MAN KARAN PLT
(LL0009950-LGN)
Table Content 1-2
3-4
Company Information 5-10
Vision & Mission
Scope of Work 11
Organization Chart 12
Certificate Registration 13-14
Experiences 15-16
Project Photo 17
Customer
Company Information
1
Company Information
MAN KARAN PLT
(LL0009950-LGN)
Company Name : Man Karan Plt
Date Registered (LLP0009950)
Address
: December 8, 2016
Share Holders
Banker : No 8, Jalan PPAJ 2/7,
Contact Number Pusat Perdagangan Alam Jaya,
Website 42300 Bandar Puncak Alam,
Email Selangor Darul Ehsan.
: 1. Mohd Hasrullnizam Bin Abu Hasan
2. Mankaran Sdn Bhd
: CIMB Berhad
: 03 6039 9882
: www.mankaran.com
: [email protected]
2
Vision And Mission Vision And Mission
Our Vision Our Vision
To become one of thTeo cboemcopmaneyownehoof the company w
have a conducive whoarkvenavcirondmuecnivteaws ork environme
well as strong and hwigehllvaaslusetroinnlginaenwdithhigh value in lin
the latest technologtyh. e latest technology.
3
ssion Vision And Mission
ion Our Mission 4
going Ttroaipnrionvgidtoewoanrgdosintegatmraining towards team
d carrymouetmthbeeirrsreasnpdocnasribryiliotiuetstheir responsibilities
knowleedtghiecaablllyyainndprkonvoidweletdhgeebaebslty in provide the best
es to cuqsutaolmityesrse.rvices to customers.
4
Scope of Work
Our Sector
Man Karan Plt is being responsible and committed organization expertise
in EPIC (Engineering, Procurement, Installation and Commissioning)
We involved in these sectors such as :
Palm Oil
Biomass
5
Scope of Work
Biogas
Manufacture
Aerospace
6
Scope of Work
Our Service
Man Karan Plt mainly provide services in production plant.
SMART Factory (IR 4.0)
Design (base on process flow)
Automate the process
Remote the process
Notification (Email, Mobile)
Reporting for maintenance, production and etc
Testing and commissioning
Remote and on-site troubleshooting
7
Scope of Work
Power Supply
Genset, Biogas Engine
1. Cabling (surface, trenches, underground and etc)
2. Test run with and without load
Tenaga Nasional Berhad (TNB)
1. Application for service
Switchboard
Low voltage switchboard including install, testing and troubleshoot
1. Main breaker such as ACB,VCB,MCCB and etc.
2. Protection device such as ELR, IDMT and etc.
3. Measurement device such as digital power meter, amp meter and etc.
Motor control center (MCC) / Motor Starter
Design, install, testing and troubleshoot for :
1. Direct online starter (DOL)
2. Star Delta starter
3. Auto Trans starter @ Auto-transformer starter
4. Soft starter
5. Inverter starter
6. etc
Programmable Logic Controller (PLC)
Design functional base on process flow
Installation and configuration PLC hardware
Internal wiring system including power supply, I/O terminal block and relay
PLC programming work
Testing and commissiong PLC system
Remote and on-site troubleshooting
8
Scope of Work
Human Machine Interface (HMI)
Design functional base on process flow
Installation and configuration hardware
Configuration between PLC and HMI
HMI programming work
Testing and commissiong HMI system
Remote and on-site troubleshooting
Data logger
Supervisory Control and Data Acquisition (SCADA)
Design functional base on process flow
Installation and configuration SCADA hardware
SCADA programming work
Testing and commissiong PLC system
Remote and on-site troubleshooting
9
Scope of Work
Machine / Equipment
Cabling and testing machine, equipment and other related to power supply
Common Electrical Load
Supply, install, wiring and testing lighting such as fluorescent, highbay,
spotlight and compound lighting
Supply, install, wiring powerpoint (Single and three phase)
Sensor
Supply, install, scalling, and testing analog and digital sensor such as
pressure transmitter, flow meter and etc
10
Organization Chart
(LL0009950-LGN)
GENERAL MANAGER
MOHD HASRULLNIZAM BIN ABU HASAN
HUMAN RESOURCE & ADMINISTRATIVE ACCOUNT & FINANCE SALES ENGINEER
AFARIZA BINTI MOHD ZAKI NOR LAILA BINTI SALIM MOHAMMAD ADIB AKHMAL BIN AHMAD
MARKETING PROJECT MANAGER
SAHBAHRIN BIN ZAKARIA
ONLINE OFFLINE
SITI NURAZAH BINTI SAPARON KAMARUZAMAN BIN ABD WAHAB
11
Certificate Registration
Suruhanjaya Syarikat Malaysia Suruhanjaya Tenaga
12
Experience
EPCC Experience
FELDA Palm Oil Mill
Client: Federal Land Development Authority
Electrical
Control System
PLC
BAC Kg. Gajah Pellet Plant
Client: AZ Renewable Energy Sdn Bhd
Electrical
Control System
IHI 2nd EFB Pellet Plant
Client: AZ Renewable Energy Sdn Bhd
Electrical
Instrument
Control System
PLC
Scada
13
Experience
Location
This is our previous project have been done.
BAC Kampung Gajah, Perak Kilang Sawit Chiku, Kelantan
Kampung Gajah, Perak
Kilang Sawit Besout, Perak Kilang Sawit Jengka 8, Pahang
Pelabuhan Kuantan, Pahang
Kilang Sawit Sungai Tengi, Perak Kilang Sawit Lepar Utara 6, Pahang
Complex A, Sultan Abdul Aziz Shah Airport, Subang IHI KSL Sungai Lembing, Pahang
Kilang Sawit Dominion Square Gambang, Pahang
Klang, Selangor IHI 2nd EFB Pellet Plant Gambang, Pahang
Kilang Sawit Chini 2, Kilang Sawit Chini 3, Pahang
Pahang Kilang Sawit Chini 2, Pahang
Kilang Sawit
Triang, Pahang Kilang Sawit Keratung 3, Pahang
Kilang Sawit Serting
Hilir, Negeri Sembilan
Electrical Electrical for Biogas
Aerospace Electrical for Biomass
14
Project Photo
Electrical Work for Moving Floor System
Electrical Work for Palm Kernel Shell Screening System
Laid Cable for Air Compressor and Air Dryer
15
Project Photo
Fabricated Support for ECIC’s Housing
Installed Housing for EIC 2031
Cable Dressing for Motorize Valve at Rinsing Tank (SV-2061)
16
Customers
Federal Land Development IHI Solid Biomass Malaysia
Authority Sdn Bhd
AZ Renewable Energy Sri Jelutong Palm Oil Mill
Sdn Bhd Sdn Bhd
Calspan ASE
17
www.mankaran.com