The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by cool.pvk, 2016-07-17 02:06:03

tour

RIGHT WEIGHING SYSTEM

#255(N) #132(O), Lingi Chetty Street, 1st Flo

Tour Report cum Expenses

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

10.04.2016 Sanath Nagar Khammam Vijayawada
Vijayawada Hyderabad
11.04.2016 Dilshuknagar Erragada
Erragada Dilshuknagar
12.04.2016 Dilshuknagar Secendrabad
Secendrabad Sanathnagar
13.04.2016 Sanath Nagar Dilshuknagar
Dilshuknagar Erragada
15.04.2016 Jammikunta Erragada Dilshuknagar
Dilshuknagar LB Nagar
18.04.2016 Samalkot LB Nagar Khammam
19.04.2016 Khammam Warangal
Warangal Hanumakonda
20.04.2016 Hanumakonda Jammikunta
21.04.2016 Krishna Canal Jammikunta FCI
FCI Jammikunta
Jammikunta Hanumakonda
Hanumakonda Warangal
Warangal Khammam
Khammam Vijayawada
Vijayawada Kakinada
Kakinada Samalkot
Samalkot FCI
FCI Samalkot
Samalkot Kakinada
Kakinada Vijayawada
Vijayawada Khammam
Khammam Vijayawada

MS & SERVICES

oor, CHENNAI (Tamilnadu).

s Clam sheet

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 170.00 260.00 3780.00 4210.00 5060.00
Bus 850.00 260.00 850.00
Bus 80.00 260.00 340.00 420.00
Bus 80.00 260.00 80.00
Auto 50.00 310.00 425.00
Bus 35.00 260.00 35.00
Bus 80.00 80.00
Bus 80.00 260.00 340.00 820.00
Bus 80.00 260.00 800.00 80.00
Auto 20.00 20.00
Bus 380.00 260.00 380.00
Bus 130.00 260.00 2100.00 390.00 915.00
Auto 25.00 25.00
Bus 150.00 150.00
Auto 20.00 20.00
Auto 20.00 20.00
Bus 150.00 150.00
Auto 30.00 30.00
Bus 130.00 130.00
Bus 170.00 430.00 730.00
Bus 300.00 300.00
Auto 30.00
Auto 40.00 1090.00 1510.00
Auto 50.00 40.00
Bus 30.00 50.00
Bus 300.00 30.00
Bus 170.00
Bus 170.00 300.00
430.00 430.00
2530.00 2650.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

22.04.2016 Elluru / Nidadavolu Vijayawada KC Canal
KC Canal Vijayawada
23.04.2016 Vijayawada Elluru
Elluru AC Office
25.04.2016 Nidadavolu AC Office Bus Stand
Elluru Vijayawada
26.04.2016 Vijayawada Elluru
27.04.2016 Elluru AC Office
28.04.2016 Samalkot AC Office Bus Stand
Elluru Vijayawada
29.04.2016 Cherlapalli Vijayawada Khammam
30.04.2016 Khammam Vijayawada
Vijayawada Elluru
Elluru AC Office
AC Office Elluru
Elluru AC Office
AC Office Elluru
Elluru Tadepalligudem
Tadepalligudem Nidadavolu
Nidadavolu Rajahmundry
Rajahmundry Samalkot
Samalkot FCI
FCI Samalkot
Samalkot Rajahmundry
Rajahmundry LB Nagar
LB Nagar Uppal
Uppal Hubsiguda
Hubsiguda Nacharam
Nacharam FCI (Cherlapalli)
Cherapalli Hubsiguda
Hubsiguda Uppal
Uppal LB Nagar
LB Nagar Khammam

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Auto 60.00 260.00 60.00
Auto 60.00 60.00
Bus 120.00 260.00 380.00 570.00
Auto 30.00 30.00
Auto 40.00 260.00 1200.00 40.00
Bus 120.00 120.00
Bus 120.00 260.00 380.00 740.00
Auto 30.00 260.00 30.00
Auto 40.00 260.00 1200.00 40.00
Bus 120.00 120.00
Bus 170.00 260.00 170.00
Bus 170.00 260.00 1630.00 1825.00
Bus 120.00 120.00
Auto 35.00 35.00
Auto 40.00 40.00
Auto 30.00 290.00 320.00
Auto 30.00 30.00
Bus 80.00 340.00 440.00
Auto 40.00 40.00
Bus 60.00 60.00
Bus 40.00 1500.00 1630.00
Auto 50.00 50.00
Auto 40.00 40.00
Bus 40.00 40.00
Bus 870.00 1130.00 1130.00
Auto 20.00 280.00 820.00
Auto 20.00 20.00
Auto 20.00 20.00
Auto 80.00 80.00
bike
Auto 0.00 0.00
Auto 20.00 20.00
Bus 20.00 20.00
380.00 380.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

07.05.2016 Sanath Nagar Khammam LB Nagar
LB Nagar Dilshuknagar
Dilshuknagar Erragada
Erragada Dilshuknagar

08.05.2016 Dilshuknagar Nampalli
09.05.2016 Nampalli Erragada
Erragada Dilshuknagar
10.05.2016 Dilshuknagar Secendrabad
11.05.2016 Nalgonda Secendrabad Dilshuknagar
Dilshuknagar Nalgonda
13.05.2016 Sanath Nagar Nalgonda FCI
FCI Nalgonda
14.05.2016 Nalgonda Suryapet
15.05.2016 Suryapet Khammam
16.05.2016 Khammam LB Nagar
17.05.2016 LB Nagar Dilshuknagar
18.05.2016 Dilshuknagar Secendrabad
19.05.2016 Secendrabad Dilshuknagar
Dilshuknagar Secendrabad
Secendrabad Dilshuknagar

Dilshuknagar Erragada
Erragada Dilshuknagar
Dilshuknagar Secendrabad
Secendrabad Dilshuknagar
Dilshuknagar Erragada
Erragada Dilshuknagar
Dilshuknagar Secendrabad
Secendrabad Erragada
Erragada Dilshuknagar
Dilshuknagar LB Nagar
LB Nagar Khammam

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 380.00 260.00 3240.00 3880.00 4060.00
Auto 20.00 20.00
Bus 80.00 260.00 80.00
Bus 80.00 260.00 80.00

Bus 55.00 260.00 260.00 260.00
Bus 34.00 260.00 315.00 429.00
Bus 80.00
Bus 45.00 260.00 5370.00 34.00
Auto 60.00 80.00
Bus 150.00 260.00 305.00 365.00
Auto 40.00 260.00 60.00
Auto 20.00 260.00 410.00 660.00
Bus 80.00 260.00 40.00
Bus 110.00 260.00 20.00
Bus 380.00 260.00 80.00
Auto 20.00 110.00
Auto 60.00 6010.00 6145.00
Bus 55.00 20.00
Auto 50.00 60.00
Bus 48.00 55.00
310.00 358.00
Bus 80.00 48.00
Bus 80.00 260.00 260.00
Bus 55.00 340.00 420.00
Bus 55.00 80.00
Bus 80.00 315.00 370.00
Bus 80.00 55.00
Bus 50.00 340.00 420.00
Bus 50.00 80.00
Bus 80.00 310.00 840.00
Auto 20.00 50.00
Bus 380.00 80.00
20.00
380.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

21.05.2016 Sattenapalli Khammam Vijayawada
Vijayawada Guntur
23.05.2016 Elluru Guntur Narsaraopet
24.05.2016 Gudivada Narsaraopet DI Office
25.05.2016 Perrur DI Office Narsaraopet
Narsaraopet Vijayawada
26.05.2016 Vijayawada Khammam
Khammam Vijayawada
27.05.2016 Vijayawada Elluru
28.05.2016 Sattenapalli Elluru FCI
30.05.2016 Nalgonda FCI Elluru
Elluru Gudiwada
Gudiwada Malaipallem
Malaipallem Gudiwada
Gudiwada Vijayawada
Vijayawada Rajahmundry
Rajahmundry Kakinada
Kakinada DI Office
DI Office Kakinada
Kakinada Rajahmundry
Rajahmundry Amalapuram
Amalapuram Perrur
Perrur FCI
FCI Perrur
Perrur Amalapuram
Amalapuram Rajahmundry
Rajahmundry Vijayawada
Vijayawada Khammam
Khammam Vijayawada
Vijayawada Khammam
Khammam Suryapet
Suryapet Nalgonda
Nalgonda FCI

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 170.00 260.00 430.00 960.00
Bus 70.00 70.00
Bus 90.00 260.00 1600.00 90.00
Auto 30.00 260.00 30.00
Auto 20.00 260.00 1260.00 20.00
Bus 150.00
Bus 170.00 260.00 150.00
Bus 170.00 170.00
Bus 110.00 260.00 2030.00 2200.00
Auto 30.00 260.00 110.00
Auto 30.00 260.00 1200.00
Bus 50.00 30.00
Auto 20.00 30.00
Auto 20.00 310.00 440.00
Bus 90.00 20.00
Bus 260.00 20.00
Bus 90.00 90.00
Auto 40.00 1780.00 2055.00
Auto 35.00 90.00
Bus 110.00 40.00
Bus 120.00 35.00
Bus 45.00 110.00
Auto 50.00 380.00 705.00
Auto 50.00 45.00
Bus 60.00 50.00
Bus 120.00 50.00
Bus 245.00 60.00
Bus 170.00 120.00
Bus 170.00 505.00 675.00
Bus 170.00 170.00
Bus 110.00 430.00 600.00
Bus 80.00 170.00
Auto 40.00 1570.00 1720.00
80.00
40.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

31.05.2016 FCI Nalgonda
Nalgonda FCI
01.06.2016 FCI Nalgonda
Nalgonda FCI
07.06.2016 Sattenapalli FCI Nalgonda
Nalgonda Suryapet
08.06.2016 Suryapet Khammam
Khammam Vijayawada
10.06.2016 Kazipet Vijayawada Guntur
Guntur Narsaraopet
11.06.2016 Narsaraopet DI Office
13.06.2016 Sattenapalli DI Office Narsaraopet
Narsaraopet Guntur
14.06.2016 Kakinada Guntur Sattenapalli
Sattenapalli FCI
FCI Sattenapalli
Sattenapalli Guntur
Guntur Vijayawada
Vijayawada Khammam
Khammam Warangal
Warangal Kazipet
Kazipet Warangal
Warangal Khammam
Khammam Vijayawada
Vijayawada Guntur
Guntur Sattenapalli
Sattenapalli FCI
FCI Sattenapalli
Sattenapalli Guntur
Guntur Vijayawada
Vijayawada Rajahmundry
Rajahmundry Kakinada
Kakinada DI Office

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Auto 30.00 260.00 30.00
Auto 35.00 260.00 295.00 325.00
Auto 30.00 260.00
Auto 40.00 30.00
Auto 40.00 260.00 300.00 540.00
Bus 80.00
Bus 120.00 260.00 40.00
Bus 170.00 260.00 80.00
Bus 70.00 260.00 800.00 120.00
Bus 90.00 430.00 760.00
Auto 40.00 260.00 1300.00 70.00
Auto 40.00 90.00
Bus 90.00 40.00
Bus 70.00 40.00
Auto 30.00 90.00
Auto 20.00 330.00 680.00
Bus 70.00 30.00
Bus 50.00 20.00
Bus 180.00 70.00
Bus 140.00 50.00
Bus 40.00 180.00
Bus 40.00 400.00 480.00
Bus 130.00 40.00
Bus 180.00 40.00
Bus 60.00 390.00 390.00
Bus 65.00 1240.00 1830.00
Auto 40.00 60.00
Auto 40.00 65.00
Bus 70.00 40.00
Bus 55.00 40.00
Bus 260.00 70.00
Bus 120.00 55.00
Auto 30.00 260.00
1680.00 1730.00
30.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

15.06.2016 DI Office Kakinada
Kakinada DI Office
16.06.2016 DI Office Kakinada
Kakinada FCI
17.06.2016 Sattenapalli FCI Kakinada
Kakinada Samalkot
21.06.2016 Krishna Canal Samalkot FCI
22.06.2016 FCI Samalkot
Samalkot Kakinada
23.06.2016 Dichpalli Kakinada Vijayawada
24.06.2016 Vijayawada Guntur
Guntur Sattenapalli
25.06.2016 Sattenapalli FCI
FCI Sattenapalli
27.06.2016 Biccavolu Sattenapalli Guntur
28.06.2016 Guntur Vijayawada
Vijayawada Khammam
Khammam Vijayawada
Vijayawada KC Canal
KC Canal Vijayawada
Vijayawada Khammam
Khammam Hyderabad
Hyderabad Nizamabad
Nizamabad Dichpalli
Dichpalli Nizamabad
Nizamabad Hyderabad
Hyderabad Dilshuknagar
Dilshuknagar LB Nagar
LB Nagar Khammam
Khammam Vijayawada
Vijayawada Rajahmundry
Rajahmundry Biccavolu
Biccavolu FCI

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Auto 20.00 260.00 20.00
Auto 40.00 260.00 300.00 320.00
Auto 20.00
Auto 40.00 260.00 20.00
Auto 40.00 300.00 770.00
Auto 30.00 260.00 750.00
Auto 40.00 260.00 40.00
Auto 20.00 260.00 30.00
Auto 40.00 260.00 735.00 40.00
Bus 300.00 20.00
Bus 70.00 260.00 40.00
Bus 65.00 260.00 630.00 300.00
Auto 30.00 260.00 650.00 330.00 750.00
Auto 20.00 65.00
Bus 65.00 30.00
Bus 70.00 20.00
Bus 170.00 65.00
Bus 170.00 70.00
Auto 50.00 170.00
Auto 60.00 1180.00 1180.00
Bus 170.00 310.00 540.00
Bus 380.00 60.00
Bus 280.00 170.00
Bus 30.00 640.00 640.00
Auto 40.00 1275.00 1625.00
Bus 280.00 30.00
Auto 30.00 40.00
Auto 20.00 280.00
Bus 380.00 290.00 690.00
Bus 170.00 20.00
Bus 280.00 380.00
Bus 55.00 1060.00 1340.00
Auto 30.00 280.00
965.00 1095.00
30.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Visit Site From To

29.06.2016 FCI Biccavolu
30.06.2016 Gudivada Biccavolu Kakinada
Kakinada Vijayawada
Vijayawada Gudivada
Gudiwada Malaipallem
Malaipallem Gudiwada
Gudiwada Vijayawada
Vijayawada Khammam

TOTAL

Sign: Associate Authorised by

Name : Vijaya Kumar Pallapti

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Auto 20.00 260.00 735.00 20.00
Bus 80.00 260.00 80.00
Bus 300.00 1295.00 1295.00
Bus 90.00 350.00 670.00
Auto 30.00 30.00
Auto 30.00 30.00
Bus 90.00 90.00
Bus 170.00 170.00

19857.00 14820.00 27350.00 0.00
62027.00 62027.00

Approved by

RIGHT WEIGHING SYSTEMS & SERVICES

#255(N) #132(O), Lingi Chetty Street, 1st Floor, CHENNAI (Tamilnadu).

Tour Report cum Expenses Clam sheet

Name of the Associate: Vijaya Kumar P Employ No:
Designation:
Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Cr Amount Mislaneous Day Ex Balance

10.04.2016 3,000.00 5,060.00 -5,060.00
4,000.00 420.00 -5,480.00
11.04.2016 0.00 -2,480.00
425.00 -2,905.00
12.04.2016 BY TRANSFER-INB SAI advance-- 820.00 -3,725.00
915.00 -4,640.00
12.04.2016 0.00
730.00 -640.00
13.04.2016 -1,370.00
1,510.00 -2,880.00
15.04.2016 430.00 -3,310.00
-5,960.00
18.04.2016 BY TRANSFER-INB SAMALKT-- 2,650.00 -6,530.00
570.00 -7,270.00
18.04.2016 740.00 -3,270.00
0.00 -5,095.00
19.04.2016 -5,415.00
1,825.00 9,585.00
20.04.2016 320.00 12,585.00
0.00 -5,855.00
21.04.2016 0.00 -7,485.00
440.00 -8,615.00
22.04.2016 -9,435.00
1,630.00 -10,035.00
23.04.2016 1,130.00 6,965.00
-10,035.00
25.04.2016 BY TRANSFER-INB SAI Advance-- 4,000.00 820.00 -7,035.00
0.00 -11,095.00
25.04.2016 0.00 -11,355.00
0.00 -8,355.00
26.04.2016 0.00 -8,934.00
-9,299.00
27.04.2016 BY TRANSFER-INB-- 15,000.00 4,060.00 -9,959.00
3,000.00 260.00 -16,104.00
27.04.2016 BY TRANSFER-INB SAI for nidadavolu stamp-- 0.00 -16,462.00
429.00 3,538.00
27.04.2016 Nidadavolu New Stamping 18,000.00 365.00 3,278.00
660.00 9,278.00
28.04.2016 8,858.00
6,145.00 8,488.00
29.04.2016 358.00 8,068.00
0.00 14,068.00
30.04.2016 260.00 -16,772.00
0.00 -1,772.00
Apr'16 Phone Bill (AirTel 299 x 2 = 598+249 = 847) 600.00 420.00 -2,732.00
17,000.00 370.00 -13,432.00
02.05.2016 BY TRANSFER-INB SAI salary-- 17,000.00 420.00
3,000.00 0.00
Apr'16 Salary 840.00
0.00
07.05.2016 BY TRANSFER-INB SAIRAM-- 960.00

07.05.2016 2,200.00

08.05.2016

09.05.2016 BY TRANSFER-INB sai ADVANCE-- 3,000.00

09.05.2016 Shama Sardar Travels (SanathNagar Indicator) 150.00

10.05.2016

11.05.2016

13.05.2016

14.05.2016

15.05.2016 BY TRANSFER-INB SANATH STPG-- 20,000.00
6,000.00
15.05.2016

16.05.2016 BY TRANSFER-INB SANATH NGR--

16.05.2016

17.05.2016

18.05.2016

19.05.2016 BY TRANSFER-INB HYD-- 6,000.00
15,000.00
19.05.2016 Sanath Nagar New Stamping 30,000.00
8,500.00
21.05.2016 BY TRANSFER-INB SAI for eluru stamp--

21.05.2016

23.05.2016 Eluru Stamping

Name of the Associate: Vijaya Kumar P Employ No:
Designation:
Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

Date Cr Amount Mislaneous Day Ex Balance

24.05.2016 BY TRANSFER-INB SAI for peruru and ditcha-- 20,000.00 9,500.00 0.00 6,568.00
24.05.2016 600.00 440.00 6,128.00
25.05.2016 17,000.00 2,055.00 4,073.00
26.05.2016 Peruru Stamping 15,000.00 705.00 -6,132.00
27.05.2016 675.00 -6,807.00
28.05.2016 12,000.00 600.00 -7,407.00
29.05.2016 5,000.00 -7,407.00
30.05.2016 0.00 -9,127.00
31.05.2016 12,000.00 1,720.00 -9,452.00
May'16 Phone Bill (AirTel 299 x 2 = 598+249 = 847) 3,000.00 -10,052.00
01.06.2016 4,000.00 325.00 -10,592.00
06.06.2016 BY TRANSFER-INB SAI salary-- 0.00 6,408.00
187,000.00 -10,592.00
May'16 Salary 187,000.00 540.00 4,408.00
07.06.2016 BY TRANSFER-INB SAI for s pally stamping-- 3,648.00
07.06.2016 0.00 -7,352.00
08.06.2016 Sattenapalli Stamping (8500 + 2500(SF)) -13,032.00
08.06.2016 Sattenapalli Componding 17,000.00 0.00 -13,512.00
10.06.2016 -13,902.00
11.06.2016 0.00 -15,732.00
13.06.2016 -17,462.00
14.06.2016 760.00 -5,462.00
15.06.2016 BY TRANSFER-INB KKD STP-- -5,782.00
15.06.2016 11,000.00 0.00 -16,052.00
16.06.2016 Kakinada Stamping -11,052.00
17.06.2016 BY TRANSFER-INB SAI advance-- 5,000.00 680.00 -11,802.00
17.06.2016 -12,982.00
21.06.2016 480.00 -13,522.00
22.06.2016 -14,162.00
23.06.2016 390.00 -2,162.00
24.06.2016 BY TRANSFER-INB for ditchapally stamping-- -13,787.00
24.06.2016 Dichpalli Stamping (8500 + 1500) 1,830.00 -10,787.00
24.06.2016 BY TRANSFER-INB SAI advance-- -11,477.00
25.06.2016 1,730.00 -12,817.00
27.06.2016 -13,912.00
28.06.2016 0.00 -9,912.00
29.06.2016 BY TRANSFER-INB SAI advance-- -11,207.00
29.06.2016 320.00 -11,877.00
30.06.2016 -11,877.00
9,500.00 770.00 -11,877.00
TOTAL -11,877.00
0.00

750.00

1,180.00

540.00

640.00

0.00

10,000.00 1,625.00

0.00

690.00

1,340.00

1,095.00

0.00

1,295.00

670.00

0.00

136,850.00 62,027.00

198,877.00

Sign: Associate Authorised by Approved by
Name : Vijaya Kumar Pallapti

RIGHT WEIGHING SYSTEMS & SERVICES

#255(N) #132(O), Lingi Chetty Street, 1st Floor, CHENNAI (Tamilnadu).

Tour Report cum Expenses Clam sheet

Name of the Associate: Vijaya Kumar P Employ No:

Designation: Service Engineer (A.P,T.S)

Period: From To
09.04.2015 30.06.2016

S.No.: Amount
1 Total Bus and Auto Fares 19,857.00
2 Total DA Amount 14,820.00
3 Total Lodge Amount 27,350.00
4 Total Mislaneous
5 Old Due 136,850.00
Total 3,950.00
6 Total Diposit Amount
202,827.00
187,000.00

Balance -15,827.00

Balance Amount : -15,800.00

Sign: Associate Authorised by Approved by

Name : Vijaya Kumar Pallapti



RIGHT WEIGHING SYSTEM

#255(N) #132(O), Lingi Chetty Street, 1st Flo

Tour Report cum Expenses

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Visit Site From To

23.02.2016 Cherlapally Khammam LBNagar
Uppal
LBNagar Habsiguda
Nacharam
Uppal Cherlapally
Hubsiguda
Habsiguda Uppal
LBNagar
Nacharam Dilsukhnagar
Eragada
Cherlapally Nampalli
Dilsukhnagar
Hubsiguda LBNagar
Uppal
Uppal Hubsiguda
Cherlapally
LBNagar Tarnaka
Balnagar
24.02.2016 SanathNagar Dilsukhnagar Santhnagar
Dilsukhnagar
Eragada Amerpet
Eragada
Namapalli Dilsukhnagar
Amerpet
25.02.2016 Cherlapally / Sanathnagar Dilsukhnagar Eragada
Dilsukhnagar
LBNagar
Eragada
Uppal

Hubsiguda

Cherlapally

Tarnaka

Balnagar

Sanathnagar

26.02.2016 SanathNagar Dilsukhnagar

Amerpet

Eragada

27.02.2016 Dilsukhnagar

Amerpet

Eragada

28.02.2016 Sunday

29.02.2016 Dilsukhnagar

MS & SERVICES

oor, CHENNAI (Tamilnadu).

s Clam sheet

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 350.00 200.00 550.00 780.00
Auto 20.00 20.00
Auto 20.00 200.00 5600.00 20.00
Auto 20.00 200.00 20.00
Auto 60.00 60.00
Auto 50.00 200.00 50.00
Auto 20.00 200.00 20.00
Auto 20.00 200.00 20.00
Auto 20.00 200.00 20.00
Auto 80.00
Auto 50.00 5880.00 5990.00
Auto 60.00 50.00
Auto 20.00 60.00
Auto 20.00
Auto 20.00 220.00 538.00
Auto 80.00 20.00
Bus 38.00 20.00
Bus 60.00 80.00
Auto 20.00 38.00
Bus 80.00 60.00
Bus 80.00 20.00
Bus 20.00 80.00
Bus 80.00
Bus 80.00 280.00 380.00
Auto 50.00 20.00
Bus 80.00 80.00

Bus 80.00 280.00 410.00
50.00
80.00

200.00 200.00
280.00 360.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Visit Site From To

01.03.2016 SanathNagar Eragada Dilsukhnagar
Dilsukhnagar Eragada
03.03.2016 Samalkot Eragada Dilsukhnagar
Dilsukhnagar LBNagar
04.03.2016 LBNagar Khammam
05.03.2016 Khammam Vijayawada
Vijayawada Tanuku
06.03.2016 Tanuku Ravulapalem
09.03.2016 Samalkot Ravulapalem Amalapuram
Amalapuram Kakinada
10.03.2016 Kakinada DI Office
11.03.2016 Gudivada DI Office Kakinada
12.03.2016 Krishna Canal Kakinada Samalkot
Samalkot FCI
15.03.2016 Gudivada FCI Samalkot
Samalkot Kakinada
16.03.2016 Kakinada Vijayawada
Vijayawada Khammam
Khammam Vijayawada
Vijayawada Kakinada
Kakinada Samalkot
Samalkot Kakinada
Kakinada Vijayawada
Vijayawada Gudivada
Gudivada Vijayawada
Vijayawada Krishna Canal
Krishna Canal Vijayawada
Vijayawada Khammam
Khammam Vijayawada
Vijayawada Krishna Canal
Krishna Canal Vijayawada
Vijayawada Gudivada
Gudivada Malaipalem

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 80.00 200.00 80.00
Bus 80.00 280.00 760.00
Bus 80.00 200.00 1000.00
Auto 20.00 80.00
Bus 380.00 200.00 20.00
Bus 170.00 200.00 600.00 380.00
Bus 300.00 1370.00 1916.00
Bus 80.00 200.00 300.00
Bus 90.00 200.00 500.00 80.00
Bus 76.00 90.00
Auto 40.00 200.00 76.00
Auto 40.00 200.00 650.00 240.00 280.00
Bus 30.00 200.00 600.00 40.00
Auto 50.00 200.00 630.00 830.00 1260.00
Auto 50.00 50.00
Bus 30.00 200.00 1200.00 50.00
Bus 300.00 30.00
Bus 170.00 300.00
Bus 170.00 370.00 370.00
Bus 300.00 870.00 1230.00
Bus 30.00 300.00
Bus 30.00 30.00
Bus 300.00 30.00
Bus 90.00 500.00 500.00
Bus 90.00 940.00 1030.00
Auto 30.00 90.00
Auto 30.00 830.00 1030.00
Bus 170.00 30.00
Bus 170.00 170.00
Auto 30.00 1000.00 1150.00
Auto 30.00 30.00
Bus 90.00 30.00
Auto 40.00 90.00
1440.00 1560.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Visit Site From To

17.03.2016 Krishna Canal Malaipalem Gudivada
Gudivada Vijayawada
18.03.2016 Vijayawada Tenali
22.03.2016 Biccavolu Tenali Vijayawada
Vijayawada Krishna Canal
23.03.2016 Krishna Canal Vijayawada
29.03.2016 SanathNagar Vijayawada Khammam
Khammam Vijayawada
30.03.2016 Vijayawada Samalkot
31.03.2016 Samalkot Biccavolu
Biccavolu Samalkot
05.04.2016 Perur Samalkot Kakinada
Kakinada Vijayawada
Vijayawada Khammam
Khammam LBNagar
LBNagar Dilsukhnagar
Dilsukhnagar Eragada
Eragada KPHB
KPHB Pragathi Nagar
Pragathi Nagar KPHB
KPHB Eragada
Eragada Dilsukhnagar
Dilsukhnagar Eragada
Eragada Dilsukhnagar
Dilsukhnagar Eragada
Eragada Kukatpalli
Kukatpalli Alvin Colony
Alivin Colony Kukatpalli
Kukatpalli Eragada
Eragada Dilsukhnagar
Dilsukhnagar LBNagar
LBNagar Khammam
Khammam Vijayawada

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Auto 30.00 200.00 30.00
Bus 90.00 200.00 90.00
Bus 40.00 200.00 840.00 240.00 350.00
Bus 50.00 200.00 50.00
Auto 30.00 200.00 30.00
Auto 30.00 30.00
Bus 170.00 200.00 1260.00 370.00 370.00
Bus 170.00 200.00 1210.00 1570.00
Bus 280.00 280.00
Bus 40.00 200.00 500.00 40.00
Auto 40.00 40.00
Auto 30.00 230.00 700.00
Bus 300.00 300.00
Bus 170.00 170.00
Bus 380.00 580.00 920.00
Auto 20.00 20.00
Bus 80.00 80.00
Auto 40.00 40.00
Auto 50.00 50.00
Auto 30.00 30.00
Auto 40.00 40.00
Bus 80.00 80.00
Bus 80.00 1540.00 1620.00
Bus 80.00 80.00
Bus 80.00 280.00 880.00
Auto 40.00 40.00
Auto 20.00 20.00
Auto 20.00 20.00
Auto 40.00 40.00
Bus 80.00 80.00
Auto 20.00 20.00
Bus 380.00 380.00
Bus 170.00 870.00 1720.00

Name of the Associate: Vijaya Kumar P
Designation: Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Visit Site From To

Vijayawada Rajahmundry
Rajahmundry Kakinada
Kakinada DI Office
DI Office Kakinada
Kakinada Vijayawada
Vijayawada Khammam

TOTAL

Sign: Associate Authorised by

Name : Vijaya Kumar Pallapti

Employ No:

Mode Fare DA Lodge Tatal Subtotal

Bus 220.00 220.00
Bus 80.00 80.00
Auto 40.00 40.00
Auto 40.00 40.00
300.00
170.00 300.00
170.00
9294.00 5200.00 13380.00
0.00
0.00
27874.00 27874.00

Approved by

RIGHT WEIGHING SYSTEMS & SERVICES

#255(N) #132(O), Lingi Chetty Street, 1st Floor, CHENNAI (Tamilnadu).

Tour Report cum Expenses Clam sheet

Name of the Associate: Vijaya Kumar P Employ No:
Designation:
Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Cr Amount Mislaneous Day Ex Balance

23.02.2016 15,000.00 16,000.00 780.00 -780.00
23.02.2016 BY TRANSFER-INB SAI ADVANCE-- 3,000.00 320.00 0.00 14,220.00
23.02.2016 BY TRANSFER-INB SAI for cherl stamp-- 0.00 17,220.00
23.02.2016 Cherlapalli Stamping 10,000.00 20,000.00 0.00
24.02.2016 Sanath Nagar Indicator 10,000.00 1,220.00
24.02.2016 BY TRANSFER-INB SAI Advance-- 10,000.00 21,798.00 5,990.00 -5,090.00
25.02.2016 0.00 4,910.00
25.02.2016 BY TRANSFER-INB SANATH NGR PAINT-- 20,000.00 4,372.00
25.02.2016 BY TRANSFER-INB sai for s.ngr painting-- 5,000.00 538.00 14,372.00
25.02.2016 Madhav rao Sanath Nagar paint 0.00 24,372.00
26.02.2016 14,000.00 152.00 0.00 4,372.00
26.02.2016 BY TRANSFER-INB SAI adv for pc-- 14,000.00 0.00 3,992.00
26.02.2016 BY TRANSFER-INB sai adv-- 23,992.00
27.02.2016 Sanath Nagar PC 17,000.00 380.00 28,992.00
28.02.2016 0.00 6,784.00
29.02.2016 Sanath Nagar Wiring Pipes 17,000.00 0.00 6,584.00
29.02.2016 BY TRANSFER-INB SAI for s ngr stamping-- 6,072.00
29.02.2016 Sanath Nagar Stamping 3,000.00 410.00 20,072.00
01.03.2016 20,000.00 200.00 6,072.00
03.03.2016 10,000.00 360.00 5,312.00
04.03.2016 3,396.00
04.03.2016 BY TRANSFER-INB sai salary-- 1,000.00 0.00 3,116.00
04.03.2016 Fed Salary 6,000.00 0.00 20,116.00
05.03.2016 760.00 3,116.00
06.03.2016 37,000.00 1,916.00 1,856.00
09.03.2016 280.00 1,486.00
09.03.2016 BY TRANSFER-INB SAI Advance-- 12,000.00 0.00
09.03.2016 BY TRANSFER-INB SAI for skot stamp-- 0.00 256.00
09.03.2016 BY TRANSFER-INB SAI for skot stamp-- 8,500.00 1,260.00 3,256.00
10.03.2016 370.00 23,256.00
10.03.2016 BY TRANSFER-INB SAI for stamping skot-- 1,230.00 33,256.00
10.03.2016 BY TRANSFER-INB-- 0.00 32,756.00
10.03.2016 Samalkot Stamping 0.00 33,756.00
11.03.2016 0.00 39,756.00
12.03.2016 500.00 2,756.00
14.03.2016 BY TRANSFER-INB SAI for gudiwada stamp-- 0.00 1,726.00
15.03.2016 0.00
16.03.2016 0.00 696.00
16.03.2016 Gudivada Stamping 1,030.00 12,696.00
17.03.2016 1,030.00 11,546.00
0.00
1,150.00 9,986.00
1,560.00 1,486.00
0.00 1,136.00
350.00

Name of the Associate: Vijaya Kumar P Employ No:
Designation:
Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

Date Cr Amount Mislaneous Day Ex Balance

18.03.2016 370.00 766.00
12,766.00
21.03.2016 BY TRANSFER-INB SAI for biccavolu stamp-- 12,000.00 0.00 11,196.00

22.03.2016 3,000.00 1,570.00 2,696.00
1,996.00
22.03.2016 Biccavolu Stamping 2,000.00 8,500.00 0.00 4,996.00
4,000.00 4,076.00
23.03.2016 17,000.00 700.00 2,456.00
1,576.00
28.03.2016 BY TRANSFER-INB SAISANDHYA-- 5,000.00 0.00 3,576.00
199,000.00 7,576.00
29.03.2016 199,000.00 920.00 6,976.00
23,976.00
30.03.2016 1,620.00 6,976.00
5,256.00
31.03.2016 880.00 10,256.00
10,256.00
31.03.2016 BY TRANSFER-INB SAI advance-- 0.00 10,256.00
10,256.00
31.03.2016 BY TRANSFER-INB SAI balance due-- 0.00

Mar'16 Phone Bill (AirTel 299 x 2 = 598+249 = 847) 600.00 0.00

04.04.2016 BY TRANSFER-INB Increment Salary-- 0.00

04.04.2016 Mar Salary 17,000.00 0.00

05.04.2016 1,720.00

08.04.2016 BY TRANSFER-INB SAI Advance-- 0.00

0.00

TOTAL 160,870.00 27,874.00

188,744.00

Sign: Associate Authorised by Approved by
Name : Vijaya Kumar Pallapti

RIGHT WEIGHING SYSTEMS & SERVICES

#255(N) #132(O), Lingi Chetty Street, 1st Floor, CHENNAI (Tamilnadu).

Tour Report cum Expenses Clam sheet

Name of the Associate: Vijaya Kumar P Employ No:

Designation: Service Engineer (A.P,T.S)

Period: From To
21.02.2015 08.04.2016

S.No.: Amount
1 Total Bus and Auto Fares 9,294.00
2 Total DA Amount 5,200.00
3 Total Lodge Amount
4 Total Mislaneous 13,380.00
5 Old Due 160,870.00
Total
6 Total Diposit Amount 14,206.00
202,950.00
199,000.00

Balance -3,950.00

Balance Amount : -4,000.00

Sign: Associate Authorised by Approved by

Name : Vijaya Kumar Pallapti


Click to View FlipBook Version