The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

A Collection of Architectural works from 2018-2021 by Sergio Riccardi at the Boston Architectural College

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by sergio.riccardi, 2023-03-05 21:02:45

BAC Masters Graduation Portfolio

A Collection of Architectural works from 2018-2021 by Sergio Riccardi at the Boston Architectural College

Keywords: Architecture,Architect,Graduation Works,Boston Architectural College,theBAC,BAC,Sergio Riccardi,Masters of Architecture

15' 1'-6" 15' 1'-6" 15' 1'-6" 15' 1'-6" 68'-1" Details 15' 1'-6" 15' 1'-6" 15' 1'-6" 15' 1'-6" 68'-1" 15' 1'-6" 15' 1'-6" 15' 1'-6" 15' 1'-6" 68'-1" 15' 1'-6" 15' 1'-6" 15' 1'-6" 15' 1'-6" 68'-1" Parapet Detail Slab Detail Window Head Detail


BAC Sculpture Garden


Baystate Medical Center: HOF Surgical Expansion Project Type: Healthcare Core and Shell Renovation B aystate Medical Center is undergoing a 3 Phase renovation which they are calling the Hospital of the Future(HOF). Currently the project and the team has hit our 100% Design Development milestone and we are proceeding forward with the Construction Documents Phase of the project. When brought on to the team, I was asked to digitally model in Revit the existing conditions for Level 03 New surgical lobby. I was also in charge of the design and layout of the lobby itself. Taking program elements that were set by the client and working through the design to layout the optimal arrangement for the New surgical Lobby. Connecticut River Connecticut River Springfield, MA Perkins & Will


BMC Level 03 B C E F H K M P Q S T A.3 A.5 D D.3 D.5 G.5 L N M.7 N.2 N.3 N.5 Q.5 S.8 S.9 S.3 Q.2 C.5 F.5 G J Existing Condition: Proposed Surgical Lobby Existing Condition: Proposed Surgical Lobby


When I joined the BMC team, I was tasked with helping trying to re-imagine the new proposed lobby space. To do this Juliette Bowker, Eugenie Jeong and myself set out to have a design charrette where we printed out a few copies of the existing conditions in plan and started to diagram over them. Lobby Layout After Charette


Vestibule Design Option: Flat-Out Vestibule Design Option: Round the Corner Vestibule Design Option: The Swoosh Vestibule Design Option: The Cove


Vestibule Study: Greeter Location


Final Approved Design for Vestibule 50% Design Development Level 03 Lobby Plan Client Comment: "We were wondering if these floating consult pods should have a sloped ceiling for cleaning purposes." Client Comment: "These Interior studies are great. We need to see them from the exterior to help us better understand where we want our branding and signage."


Consult Study: Hide the Crimes Consult Study: Sloped Ceiling


Exterior Renderings: The Approach Exterior Renderings: The Approach


Surgical Lobby: Design Option 1 Designed By Me


9 Tolosky Lobby Elevation View from east toward west looking south-Sergio South Elevation wood Tile floor OPTION 1 North Elevation South Elevation


9 Tolosky Lobby Elevation View from east toward west looking south-Sergio South Elevation wood Tile floor OPTION 1 North Elevation South Elevation


Surgical Lobby: Design Option 2 Designed By Me & Eugenie Jeong


12 OPTION 2 North Elevation South Elevation


12 OPTION 2 North Elevation South Elevation


Surgical Lobby: Final Client Approved Design Designed By Me


9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 P Q M.7 S T N 1 A31-01 / 1 A11-03D O R W 2 A31-01 3 A45-01 4 2 1 __________ A32-11 __________ 1 A32-11 3 __________ A32-12 1 __________ A32-12 2 __________ A32-11 2 1 A16-02 Room B2316 FIRE CONTROL ROOM B3003 NEW CURTAIN WALL SYSTEM FOR EXTERIOR. ALL GLASS PARTITION WITH TOP AND BOTTOM RAIL, SLIDING DOORS WITH FROSTED FILM NEW CURTAIN WALL SYSTEM FOR EXTERIOR. EXISTING STOREFRONT EXIST FLOORING VESTIBULE B3001 CONSULT B3008 CONSULT B3009 REGISTRATION KIOSKS 1 A31-02 SURGICAL LOBBY B3007 REG POD 2 B3006 WHEEL CHAIR STORAGE B3002 REGISTRATION B3004 5' - 4" 25' - 6 1/2" 7' - 5 1/2" 33' - 0" 16' - 10" 16' - 2" 13' - 8" 19' - 0" NEW CURTAIN WALL SYSTEM FOR EXTERIOR. EXISTING TO REMAIN ALTERNATE LOCATION FOR EGRESS STAIR. D82 10' - 3 3/4" 10' - 3 3/4" D82 B41 A41 B41 B41 B41 90A A41 B41 90A REG POD 1 B3005 09 68 13 CPT-1 09 30 13 CT-1 09 30 13 CT-1 09 68 13 CPT-1 B3007A B3002 B3004A B3005 B3006 B3008B B3009B B3008A B3009A B3004B B3004C B3007C B3007B NEW GREETER DESK: SSM-4 TOP AND SIDES WITH WD-1 VERTICAL SURFACES AT EXTERIOR PLASTIC LAMINATE INTERIOR. MTL-1 BASE WITH VERITCAL ANNO ALUMINUM T MOLDING BETWEEN PANELS 7' - 0" 2' - 6" FREE STANDING TABLE WD-1 WITH 1/4" POLISHED EDGE GLASS DIVIDERS CL CL 10' - 11 1/2" A45-02 1 A45-02 3 2 A31-02 2 A44-12 3A A45-01 S.5 __________ A44-12 1 4 A44-12 FLOOR PLAN LEGEND FLOOR PLAN GENERAL NOTES EXISTING PARTITION TO REMAIN NEW PARTITION DOOR NUMBER, REFER TO DOOR AND HARDWARE SCHEDULE ON SHEET A62-01 FOR FURTHER INFORMATION PARTITION TYPE FIRE EXTINGUISHER / CABINET LEAD LINING 1/8" EQUIVALENT PROTECTION B11 101 1. INTERIOR PARTITIONS NOT OTHERWISE DESIGNATED ARE TO BE A71. 2. REFER TO A00-02 FOR TYPICAL MOUNTING HEIGHTS. 3. EDGE OF DOOR FRAME FROM INSIDE CORNER TO BE 4" TYP, UNO. 0 1/2" 1" 2" CONSULTANTS KEYPLAN SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 10:46 2: 7 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A11-03C ENLARGED PLAN - LEVEL 03 AREA C Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com PROJECT NORTH TRUE NORTH 1 1/8" = 1'-0" ENLARGED PLAN - LEVEL 03 AREA C Construction Drawings: Level 03 Plan


9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 P Q M.7 S T N 1 A31-01 / 1 A11-03D O R W 2 A31-01 3 A45-01 4 2 1 __________ A32-11 __________ 1 A32-11 3 __________ A32-12 1 __________ A32-12 2 __________ A32-11 2 1 A16-02 Room B2316 FIRE CONTROL ROOM B3003 NEW CURTAIN WALL SYSTEM FOR EXTERIOR. ALL GLASS PARTITION WITH TOP AND BOTTOM RAIL, SLIDING DOORS WITH FROSTED FILM NEW CURTAIN WALL SYSTEM FOR EXTERIOR. EXISTING STOREFRONT EXIST FLOORING VESTIBULE B3001 CONSULT B3008 CONSULT B3009 REGISTRATION KIOSKS 1 A31-02 SURGICAL LOBBY B3007 REG POD 2 B3006 WHEEL CHAIR STORAGE B3002 REGISTRATION B3004 5' - 4" 25' - 6 1/2" 7' - 5 1/2" 33' - 0" 16' - 10" 16' - 2" 13' - 8" 19' - 0" NEW CURTAIN WALL SYSTEM FOR EXTERIOR. EXISTING TO REMAIN ALTERNATE LOCATION FOR EGRESS STAIR. D82 10' - 3 3/4" 10' - 3 3/4" D82 B41 A41 B41 B41 B41 90A A41 B41 90A REG POD 1 B3005 09 68 13 CPT-1 09 30 13 CT-1 09 30 13 CT-1 09 68 13 CPT-1 B3007A B3002 B3004A B3005 B3006 B3008B B3009B B3008A B3009A B3004B B3004C B3007C B3007B NEW GREETER DESK: SSM-4 TOP AND SIDES WITH WD-1 VERTICAL SURFACES AT EXTERIOR PLASTIC LAMINATE INTERIOR. MTL-1 BASE WITH VERITCAL ANNO ALUMINUM T MOLDING BETWEEN PANELS 7' - 0" 2' - 6" FREE STANDING TABLE WD-1 WITH 1/4" POLISHED EDGE GLASS DIVIDERS CL CL 10' - 11 1/2" A45-02 1 A45-02 3 2 A31-02 2 A44-12 3A A45-01 S.5 __________ A44-12 1 4 A44-12 FLOOR PLAN LEGEND FLOOR PLAN GENERAL NOTES EXISTING PARTITION TO REMAIN NEW PARTITION DOOR NUMBER, REFER TO DOOR AND HARDWARE SCHEDULE ON SHEET A62-01 FOR FURTHER INFORMATION PARTITION TYPE FIRE EXTINGUISHER / CABINET LEAD LINING 1/8" EQUIVALENT PROTECTION B11 101 1. INTERIOR PARTITIONS NOT OTHERWISE DESIGNATED ARE TO BE A71. 2. REFER TO A00-02 FOR TYPICAL MOUNTING HEIGHTS. 3. EDGE OF DOOR FRAME FROM INSIDE CORNER TO BE 4" TYP, UNO. 0 1/2" 1" 2" CONSULTANTS KEYPLAN SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 10:46 2: 7 PM B MI 360://Bays at te Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A11-03C ENLARGED PLAN - LEVEL 03 AREA C Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com PROJECT NORTH TRUE NORTH 1 1/8" = 1'-0" ENLARGED PLAN - LEVEL 03 AREA C


Construction Drawings: Elevations LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6 4: 0 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6 4: 0 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6 4: 0 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE


LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6:40 PM BIM 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6:40 PM BIM 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6 4: 0 PM B MI 360:/ B/ aysta et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 12 13 14 15 1 A31-01 3 A31-02 21' - 4" 4' - 0" 24' - 0" 4' - 0" 12' - 0" 14' - 0" 3' - 0" 2' - 0" 7' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 21' - 4" 1' - 11 3/4"2' - 0 1/4" 24' - 0" 1' - 11 3/4" 2' - 0 1/4" 24' - 0" 1' - 11 3/4"1' - 11 3/4" 24' - 0 1/2" 1' - 11 3/4"1' - 11 3/4" 11' - 6 1/4" 3' - 11 3/4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0 1/2" 6' - 0" 6' - 0" 6' - 0" 5' - 9 1/2" 5' - 8 3/4" NEW METAL PANEL BEAM CLADDING NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" T 2 A31-01 2' - 0 1/4" 17' - 11 3/4" 5' - 11 3/4" 6' - 0" 6' - 0" 12' - 0" 14' - 0" 3' - 0" 1' - 10 3/4" 7' - 1 1/4" 3' - 0" 11' - 0" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 1' - 10 3/4" GL-1 GL-1 GL-1 9' - 1 1/4" NEW METAL PANEL BEAM CLADDING LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" LEVEL 06 164' - 11" LEVEL 07 176' - 11" HIGH ROOF 198' - 11" T S Q P N M.7 M 2 A31-01 __________ A30-01 2 1 A16-02 5 A33-02 __________ A30-01 3 LEVEL 03 DD#5 140' - 11" 11 12 13 14 15 16 1 A31-01 3 A31-02 1 A21-01 __________ A30-01 1 11' - 0" 3' - 0" 1' - 10 3/4" 9' - 1 1/4" GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 GL-1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 7/ 2/ 020 6 2: 6 4: 0 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A30-01 ENLARGED ELEVATIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" ENLARGED ELEVATION - SOUTH 2 1/4" = 1'-0" ENLARGED ELEVATION - EAST 4 1/16" = 1'-0" EAST ELEVATION 5 1/16" = 1'-0" SOUTH ELEVATION 3 1/4" = 1'-0" ENLARGED ELEVATION -ENTRY VESTIBULE


LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" S T 14' - 0" 16' - 0" 12' - 0" ELEVATOR ROOF 156' - 11" __________ A32-01 3 __________ A32-01 2 __________ A32-01 1 CONSULT __________ A32-02 3 __________ A32-02 2 __________ A32-02 1 CORRIDOR SURGICAL LOBBY RESTRICTED CORRIDOR A41 D41 D41 __________ A32-03 2 LEVEL 03 DD#5 140' - 11" S.5 LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 15 SURGICAL LOBBY SOILED CORRIDOR __________ A32-02 4 __________ A32-02 5 __________ A32-02 6 __________ A32-03 1 LEVEL 03 DD#5 140' - 11" LEVEL 02 110' - 11" A.5 A.3 EXISTING EXTERIOR WALL EXISTING EXTERIOR WINDOW EXISTING STRUCTURE ABOVE INTERIOR CLG REFER TO A12 RCP SHEETS PACU HEADWALL PROVIDE STRUCTURAL SUPPORT TO FACTEN HEADWALL TO EXISITNG WALL OR ABOVE STRUCTURE, TO PREVENT BUCKLING OF PANELS. INTERIOR PARTITION EXTEND 1' - 0" BEYOND CLG STRUCTURAL SUPPORT FOR PARTITION STRIP LIGHT AT SOFFIT EDGE PROVIDE SUPPORT FOR SOFFIT TO STRUCTURE ABOVE PACU BAY ENTRY, PRIVACY CURTAIN TRACK IN CLG 11' - 0" FROM FACE OF HEALWALL TYP. FOR CAVITY GAP SIZE REFER TO PLAN FILL THE WINDOW OPENING W/ FILM FACING TO EXTERIOR GLASS & REQUIRED INSULATION ON THE BACK FOR MOISTURE & THERMAL CONTROL LEVEL 02 110' - 11" A EXISTING EXTERIOR WALL EXISTING EXTERIOR WINDOW EXISTING STRUCTURE ABOVE INTERIOR CLG REFER TO A12 RCP SHEETS PACU HEADWALL PROVIDE STRUCTURAL SUPPORT TO FACTEN HEADWALL TO EXISITNG WALL OR ABOVE STRUCTURE, TO PREVENT BUCKLING OF PANELS. INTERIOR PARTITION ADJACENT TO EXTERIOR WALL REFER TO PLANS FOR TYPE AND HEIGHT 1' - 0" FILL THE WINDOW OPENING W/ FILM FACING TO EXTERIOR GLASS & REQUIRED INSULATION ON THE BACK FOR MOISTURE & THERMAL CONTROL __________ A32-03 3 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 8 2: 5 2: 3 PM B MI 360://Bays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A31-01 WALL SECTIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" WALL SECTION - SURGICAL LOBBY (N-S) 2 1/4" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) 3 1/4" = 1'-0" WALL SECTION - PACU HEADWALL TYP. 4 1/4" = 1'-0" WALL SECTION - PACU HEADWALL ADJACENT TO EXTERIOR WALL Construction Drawings: Exterior Wall Sections


LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" S T 14' - 0" 16' - 0" 12' - 0" ELEVATOR ROOF 156' - 11" __________ A32-01 3 __________ A32-01 2 __________ A32-01 1 CONSULT __________ A32-02 3 __________ A32-02 2 __________ A32-02 1 CORRIDOR SURGICAL LOBBY RESTRICTED CORRIDOR A41 D41 D41 __________ A32-03 2 LEVEL 03 DD#5 140' - 11" S.5 LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 15 SURGICAL LOBBY SOILED CORRIDOR __________ A32-02 4 __________ A32-02 5 __________ A32-02 6 __________ A32-03 1 LEVEL 03 DD#5 140' - 11" LEVEL 02 110' - 11" A.5 A.3 EXISTING EXTERIOR WALL EXISTING EXTERIOR WINDOW EXISTING STRUCTURE ABOVE INTERIOR CLG REFER TO A12 RCP SHEETS PACU HEADWALL PROVIDE STRUCTURAL SUPPORT TO FACTEN HEADWALL TO EXISITNG WALL OR ABOVE STRUCTURE, TO PREVENT BUCKLING OF PANELS. INTERIOR PARTITION EXTEND 1' - 0" BEYOND CLG STRUCTURAL SUPPORT FOR PARTITION STRIP LIGHT AT SOFFIT EDGE PROVIDE SUPPORT FOR SOFFIT TO STRUCTURE ABOVE PACU BAY ENTRY, PRIVACY CURTAIN TRACK IN CLG 11' - 0" FROM FACE OF HEALWALL TYP. FOR CAVITY GAP SIZE REFER TO PLAN FILL THE WINDOW OPENING W/ FILM FACING TO EXTERIOR GLASS & REQUIRED INSULATION ON THE BACK FOR MOISTURE & THERMAL CONTROL LEVEL 02 110' - 11" A EXISTING EXTERIOR WALL EXISTING EXTERIOR WINDOW EXISTING STRUCTURE ABOVE INTERIOR CLG REFER TO A12 RCP SHEETS PACU HEADWALL PROVIDE STRUCTURAL SUPPORT TO FACTEN HEADWALL TO EXISITNG WALL OR ABOVE STRUCTURE, TO PREVENT BUCKLING OF PANELS. INTERIOR PARTITION ADJACENT TO EXTERIOR WALL REFER TO PLANS FOR TYPE AND HEIGHT 1' - 0" FILL THE WINDOW OPENING W/ FILM FACING TO EXTERIOR GLASS & REQUIRED INSULATION ON THE BACK FOR MOISTURE & THERMAL CONTROL __________ A32-03 3 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6/8 2/ 020 8:25 2: 3 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A31-01 WALL SECTIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" WALL SECTION - SURGICAL LOBBY (N-S) 2 1/4" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) 3 1/4" = 1'-0" WALL SECTION - PACU HEADWALL TYP. 4 1/4" = 1'-0" WALL SECTION - PACU HEADWALL ADJACENT TO EXTERIOR WALL


S T O __________ A32-01 4 REG POD 1 REGISTRATION SURGICAL LOBBY EQUIP CORRIDOR SEMI-RESTRICTED CORRIDOR D41 D41 90A S.5 LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" EXISTING SLAB & FOUNDATION NEW FOUNDATION WHEEL CHAIR STORAGE MATCHLINE __________ A32-01 6 __________ A32-01 5 LEVEL 03 DD#5 140' - 11" LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 11 LEVEL 03 DD#5 140' - 11" 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6/8 2/ 020 8 3: 3 1: 2 PM B MI 360://Baysta et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A31-02 WALL SECTIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" WALL SECTION - WHEELCHAIR STORAGE 2 1/4" = 1'-0" SURGICAL LOBBY WEST WALL SECTION Construction Drawings: Exterior Wall Sections


S T O __________ A32-01 4 REG POD 1 REGISTRATION SURGICAL LOBBY EQUIP CORRIDOR SEMI-RESTRICTED CORRIDOR D41 D41 90A S.5 LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" EXISTING SLAB & FOUNDATION NEW FOUNDATION WHEEL CHAIR STORAGE MATCHLINE __________ A32-01 6 __________ A32-01 5 LEVEL 03 DD#5 140' - 11" LEVEL 02 110' - 11" LEVEL 03 126' - 11" LEVEL 04 140' - 11" LEVEL 05 152' - 11" 11 LEVEL 03 DD#5 140' - 11" 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 8 3: 3:12 PM B MI 360://Bays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A31-02 WALL SECTIONS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1/4" = 1'-0" WALL SECTION - WHEELCHAIR STORAGE 2 1/4" = 1'-0" SURGICAL LOBBY WEST WALL SECTION


Construction Drawings: Exterior Section Details LEVEL 03 126' - 11" 3" 08 80 00 08 44 13 6 1/2" 04 42 00 07 13 53 3" 2' - 0" 03 30 00 07 21 00.A EXISTING CONSTRUCTION LEVEL 04 140' - 11" 3' - 0" 07 42 13.G1 07 27 13.A1 06 16 00.B3 05 40 00 05 50 00 07 81 00.A 1' - 0" 1' - 0" 08 80 00 07 62 00 08 44 13 2" 2 1/2" 07 21 00.G 07 26 00 09 29 00 08 80 00 07 27 13.C2 07 27 13.C2 08 44 13 EXISTING R-7.5 MIN. R-13 MIN. 2" 07 21 00.H LEVEL 03 DD#5 140' - 11" LEVEL 05 152' - 11" T 3' - 0" 3" 2' - 0" 1/2" 08 44 13 08 80 00 05 40 00 05 40 00 09 29 00 05 12 00.A0 LEVEL 04 140' - 11" T 05 40 00 09 29 00 09 29 00 05 40 00 05 50 00 08 44 13 08 80 00 R-13 MIN. 07 21 00.G 07 62 00.B 2' - 1" 2' - 0" 4' - 10 1/4" LEVEL 03 DD#5 140' - 11" KEYNOTES LEVEL 04 140' - 11" LEVEL 03 DD#5 LEVEL 03 126' - 11" 07 95 13.B2 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9 0: 5 0: 9 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-01 EXTERIOR SECTION DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" CURTAINWALL SILL - LEVEL 03 2 1 1/2" = 1'-0" CURTAINWALL AT BEAM ENCLOSURE 3 1 1/2" = 1'-0" CURTAINWALL HEAD AT EXISTING SOFFIT 4 1 1/2" = 1'-0" CURTAINWALL SILL AT L04 03 30 00 Cast-In-Place Concrete 04 42 00 Exterior Stone Cladding 05 12 00.A0 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 06 16 00.B3 [Glass-Mat Gypsum] [Cellulose Fiber-Reinforced Gypsum] [Fiberboard] Wall Sheathing 07 13 53 Elastomeric Sheet Waterproofing 07 21 00.A Thermal Insulation 07 21 00.G Mineral-Wool Blanket 07 21 00.H Mineral-Wool Board 07 26 00 Vapor Retarders 07 27 13.A1 Modified Bituminous Sheet Air Barrier, Vapor Retarding 07 27 13.C2 Elastomeric Sheet Flashing 07 42 13.G1 Metal Composite Wall Panel, [Clip Attachment] [Subgirt And Spline] [Track Support] [Rainscreen Principle] Assembly 07 62 00 Sheet Metal Flashing and Trim 07 62 00.B Flashing 07 81 00.A Sprayed Fire Resistive Material 07 95 13.B2 08 44 13 Glazed Aluminum Curtain Walls 08 80 00 Glazing 09 29 00 Gypsum Board 6 1 1/2" = 1'-0" WALL SECTION - WHEELCHAIR STORAGE - Callout 1 5 1 1/2" = 1'-0" WHEEL CHAIR STORAGE FOUNDATION AND FOOTING DETAIL


LEVEL 03 126' - 11" 3" 08 80 00 08 44 13 6 1/2" 04 42 00 07 13 53 3" 2' - 0" 03 30 00 07 21 00.A EXISTING CONSTRUCTION LEVEL 04 140' - 11" 3' - 0" 07 42 13.G1 07 27 13.A1 06 16 00.B3 05 40 00 05 50 00 07 81 00.A 1' - 0" 1' - 0" 08 80 00 07 62 00 08 44 13 2" 2 1/2" 07 21 00.G 07 26 00 09 29 00 08 80 00 07 27 13.C2 07 27 13.C2 08 44 13 EXISTING R-7.5 MIN. R-13 MIN. 2" 07 21 00.H LEVEL 03 DD#5 140' - 11" LEVEL 05 152' - 11" T 3' - 0" 3" 2' - 0" 1/2" 08 44 13 08 80 00 05 40 00 05 40 00 09 29 00 05 12 00.A0 LEVEL 04 140' - 11" T 05 40 00 09 29 00 09 29 00 05 40 00 05 50 00 08 44 13 08 80 00 R-13 MIN. 07 21 00.G 07 62 00.B 2' - 1" 2' - 0" 4' - 10 1/4" LEVEL 03 DD#5 140' - 11" KEYNOTES LEVEL 04 140' - 11" LEVEL 03 DD#5 LEVEL 03 126' - 11" 07 95 13.B2 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9:05 0: 9 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-01 EXTERIOR SECTION DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" CURTAINWALL SILL - LEVEL 03 2 1 1/2" = 1'-0" CURTAINWALL AT BEAM ENCLOSURE 3 1 1/2" = 1'-0" CURTAINWALL HEAD AT EXISTING SOFFIT 4 1 1/2" = 1'-0" CURTAINWALL SILL AT L04 03 30 00 Cast-In-Place Concrete 04 42 00 Exterior Stone Cladding 05 12 00.A0 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 06 16 00.B3 [Glass-Mat Gypsum] [Cellulose Fiber-Reinforced Gypsum] [Fiberboard] Wall Sheathing 07 13 53 Elastomeric Sheet Waterproofing 07 21 00.A Thermal Insulation 07 21 00.G Mineral-Wool Blanket 07 21 00.H Mineral-Wool Board 07 26 00 Vapor Retarders 07 27 13.A1 Modified Bituminous Sheet Air Barrier, Vapor Retarding 07 27 13.C2 Elastomeric Sheet Flashing 07 42 13.G1 Metal Composite Wall Panel, [Clip Attachment] [Subgirt And Spline] [Track Support] [Rainscreen Principle] Assembly 07 62 00 Sheet Metal Flashing and Trim 07 62 00.B Flashing 07 81 00.A Sprayed Fire Resistive Material 07 95 13.B2 08 44 13 Glazed Aluminum Curtain Walls 08 80 00 Glazing 09 29 00 Gypsum Board 6 1 1/2" = 1'-0" WALL SECTION - WHEELCHAIR STORAGE - Callout 1 5 1 1/2" = 1'-0" WHEEL CHAIR STORAGE FOUNDATION AND FOOTING DETAIL LEVEL 03 126' - 11" S 6" WALL BASE TO MATCH EXIST LOBBY EXIST STONE MASONRY WALL CONSTRUCTION 05 40 00.F1 06 42 16 WD-1 HEAVY DUTY Z CLIP, 16 INCHES O.C. LEVEL 05 152' - 11" S 06 42 16 WD-1 05 40 00.C 05 40 00.B 05 40 00.F1 HEAVY DUTY Z CLIP, 16 INCHES O.C. EXIST STONE MASONRY WALL CONSTRUCTION EXIST FLOOR SLAB WD-1 1' - 6 1/2" 2' - 9" LEVEL 04 140' - 11" S 1/4" EXIST STONE MASONRY WALL CONSTRUCTION 05 40 00.B 05 40 00.C 5 1/2" 11 1/2" 05 40 00.F1 HEAVY DUTY Z CLIP, 16 INCHES O.C. 06 42 16 WD-1 WD -1 LEVEL 03 DD#5 140' - 11" KEYNOTES LEVEL 05 152' - 11" 05 40 00 05 40 00 09 29 00 08 44 13 08 80 00 05 40 00 LEVEL 04 140' - 11" 05 40 00 09 29 00 08 44 13 08 80 00 07 21 00.H 07 42 13.G1 07 21 00.H 05 40 00 08 80 00 08 44 13 09 29 00 05 40 00 05 40 00 09 29 00 05 40 00 05 40 00 LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" 08 80 00 08 44 13 04 42 00 06 16 00.A1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9 0: 8 0: 4 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-02 EXTERIOR SECTION DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" WALL @ LEVEL 03 (COL LINE S) 3 1 1/2" = 1'-0" WALL @ LEVEL 4 CEILING (COL LINE S)) 2 1 1/2" = 1'-0" WALL @ LEVEL 04 (COL LINE S) 04 42 00 Exterior Stone Cladding 05 40 00 Cold-Formed Metal Framing 05 40 00.B Steel Stud 05 40 00.C Steel Track 05 40 00.F1 Deflection Clip 06 16 00.A1 [Preservative-Treated] [Fire-Retardant-Treated] Plywood 06 42 16 WD-1 FLUSH WOOD PANELING 07 21 00.H Mineral-Wool Board 07 42 13.G1 Metal Composite Wall Panel, [Clip Attachment] [Subgirt And Spline] [Track Support] [Rainscreen Principle] Assembly 08 44 13 Glazed Aluminum Curtain Walls 08 80 00 Glazing 09 29 00 Gypsum Board 4 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 1 5 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 2 6 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 3


LEVEL 03 126' - 11" S 6" WALL BASE TO MATCH EXIST LOBBY EXIST STONE MASONRY WALL CONSTRUCTION 05 40 00.F1 06 42 16 WD-1 HEAVY DUTY Z CLIP, 16 INCHES O.C. LEVEL 05 152' - 11" S 06 42 16 WD-1 05 40 00.C 05 40 00.B 05 40 00.F1 HEAVY DUTY Z CLIP, 16 INCHES O.C. EXIST STONE MASONRY WALL CONSTRUCTION EXIST FLOOR SLAB WD-1 1' - 6 1/2" 2' - 9" LEVEL 04 140' - 11" S 1/4" EXIST STONE MASONRY WALL CONSTRUCTION 05 40 00.B 05 40 00.C 5 1/2" 11 1/2" 05 40 00.F1 HEAVY DUTY Z CLIP, 16 INCHES O.C. 06 42 16 WD-1 WD -1 LEVEL 03 DD#5 140' - 11" KEYNOTES LEVEL 05 152' - 11" 05 40 00 05 40 00 09 29 00 08 44 13 08 80 00 05 40 00 LEVEL 04 140' - 11" 05 40 00 09 29 00 08 44 13 08 80 00 07 21 00.H 07 42 13.G1 07 21 00.H 05 40 00 08 80 00 08 44 13 09 29 00 05 40 00 05 40 00 09 29 00 05 40 00 05 40 00 LEVEL 03 DD#5 140' - 11" LEVEL 03 126' - 11" 08 80 00 08 44 13 04 42 00 06 16 00.A1 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9 0: 8 0: 4 PM BIM 360:/ B/ ays at te Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-02 EXTERIOR SECTION DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" WALL @ LEVEL 03 (COL LINE S) 3 1 1/2" = 1'-0" WALL @ LEVEL 4 CEILING (COL LINE S)) 2 1 1/2" = 1'-0" WALL @ LEVEL 04 (COL LINE S) 04 42 00 Exterior Stone Cladding 05 40 00 Cold-Formed Metal Framing 05 40 00.B Steel Stud 05 40 00.C Steel Track 05 40 00.F1 Deflection Clip 06 16 00.A1 [Preservative-Treated] [Fire-Retardant-Treated] Plywood 06 42 16 WD-1 FLUSH WOOD PANELING 07 21 00.H Mineral-Wool Board 07 42 13.G1 Metal Composite Wall Panel, [Clip Attachment] [Subgirt And Spline] [Track Support] [Rainscreen Principle] Assembly 08 44 13 Glazed Aluminum Curtain Walls 08 80 00 Glazing 09 29 00 Gypsum Board 4 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 1 5 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 2 6 1 1/2" = 1'-0" WALL SECTION - SURGICAL LOBBY (E-W) - Callout 3 Construction Drawings: Exterior Section Details


Construction Drawings: Plan Details DEMO PARTIAL INSULATION DEMO MASONRY VENEER 07 27 13 OVERLAPPING WITH EXIST AVB 08 44 13.B2 08 44 13.G EXIST EXTERIOR MASONRY WALL CONSTRUCTION 07 21 00.D 09 29 00.A 15 T KEYNOTES 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9 1: 1 3: 6 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-11 EXTERIOR PLAN DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" PLAN DETAILS - CURTAIN WALL JAMB @ COLUMNS 07 21 00.D Polyisocyanurate Foam-Plastic Board 07 27 13 Modified Bituminous Sheet Air Barriers 08 44 13.B2 Curtain Wall Mullion 08 44 13.G Curtain Wall Glazing 09 29 00.A Interior Gypsum Board 13 O B41 04 43 13 07 21 00.D 07 27 13 TO MATCH EXIST ADJACENT MASONRY WALL EXIST EXTERIOR MASONRY WALL CONSTRUCTION OVERLAPPING WITH EXIST AVB LAYER DEMO MASONRY VENEER 08 44 13.G 08 44 13.B2 B41 12 B41 08 44 13.B2 08 44 13.G EXIST EXTERIOR MASONRY WALL CONSTRUCTION DEMO CURTAIN WALL DEMO EXIST WALL EXIST CURTAIN WALL DEMO MASONRY VENEER 07 27 13 OVERLAPPING WITH EXIST AVB LAYER DEMO EXIST INSULATION 07 21 00.D KEYNOTES 0 1/2" 1" 2" CONSULTANTS SHEET NUMBER TITLE Approved Checked Job Number ISSUE CHART DPH PART 1 SUBMISSION 5.29.2020 6 8/ 2/ 020 9 1: 3 4: 9 PM B MI 360:/ B/ ays at et Medical- HoF – Surgery and Proc/HoF Surgery Expansion v2020.rvt BMC HOF OR & Interventional Relocation and Lobby Expansion Copyright © A44-10 Perkins&Will 759 Chestnut St Springfield, MA 01199 BAYSTATE HEALTH A32-12 EXTERIOR PLAN DETAILS Checker 152217.000 Approver BVH STRUCTURAL ENGINEERING One Gateway Center Newton, MA t 617.658.9008 BVH MEP ENGINEERING One Gateway Center Newton, MA t 617.658.9008 VDA VERTICAL TRANSPORTATION 101 Summer Street Boston, MA t 617.574.5099 CODE RED LIFE SAFETY 154 Turnpike Road, Suite 200 Southborough, MA t 617.500.7633 ACENTECH ACOUSTICS 33 Moulton Street Cambridge, MA t 617.499.8000 CAMPBELL McCABE HARDWARE 63 Great Road Maynard, MA t 781.899.8822 DPR PART I 5/29/2020 225 Franklin Street, Suite 1100 Boston, MA 02110 t 617.478.0300 f 617.478.0321 perkinswill.com 1 1 1/2" = 1'-0" PLAN DETAIL - CURTAINWALL @ LOBBY (COL LINE 13) 2 1 1/2" = 1'-0" PLAN DETAIL - CURTAINWALL JAMB @ LOBBY (COL LINE 12) 04 43 13 Stone Masonry Veneer 07 21 00.D Polyisocyanurate Foam-Plastic Board 07 27 13 Modified Bituminous Sheet Air Barriers 08 44 13.B2 Curtain Wall Mullion 08 44 13.G Curtain Wall Glazing


Hospital of The Future: Care Unit's The main effort of the BMC - HoF - Surgical Expansion project was on level 02. This levels program consisted of 64 PACU Bays (or care unit's), 26 operating rooms including 4 Cath OR's, 2 EP OR's, a Neruo OR, a CT OR, 18 General OR's and one Pediatric OR. The Healthcare Team at Perkins&Will and I were tasked with exploring possible plan layouts in order to maximize the amount of Care Units that would fit in the shell space that existed on this level. Once we had working plan layouts we coordinated with our consultants and equipment planner to lay out what would go in each bay. Myself and Eugenie Jeong came up with 2 design options for interior finishes for the PACU Bays and staff stations. The client eneded up wanting both of the options so 32 bays on the east will get finishes from option one, and 32 bays to the west will get finishes from option two. Head Wall Patient Lights: I was tasked to complete a study of the lighting in the patient head wall and propose a connection. and coordinate this connection with product manufacturers, our electrical consultant form BVH, and our contractor DPR to understand how this fixture was going to slot into each heatwall and how the finishes would terminate into the fixture. Detail Option 1 Detail Option 2


Staff Station: Option 1 Staff Station: Option 2


Hospital of The Future: Pediatric Units Pedi Units Pedi OR Inside of the Care unit we were asked to study which bays in the PACU should be pediatric units and identify how connections can be made from the Pedi units to the Pediatric OR. We determined that the best course of action would be situate all of the unites to the east closest to the Pediatric OR. There was also an Awkward corridor that was still technically zoned to be staff only. This corridor connection we decided was going to be the pediatric approach to the OR's where we would use the same custom printed graphics to clad the walls in order to create a less intimidating environment. The Graphic artwork here that will be custom printed onto fiber glass reinforced laminate was designed by an artist in western Massachusetts who has passed away before the project began. The artwork can be also seen in the Children’s hospital inside of BMC. I was able to take low quality PNG's and recreate these artworks into vector duplicates that are scaleless.


Digital Artwork that I created as an addition to this collection that I recreated. This image is a collage of parts from all of the graphics that were included in the series that the client had owned. While re-creating the images to get higher resolution images I was able to break down the graphics into their constituent parts and use them to design another to be used in the series. Digital Recreations Digital Additions 12'-0"


Hospital of The Future: 100% CD Details 5 xA 8 1/4" 05 40 00 10 44 13 07 21 00.B 07 95 00.C 07 95 00 10" 8" 10 1/2" 07 92 00 1/2" 1/2" 07 42 13.D3 07 42 13.Q 07 42 13.G 6 3/4" 8 1/2" 2" 5 1 1/2" = 1'-0" LEVEL 04 CONNECTOR - NORTH EXPANSION 5 6 3/4" 8 1/2" 07 42 13.G 07 42 13.Q 07 21 00.B 05 40 00 07 95 00.C 07 92 00 8" 8" 07 21 00.H 07 42 13.D3 05 40 00 07 26 00 07 95 00 8 1/4" 2" 4 1 1/2" = 1'-0" LEVEL 04 CONNECTOR - SOUTH EXPANSION


LEVEL 04 140' - 11" 5 - 140' - 11" 2' - 8" 08 51 13 07 92 00 07 27 13.A1 07 53 23.A 1" 8 1/2" 5 3/4" 10 44 13 5/8" THERMAL CLIP, TYP 09 29 00 5" 3 1/2" 07 62 00.A 07 21 00.B FOIL FACED 07 21 00.G 12 36 61.A2 1/2" 07 62 00.B 07 27 13.C2 05 50 00 1 1 1 1/2" = 1'-0" LEVEL 04 CONNECTOR - WINDOW SILL LEVEL 05 152' - 11" 5 EOS 9" 2' - 8" 3' - 11" 3" 10 44 13 2 1/2" 07 21 00.B 07 84 46.A1 1/2" 3/4" 5" 3 1/2" 07 92 00 08 51 13 07 42 13.G 2' - 7 3/4" 1/4" 09 29 00 09 29 00.E 2' - 3 1/2" 05 12 00 10 44 13 07 21 00.B 1' - 6" 2" 7 1/2" 07 95 00.C 07 42 13.Q 2" 3' - 0" 3 1 1/2" = 1'-0" LEVEL 04 CONNECTOR - WINDOW HEAD


S EXIST HVAC DUCTWORK W/ INSUL, SEE MECH DRAWINGS 5' - 1" EXIST PARTITION EXIST BEAM DEMO RATED MTL PANEL WALL 5' - 9 3/4" 40.00° 9" 09 29 00.A2 06 42 16 WD-1 05 40 00.F1 05 40 00 05 40 00.H 09 29 00.A2 05 40 00.A


LEVEL 04 140' - 11" S - 140' - 11" DG-2 DEMO RATED MTL PANEL WALL 1/4 TYP. " 3' - 0" EXIST METAL PANEL WALL CONSTRUCTION (2) LAYERS, PT-11 BEHIND GLASS "9 - '1 "4 - '3 BEAM ENCLOSURE BEYOND 1" 1/4" Z CLIP, 16 INCHES O.C. AS REQ 06 42 16 WD-1 05 40 00 7" 5 3/4" 07 42 13.G 06 16 00.A1 08 81 13


Prudential Center Model Boston, Massachusetts Level 50 Level 51 Level 52 Perkins & Will The goal of this model was to understand the current in a diffrent medium the current design of the prudential center overservation deck renovation which includes a bar, outdoor patio, observation deck, and Mall enterance. The modeds were done by myself and Ryan Batmane and were meant to study the projects design outcomes in model form.


Portal Study High Density Foam 2 Layers Acrylic -Forsted Mullions -Clear Glazing Fold Open Seam Teir 1 Teir 4 Teir 2 Teir 5 Teir 3 Teir 6 3D Printed ABS


2021


2021


Thesis: An Embracive Architecture Thesis Studio, BAC


9.0 NOLA 2200 While researching New Orleans, one of the first aspects of the city I found myself fascinated by was its population distribution. Having read Daanish Mustafa, Sara Ahmed, Eva Sarocha, and Heather Bell’s “Pinning Down Vulnerability: from narratives to numbers” I understood that NOLA’s population density drastically changed after Katrina in 2005 and has been slowly growing back ever since. The concept of White Latin Black 300 People 4000 People Population Density population shift post natural disaster is something that I have a hard time trying to think about as personally I have never been put in the situation where I am a climate refugee. Being a Climate refuge in the 21st century is becoming more and more of a reality for individuals around the world who live in vulnerable areas susceptible to the symptoms of climate change. Over the next few decades, Climate refugees are something that America NOLA Population Density 2020


Click to View FlipBook Version