Sector 1 – 224 Units
Sector 2 – 172 Units
Sector 3 – 96 Units
Total launched: 492 Units
Remaining available units: 68
Remaining Inventory
Sector 2 -3 units
Sector 3 – 14 units
Remaining Inventory
Sector 2 – 7 units
Sector 3 – 8 units
- INNER
- END
28 65
Remaining Inventory
Sector 2 -1
Remaining Inventory
Sector 2 -35 units
•
•
•
•
How much is the construction bond?
INTERIOR
Interior works: 10,000
Processing fee: P500
Delivery fee: P500
TOTAL: P11,000
EXTERIOR
Exterior works: P20,000
Processing fee: P1,000
Delivery fee: P500
TOTAL: P21,500
How much is the move-in fee?
None, new resident just needs to
proceed to the admin office to fill-out
the move-in form.
Association dues?
P9.8/sqm per month.
Billed quarterly.
How much rent for the swimming pool?
Rate per head:
Owner rate: P100
Guest rate: P150
(w/ endorsement of owner)
How much rental rates for pavilion?
P3500 (first 5 hours) and
P300 per succeeding hour.
How they can possibly control the air pollution
brought about by BMEG.
If the issue persists, concerns can be
coursed through to the admin office.
The property manager can draft
the letter to be filed to BMEG
with the help of
the LGU/DENR
Is there a plan to prioritize the construction of
houses for those buyers who were tagged as book?
Priority to complete the units is based on
their eligibility. All sold units are
targeted to be completed by the
end of the year assuming ECQ
will be lifted by May 15.
There are lots of pending turn over units for
AS BAUAN, when will the turn over team resume?
Per CRU, no advice yet on when their
turnover team will resume due
to ECQ. Assumption is June 2020.
When will construction team resume since we need
more RFO UNITS?
Upon lift of ECQ mandated by the
government, however with assumed
limited manpower per contractor.
Construction and Amenities update.
Overall Housing Construction is at 79.80%.
353 completed, 66 ongoing,73 not yet started.
Total of 492 units for Sectors 1 to 3.
Amenities are 100% Done
(Pavilion, Swimming Pool,
Basketball Court,
Play Area)
For bungalow units do they have the required
footing to expand upwards?
No, If the owner decides to expand
their house vertically, they will have
To supersede our structural design
by consulting to their own
structural consultant
or Engineer.
Building method?
Load Bearing Blocks with compression strength
of 750 to 1000psi casted traditionally.
Blocks system.
Water pump or overhead tank?
Overhead Tank
14. Septic tank – individual or per unit
meron?
All units with individual
septic tank
Type of foundation
Mat foundation
16. Wiring – overhead/underground?
Overhead
Sewage system?
Our sewage system is connected to
our Sewage Treatment Facility
Who is the utilities provider on the area?
Electricity – First Bay
Water – As-is Balayong Waterworks
Details about the construction and materials that we use in
building our units. Some buyers noticed that we
are using smaller steel. How can we assure them that
our houses are built on highest quality standard?
All materials undergo Quality Check,
and all unit models are designed by
our Structural Consultant.
Waste Management Plan?
Waste materials are kept and segregated
in our MRF Area and regularly collected
by the local garbage collector.
Is there an area where guests of the homeowner can
park, especially if they will stay longer hours or
overnight?
No available parking for
homeowner’s guests.
Type of aircon allowed for Inner units
(especially if installed in the dividing wall between the 2 units)
No restriction on type of ACU but owners
will have to ask APMC for approval,
Window Type
(rear/front camouflaged)
not allowed to install
in common wall/firewall
23. Type of car that can park in Inner units
Cars that fit the Standard Carport Size
(3x5meters)
24. Number of guests allowed to use the amenities,
especially the swimming pool
No. of guests to be determined
by property management
25. Set-backs (front and back)
BP220 Front Setback - 1.5 meters,
Rear Setback- 2 meters,
Side setback 1.5 meters
PD957 Front Setback - 3 meters,
Rear Setback - 2 meters,
Side Setback - 2 meters
26. Gaano kasagad pwede magextend for end/inner unit?
Ground Floor
26. Gaano kasagad pwede magextend for end/inner unit?
Second Floor
27. Location of firewall per unit? – or meron ba?
Yes, side and rear
28. When the unit is combined, what is the allowed
height, length and width of the fence?
Rear –2.0 Meters
Front – 1.50 meters (Concrete 1.0 meters, Steel 0.50 meters)