

Company Information
1

Company Information

MAN KARAN PLT

(LL0009950-LGN)

Company Name : Man Karan Plt
Date Registered (LLP0009950)
Address
: December 8, 2016
Share Holders
Banker : No 8, Jalan PPAJ 2/7,
Contact Number Pusat Perdagangan Alam Jaya,
Website 42300 Bandar Puncak Alam,
Email Selangor Darul Ehsan.

: 1. Mohd Hasrullnizam Bin Abu Hasan
2. Mankaran Sdn Bhd

: CIMB Berhad

: 03 6039 9882

: www.mankaran.com

: [email protected]

2

Vision And Mission Vision And Mission

Our Vision Our Vision

To become one of thTeo cboemcopmaneyownehoof the company w
have a conducive whoarkvenavcirondmuecnivteaws ork environme
well as strong and hwigehllvaaslusetroinnlginaenwdithhigh value in lin
the latest technologtyh. e latest technology.

3

ssion Vision And Mission

ion Our Mission 4

going Ttroaipnrionvgidtoewoanrgdosintegatmraining towards team
d carrymouetmthbeeirrsreasnpdocnasribryiliotiuetstheir responsibilities
knowleedtghiecaablllyyainndprkonvoidweletdhgeebaebslty in provide the best
es to cuqsutaolmityesrse.rvices to customers.

4

Scope of Work

Our Sector

Man Karan Plt is being responsible and committed organization expertise
in EPIC (Engineering, Procurement, Installation and Commissioning)
We involved in these sectors such as :

Palm Oil

Biomass

5

Scope of Work
Biogas

Manufacture

Aerospace

6

Scope of Work

Our Service

Man Karan Plt mainly provide services in production plant.

SMART Factory (IR 4.0)
Design (base on process flow)
Automate the process
Remote the process
Notification (Email, Mobile)
Reporting for maintenance, production and etc
Testing and commissioning
Remote and on-site troubleshooting
7

Scope of Work

Power Supply
Genset, Biogas Engine

1. Cabling (surface, trenches, underground and etc)
2. Test run with and without load
Tenaga Nasional Berhad (TNB)
1. Application for service

Switchboard
Low voltage switchboard including install, testing and troubleshoot

1. Main breaker such as ACB,VCB,MCCB and etc.
2. Protection device such as ELR, IDMT and etc.
3. Measurement device such as digital power meter, amp meter and etc.

Motor control center (MCC) / Motor Starter
Design, install, testing and troubleshoot for :

1. Direct online starter (DOL)
2. Star Delta starter
3. Auto Trans starter @ Auto-transformer starter
4. Soft starter
5. Inverter starter
6. etc

Programmable Logic Controller (PLC)
Design functional base on process flow
Installation and configuration PLC hardware
Internal wiring system including power supply, I/O terminal block and relay
PLC programming work
Testing and commissiong PLC system
Remote and on-site troubleshooting

8

Scope of Work

Human Machine Interface (HMI)
Design functional base on process flow
Installation and configuration hardware
Configuration between PLC and HMI
HMI programming work
Testing and commissiong HMI system
Remote and on-site troubleshooting
Data logger
Supervisory Control and Data Acquisition (SCADA)
Design functional base on process flow
Installation and configuration SCADA hardware
SCADA programming work
Testing and commissiong PLC system
Remote and on-site troubleshooting

9

Scope of Work

Machine / Equipment
Cabling and testing machine, equipment and other related to power supply
Common Electrical Load
Supply, install, wiring and testing lighting such as fluorescent, highbay,
spotlight and compound lighting
Supply, install, wiring powerpoint (Single and three phase)
Sensor
Supply, install, scalling, and testing analog and digital sensor such as
pressure transmitter, flow meter and etc

10

Organization Chart

(LL0009950-LGN)

GENERAL MANAGER
MOHD HASRULLNIZAM BIN ABU HASAN

HUMAN RESOURCE & ADMINISTRATIVE ACCOUNT & FINANCE SALES ENGINEER
AFARIZA BINTI MOHD ZAKI NOR LAILA BINTI SALIM MOHAMMAD ADIB AKHMAL BIN AHMAD

MARKETING PROJECT MANAGER
SAHBAHRIN BIN ZAKARIA

ONLINE OFFLINE
SITI NURAZAH BINTI SAPARON KAMARUZAMAN BIN ABD WAHAB

11

Certificate Registration

Suruhanjaya Syarikat Malaysia Suruhanjaya Tenaga

12

Experience

EPCC Experience

FELDA Palm Oil Mill

Client: Federal Land Development Authority
Electrical
Control System
PLC

BAC Kg. Gajah Pellet Plant

Client: AZ Renewable Energy Sdn Bhd
Electrical
Control System

IHI 2nd EFB Pellet Plant

Client: AZ Renewable Energy Sdn Bhd
Electrical
Instrument
Control System
PLC
Scada

13

Experience

Location

This is our previous project have been done.

BAC Kampung Gajah, Perak Kilang Sawit Chiku, Kelantan
Kampung Gajah, Perak
Kilang Sawit Besout, Perak Kilang Sawit Jengka 8, Pahang
Pelabuhan Kuantan, Pahang
Kilang Sawit Sungai Tengi, Perak Kilang Sawit Lepar Utara 6, Pahang
Complex A, Sultan Abdul Aziz Shah Airport, Subang IHI KSL Sungai Lembing, Pahang
Kilang Sawit Dominion Square Gambang, Pahang
Klang, Selangor IHI 2nd EFB Pellet Plant Gambang, Pahang

Kilang Sawit Chini 2, Kilang Sawit Chini 3, Pahang
Pahang Kilang Sawit Chini 2, Pahang
Kilang Sawit
Triang, Pahang Kilang Sawit Keratung 3, Pahang

Kilang Sawit Serting
Hilir, Negeri Sembilan

Electrical Electrical for Biogas
Aerospace Electrical for Biomass

14

Project Photo

Electrical Work for Moving Floor System

Electrical Work for Palm Kernel Shell Screening System

Laid Cable for Air Compressor and Air Dryer

15

Project Photo

Fabricated Support for ECIC’s Housing

Installed Housing for EIC 2031

Cable Dressing for Motorize Valve at Rinsing Tank (SV-2061)

16

Customers

Federal Land Development IHI Solid Biomass Malaysia
Authority Sdn Bhd

AZ Renewable Energy Sri Jelutong Palm Oil Mill
Sdn Bhd Sdn Bhd

Calspan ASE

17

www.mankaran.com


Click to View FlipBook Version