The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by kanchanajackkiechai, 2021-06-04 09:24:11

WI

WI

บริษัท ไทยซมั มิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

T-Code S_P99_41000111 (Data > 1 Item)

T-Code:CK86_99(By Item)

ชือ่ เรื่อง: ขน้ั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 9 of 32

บรษิ ทั ไทยซมั มิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 1 : BIDDING PROCESS FOR NEW MODEL
P RO CED URES REPONSIB LE PERSON
START RELATED DOCUMENT

RECEIVE DRAWING FROM FROM: CUSTOMER -DRAWING
CUSTOMER TO: MARKETING --PRODUCTION ESTIMATES OR OTHER CONDITIONS OF CUSTOMER

FROM: CUSTOMER
TO: MARKETING

NO CHECK THE DETAILS AND FROM: MARKETING -DRAWING
REGULATIONS SPECIFIED IN DRAWING TO: - --PRODUCTION ESTIMATES OR OTHER CONDITIONS OF CUSTOMER

YES FROM: MARKETING -CRD, DRAWING
SEND DRAWING TO RDPP FOR ESTIMATE TO: RDPP --PRODUCTION ESTIMATES OR OTHER CONDITIONS OF CUSTOMER
COST OR PURCHASING DEPARTMENT
SOURCH THE PARTS OR RAW MATERIALS PJS -DRAWING&SPECIFICATION REQUIREMENTS (IF ANY)
PURCHASING -PRODUCTION ESTIMATES OR OTHER CONDITIONS OF CUSTOMER
YES -PROCESS PLANING STANDARD (F-DDS-003)
FROM: MARKETING - PROCESS JIG COSTING (ROUGH) (F-DDS-002)
IN THE CASE OF PARTS THAT ARE DIFFICULT TO WORK, TO: RDPP -PRODUCTION RISK ANALYSIS DOCUMENT (F-MKT-013-1)
A TECHNICAL REVIEW WILLSET TOOLING CONCEPT, -PRODUCTION FEASIBILITY STUDY DOCUMENT (F-MKT-012)
TOOLING DESIGN, DETAILS PARTS, AND MACHINE TO PJS -MEETING RECORD
PRESENT THE PRICE BY CONSIDERING PURCHASING
1) COST STRUCTURE FACTORY
2) ESTIMATE ABOUT 4M (MAN, MACHINE, METHOD,
NO MATERIAL)
3) LINE LAYOUT
4) CAPACITY
5) BUDGETING
**IF CONSIDERED AND UNABLE TO PRODUCE, THE
MARKETING WILL REJECT THE BID TOTHE CUSTOMER
BASED ON THE APPROPRIATE COMMUNICATION CHANEL.

EXTERNAL PARTS IN-HOUSE PARTS FROM: RDPP -PROCESS PLANING STANDARD (F-DDS-003)
-PURCHASING DEPARTMENT CONTACT -COST ESTIMATION FROM RDPP PURCHASING - PROCESS JIG COSTING (ROUGH) (F-DDS-002)
WITH SELLER TO PREPARE COST -COST ESTIMATION FROM PURCHASING -COST ESTIMATION OR COST BREAKDOWN FORM VENDOR
ESTIMATION FOR SENDING TO THE TO: MARKETING
DEPARTMENT. COST ESTIMATION OR COST BREAKDOWN FORM VENDOR
FROM: PURCHASING
CONSIDER LAYOUT VENDOR/ COST ESTIMATION QUOTATION TO: MARKETING -QUOTATION OR COST BREAKDOWN
-PROCESS PLANING STANDARD (F-DDS-003)
SUMMARIZE THE PRICE OFFERED FOR CUSTOMER TOCONSIDER FROM: MARKETING - PROCESS JIG COSTING (ROUGH) (F-DDS-002)
TO: RDPP -COST ESITMATION OR COST BREAKDOWN FROM VENDOR

PJS QUOTATION OR COST BREAKDOWN
PURCHASING
FACTORY NEW PROJECT COSTING REPORT

FROM: MARKETING -PARTS ORDER DOCUMENT (F-MKT-005)
TO: CUSTOMER -LIST OF SUB-COMPONENTS (F-MKT-006)
-MASTER PLAN OF PARTS (F-MKT-015)
SUMMARIZE THE NEW MODEL COSTING FROM: PROJECT LEADER DWG, SAMPLE PARTS, TAPE DATA, CD OR OTHER
TO: GM PLANT INFORMATION (IF ANY)
PREPARE DOCUMENTS SUCH AS NEW PART PRODUCTION FORM OR FROM: MARKETING -BUDGET TOOLING (F-MKT-014)
OTHER DOCUMENTS THAT IT’S REFERENCE THE PROCEDURE TO TO: GM PLANT -PROCESS PLANING STANDARD (F-DDS-003)
FOLLOW UP PARTS AND TOOLING (FLOW CHAT 2) FROM: MARKETING
KICK OFF PROJECT TO GM PLANT OR PROJECT LEADER TO: PROJECT LEADER Doc. No.: WIS-Q-082-007
REV.: 2
FINISH Page: 10 of 32

ช่ือเรื่อง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP)
TITLE: NEW MODEL (MARKETING TSGP)

บรษิ ัท ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 2: PRODUCTION FEASIBILITY STUDY FORM (F-MKT-012-0)

Production feasibility study (general customers)

CUSTOMER NAME : CUSTOMER CODE : MODEL :

Lead time to prepare the sample (if required) DWG. NO.

Lead Time in preparation before Mass Production (if required)

ITEM PART NO. PART NAME.

NOTE : In case there is already a part list, It is not necessary to specify details in this table,

but always include a list of items for consideration.

Item Details Yes No Responsible person Comment

1 Able to design & build production equipment and Maker

checke according to the plan and Spec.

2 Able to make samples according to specified Spec. / Related Factory

Drawing. department

3 Able to make samples according to the plan Related Factory

set by the customer. Department

4 Sufficient production capacity for Mass Production. Related Factory

Department

5 Materials used can be supplied according to plan. Purcharing

department

6 Summary of assessment results from various topics Meeting

NOTE: Assessment to study the feasibility mentioned above, pleasae consider the information available and past experiences .

In the case that the final assessment results is "Yes", other assessment topics that answer "NO" must be determined in advance.

Review of the above assessment results Approval of assessment results

Marketing.................. Marketing Engineer Engineering
Date ............................. Date............................. Date.............................

Related production department Related purchasing department Planing General Manager
Date ............................. Date ............................. Date ............................. Date.............................

WIS-Q-082-009 F-MKT-012-0

ช่อื เรื่อง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 11 of 32

บริษัท ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 3: RISK ANALYSIS FORM (F-MKT-013-1)

Customer name : Customer code : Risk Analysis

Leadtime to prepare the sample (if required) : Date

Leadtime in preparation before Mass Production (if required) : DWG No.

Item Part No. Part Name. Rev. No. Parts Ranking

Note : In case that there is already a part list, you do not need to include details in this table, but always include a list of items for consideration.

No. Risk Analysis Topics 1 point 2 point 3 point

1 Tooling Customer pays all Customer pay average in the parts Company pay
2 Material Price drop Normal price Price increases
3 Machine Original machine New machine
4 Labour Customer Supply Normal amount Increase amount
5 Supplier Easy / normal Local Supply Import
6 Production process Normal Hard / complicated New method
7 Parts Ranking Rank : HB Rank : HA
performance of car and don't
8 Preparation time affect the safety of the user.) (The parts have little effect on the performance of
8.1 Production equipment the car and the safety of the user.)
8.2 Production Standard period Rank : HS
8.3 Delivery Standard period
Total Standard period (The parts affect the life and safety of the user)

Period less than standard

Period less than standard

Period less than standard

Points

Note: Risk Analysis above consider the information available and past experiences.

In the case the final result of the assessment is based on the following standard:

21 - 33 = High risk level Considered by Managing Director or QAR
Marketing General Manager or GM Plant
19 - 20 =Medium risk level Considered by Manager involved

< 18 =Low risk level Considered by

Review of Risk Analysis

Low risk Medium risk High risk

----/----/---- ----/----/---- ----/----/---- ----/----/---- ----/----/---- ----/----/---- ----/----/----
Managing Director / QAR
Marketing manager Purchasing manager Planning manager Production managerEngineering manager General manager / GM Plant
F-MKT-013-1
WIS-Q-082-007

ชื่อเรื่อง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 12 of 32

บรษิ ทั ไทยซัมมิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 4: PART PRODUCTION CONFIRMATION FORM (F-MKT-016-0)

บรษิ ัท ไทยซัมมทิ โกลด์ เพรส จาํ กัด

THAI SUMMIT GOLD PRESS CO., LTD

สาํ นักงานใหญ่ : ท่อี ยู่ 4/3 หมู่ 1 ถนนบางนา-ตราด กม.16 ต.บางโฉลง อ.บางพลี จ.สมทุ รปราการ 10540 โทร.02-325-8000 แฟกซ์ 02-325-8099

สาขา 1 : ท่อี ยู่ 24 หมู่ 7 ถนนรงั สติ -นครนายก ต.คลองใหญ่ อ.องครักษ์ จ.นครนายก 26120 โทร.037-307-999 แฟกซ์ 037-307-901-3

Doc number is a parts manufacturer.

Subject confirm to ( company name)
Attention

Details

Item Part No. Part Name Model Unit Price

Approved by Please be informed to consider and approve the preparation
(Company Best regards
Name:
Position: Ltd)
()
Approval date:
F-MKT-016-0
Copy :
:

Note :

WIS-Q-082-009

ชื่อเร่ือง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 13 of 32

บรษิ ัท ไทยซมั มิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 5: CUSTOMER REQUIREMENT DATA (CRD) FORM (Ref. WIS-Q-083-005 / F-DDS-004-0)

บริษทั ไทยซมั มิท โกลด์ เพรส จาํ กดั เลขท�ี (No.)
THAI SUMMIT GOLD PRESS CO.,LTD. วันที� (Date)
Customer Requirement Data (CRD.)
รุ่น(Model)
เรียน (Attn.)
ขอใหด้ าํ เนนิ การคาํ นวณ ราคาใหก้ บั ลูกค้า ตามรายละเอยี ดดังต่อไปน�ี DWG No.
1 รายละเอยี ด(Information)

ลกู ค้า(Customer)

Item Part No. Part Name. FORECAST (3Yrs)

วตั ถดุ ิบ(Material) / / ความหนา(Thickness) mm.
นํ�าหนกั ช�นิ งาน / / kg. ประมาณการสง�ั ซือ� ของลกู ค้า ช�ิน/ ปี
กาํ หนดเสนอราคา
ประมาณการส่งตัวอยา่ ง ระยะเวลาการสัง� ซอื� ปี
ประมาณการเรมิ� สงั� ซ�อื รวมประมาณการสั�งซื�อ ชิ�น
ชิน� / เดือน
3 สงิ� ทต�ี ้องการ
2 สิง� ที�แนบมาด้วย ฉบบั Process Standard
แบบของชิ�นงาน(Drawing)
หมายเลขแบบ(Drawing No.) ราคาแม่พิมพ์
ราคา Jig & Fixture
ช�นิ งานตัวอย่าง ราคาคา่ Modify แมพ่ มิ พ์
CAD No. ราคาคา่ เครื�องมือทดสอบ
Master Plan อนื� ๆ ระบุ
Special Requirement ชน�ิ
อ�นื ๆ ระบุ
รายละเอยี ดการผลิตช�ินสว่ น ชบุ โครเมียม ทอง อื�นๆ ผู้อนมุ ัติ
ดาํ ขาว อ�ืนๆ (ผู้จัดการฝ่าย)
พน่ นาํ� มนั ดาํ
ชบุ ซิง� ค์ ผ้ตู รวจสอบ F-DDS-004-0
พ่นสี No.
อ�ืนๆ ระบุ (ผจู้ ดั การสว่ น) Date

ผูจ้ ดั ทาํ ผูร้ ับ
Date
(เจ้าหน้าท/�ี วศิ วกร)
4 Cost Calculation Sheet

ผู้ส่ง

Date

WIS-Q-083-007

ช่ือเรื่อง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 14 of 32

บรษิ ทั ไทยซมั มิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 6: PROCESS PLANNING STANDARD FORM (Ref. WIS-Q-083-005 / F-DDS-003-0)

บรษิ ทั ไทยซัมมทิ โกลด์ เพรส จํากัด PROCESS PLANNING STANDARD Page 1
THAI SUMMIT GOLD PRESS CO., LTD.
LEADER PROJECT : Ref.No : 1
ILLUSTRATION (SKETCH)
NO PROCESS NAME SKETCH PROCESS No. MAN STROKE SYNC COATING REMARK DIE SIZE
DIE Q'TY Q'TY PROCESS WL H

DIE WEIGHT (Kgs.)

NOTE:

REMARKS PCS/MONTH YEAR
1) ORDER ESTIMATE CL
2) DATA TYPE
TSGP1 CL
SEE DWG
SEE CAD TSGP3 SKETCH ISSUED BY CHECKED BY APPROVED BY APPROVED BY
OTHER
3) PRODUCTION PLANT MATERIAL PLANNING

CL. ISSUED PART WEIGHT 0.332 kg. MATERIAL Q'TY/UNIT PART NAME
1STRIPS pcs.
WIS-Q-083-005 PITCH mm CUSTOMER MODEL \

REVISION RECORD MAT'L SIZE W mm
L mm
MAT'L WEIGHT F-DDS-003-0
YIELD RATIO 0.0 kg.
##### %

MARKETING ENGINEERING DEPARTMENT

ชื่อเรื่อง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 15 of 32

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 7: PROCESS DIE COSTING (ROUGH) FORM (Ref. WIS-Q-083-004 / F-DDS-001-0)

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จาํ กดั PROCESS DIE COSTING (ROUGH) 1
THAI SUMMIT GOLD PRESS CO., LTD. 1

CUSTOMER: MODEL : REF. N 0 . Pcs./ M.
PART NAME : PART NO.: ORDER ESTIMATE :

PART NAME REMARKS MATERIAL PLANNING

PART NO. MATERIAL Q'TY / UNIT REMARKS
PROCESS NAME
DIE SIZE COST
MACHINE DIE WEIGHT (Kgs.) (B.)
SKETCH

JIG PROCESS JIG SIZE/ JIG WEIGHT STD. PART (B.) COST (B.) 1 SHEET = STRIPS
CHECK FIXTURE DIE SIZE REMARKS COST 1 STRIP = Pcs.
MODEL CHECKER (B.) TOTAL = Pcs.
DIE WEIGHT (Kgs.)
PART NAME MATERIAL PLANNING
PART NO.
PROCESS NAME MATERIAL Q'TY / UNIT REMARKS

MACHINE SKETCH

JIG PROCESS JIG SIZE/ JIG WEIGHT STD. PART (B.) COST (B.) 1 SHEET = STRIPS
CHECK FIXTURE DIE SIZE REMARKS COST 1 STRIP = Pcs.
MODEL CHECKER (B.) TOTAL = Pcs.
DIE WEIGHT (Kgs.)
PART NAME MATERIAL PLANNING
PART NO.
PROCESS NAME MATERIAL Q'TY / UNIT REMARKS

MACHINE SKETCH

JIG PROCESS JIG SIZE/ JIG WEIGHT STD. PART (B.) COST (B.) 1 SHEET = STRIPS
CHECK FIXTURE 1 STRIP = Pcs.
MODEL CHECKER TOTAL = Pcs.
MARKETING ENGINEERING CHECKED BY
WIS-Q-083-004 ISSUED BY CHECKED BY APPROVED BY

F-DDS-001-0

ช่อื เร่ือง: ขน้ั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 16 of 32

บริษทั ไทยซมั มทิ โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 8: PROCESS JIG COSTING (ROUGH) FORM (Ref. WIS-Q-083-004 / F-DDS-002-0)

บริษัท ไทยซัมมิท โกลด์เพรส จํากดั PROCESS JIG COSTING (ROUGH) 11
THAI SUMMIT GOLD PRESS CO.,LTD.
Pcs./ M.
CUSTOMER: MODEL : Ref. N 0 . : REMARKS
PART NAME : PART NO.: ORDER ESTIMATE :

NO. PROCESS NAME MACHINE OPERATION DESCRIPTION MAN CYCLE TIME WELDING LENGTH(cm.) COST.(B.)

SPOT POINT

WIS-Q-083-004 ISSUED BY CHECKED BY CHECKED BY APPROVED BY
F-DDS-002-0

ชอื่ เร่ือง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 17 of 32

บริษทั ไทยซัมมิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 9: BUDGET TOOLING FORM (F-MKT-014-0)

THAI SUMMIT GOLD PRESS CO., LTD Budget Tooling for Factory

Customer Checked by : Date : (In the case that
Model marketing requires
Department
Cost Center No. Approved : Date…./…./….. maker to be identified.)

Prepared notif ication Part No. Part name Budget from Marketing Price actual ordered MARKER
No. according to invoice
Tooling Nam e M/C Unit Price
Number

T OT AL

WIS-Q-082-009 F-MKT-014-0

ช่อื เร่ือง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 18 of 32

บริษทั ไทยซัมมทิ โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 10: NEW PART PRODUCTION ORDER FORM (Ref. WIS-Q-082-010 / F-MKT-005-1)

THAI SUMMIT GROUP

Marketing 1 Dept.

ใบสั�งทําช�นิ สว่ นเลขท�ี วันที� Part production Order
Date
Our ref. No. SPG: Motorcycle,A gricult
ure & A ppliance
เรยี น
Attention Factory General Manager

บริษทั ฯตกลงรบั เป็นผ้จู ดั ทาํ ชิน� สว่ นให้กบั

We arrange to make the component parts for

ซงึ� เปน็ ผลติ ภัณฑ์ภายใต้ลูกค้าย�หี ้อ ตามรายละเอยี ดดงั ตอ่ ไปนี�
as the following details.
The products under customers' brands.
ชื�อช�นิ ส่วน
① รายละเอียด (Information) Part Name.
หมายเลขช�ินสว่ น จาํ นวนใช้ตอ่ คัน
Part No. Q'ty per unit
หมายเลขช�นิ สว่ น SAP. รนุ่
Material SAP. No. Model
ชอ่ งทางการจดั จาํ หนา่ ย กําหนดการส่งตัวอยา่ ง
Distribution Channel Date of delivery sample

ประมาณการขายลูกคา้ ช�นิ ปี กาํ หนดการส่งของ
Sale target estimate Pcs./ Year
ประมาณการสงั� ซ�อื ของลูกคา้ ชน�ิ ต่อเดอื น Date of delivery
Order estimate Pcs./Month
ประมาณการผลิต ชน�ิ ต่อปี กาํ หนดการประกอบของลูกค้า
Estimate Pcs./Year
Date of customer production

ระยะเวลาในการจัดสง่ ชิ�นส่วนอะไหล่ (ไมร่ วม Model Life) ปี

(Supply Period Not included Model Life) Year

② Enclosure Issue Draw ing No.
Draw ing w orkpiece

Sample w orkpiece Pcs.

Plast ic part s NEW MODEL

Coat ing det ails SPARE PART
Modify No.
พน่ นา�ํ มนั กันสนิม
Part Name.
Chrome plat ed ขาว ดํา Part No.
ดํา ทอง
Zinc plat ed ขาว ใบแจ้งจดั ทาํ เลขท�ี
from customer Dat e
พ่นสี

ล้างไขมัน Ot he r

Not e

1) เปน็ ชนิ� ส่วนใหมข่ องรุน่

2) T he plan for the delivery of the parts is as follows:

EVENT ORDER PART DELIVERY DATE Q'TY

Packing t erms

T he mold maker guarant ees t he mold producing part s - Mont h

(In t he case t hat t he mold det eriorat es before t he w arrant y period, t he mold maker w ill agree t o repair t he mold in it s original condit ion w it ho

③ บริษัท/ฝ่ายทรี� ับดาํ เนนิ การผลิตชิ�นส่ว⑤MOLD , JIG cost ⑥ Ow nership of MOLD, JIG ⑧ Product Hierarchy
Level 1
In-house T SG Pay for MOLD , JIG by T SGP TSGP - [1400] : Thai

Summit Gold Press

Product MODIFY MOLD, JIG cost Cust o Level 2
M odify cost is included in the w orkpiece. O ther Level 3
Oth Level 4
Ext ernal Cust omere pays modify fee

Compan Ot her: No MOLD, JIG cost ⑦ Mold payment
Cust omer supply MOLD , JIG ลูกค้าชําระแม่พิมพใ์ ห้
ซอื� มา - ขายไป T SA. (LUMPSUM) ⑨ Product Type
④ T erms of sale

T he selling price of the w orkpiece does not include the M O LD , JIG fee. คดิ รวมในราคาชิน� งาน
T he selling price of the w ork piece includes the M O LD , JIG fee (AMORT IZAT ION)

Please be informed and t ook act ion.

Checked by Approved by

Reported and checked by

Staff / Marketing Engineer Maketing manager General Manager maketing
Copy
Production Other : ………………………………
TS. GROUP Other : ………………………………
Other : ……………………………… Other : ……………………………

. . . . …/……. …/…. . … . . . . …/……. …/…. . … . . . . …/……. …/…. . … …. . …/…. . …/…. . … . . ……/…. . …/…. . …
Sales Other : ………..
BEX. GROUP ฝา่ ยขาย MERD 1 TBU. GROUP
:…………
Purchasing Accounting Audit Other : ..…….

……/……/…… ……/……/…… ……/……/…… ……/……/…… ……/……/…… ……/……/…… …..…/…..…/…..……..…/…..…/…..… ……/……/…… . . ……/…. . …/…. . …
WIS-Q-082-010 F-MKT-005-1

ชื่อเรื่อง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 19 of 32

บริษทั ไทยซมั มทิ โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 11: SUB-PART LIST FORM (Ref. WIS-Q-082-010 / F-MKT-006-0)

THAI SUMMIT GOLD PRESS CO., LTD SUB-PART LIST FORM PAGE NO.
REMARK
ITEM PART NO. PART NAME DWG. NO. QTY / OLD MODIFY NEW TSA. CUSTOMER
SET PART PART PART MAKE PURCHASE SUPPLY

THAI SUMMIT GOLD PRESS CO., LTD P/NAME : P/NO :
MODEL :
REF.TS.NO. : DATE : CUSTOMER :
MARKETING DEPT. REF.TS.INC. : DATE :

REPORTED & CHECK BY CHECKED BY APPROVED BY REVISE

............................... ......................................... ..................................
OFFICER / ENGINEER
SECTION MANAGER DEPARTMENT MANAGER NO. CHECK BY DATE
WIS-Q-082-010
F-MKT-006-0

ช่อื เรื่อง: ขน้ั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 20 of 32

บริษทั ไทยซมั มทิ โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 12: MASTER TIMING PLAN (F-MKT-015-0)

THAI SUMMIT GOLD PRESS CO., LTD PART NO.
PART NAME
Marketing 1 Dept. MODEL

ITEM DESCRIPTION 2019 2020
APR
JUL AUG SEP OCT NOV DEC JAN FEB MAR MAY JUN JUL

REMARK F-MKT-015-0

WIS-Q-082-007

ชอ่ื เร่ือง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 21 of 32

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 13: REQUEST SAMPLE PART FORM (F-MKT-017-0)

THAI SUMMIT GOLD PRESS CO., LTD MARKETING DEPT.

REQUEST SAMPLE PART FORM NO. MKT

Attention Manager Date
Production 1
Production 2 Production 4
Production 3
Production 5

Other

Because the marketing department reguire to request samples for the company MODEL

To send the sample approve INSPECTION DATA

For testing welding (customer) Other

For trial assembly (customer)

ITEM NOTIFICATION NUMBER PART NO. PART NAME quantityRequired date

Note

Therefore, the marketing department would like to ask for cooperation from your department.

Please be informed and considered Acknowledge and operate
Marketing by production : …………

Reported by Checked by Approved by

.................................................. ....................................... ............................................ ..................................................
Manager/ General Manager
Staff/ Marketing Engineer Assistant Manager / Manager Marketing General Manager
F-MKT-017-0
WIS-Q-082-009

ชอื่ เรื่อง: ขน้ั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 22 of 32

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 14: SAMPLES FOR INSPECTION FORM (F-MKT-018-0)

THAI SUMMIT GOLD PRESS CO., LTD

Headquarters: 4/3 Moo 1 Bangna- SAMPLES FOR INSPECTION Branch 1: 24 Moo 7, Rangsit-Nakhon
Trad Road Km. 16, Bang Chalong Nayok Road, Khlong Yai Subdistrict,
Subdistrict, Bang Phli District, Samut Ongkharak District, Nakhon Nayok
Prakan 10540 Tel. 02-325-8000 Fax 26120 Tel. 037-307-999
02-325-8099 Fax 037-307-901-3

Send To. Date.

Address Our Ref.

ITEM PART NO. PART NAME DWG. REV. No. MODEL QUANTITY OBJECTIVE REMARK
ลําดับ หมายเลขชิน� ส่วน ช�อื ช�นิ ส่วน เลขทีแ� บบร่าง รุ่น จํานวน วตั ถุประสงค์ หมายเหตุ

-

Expense item ไม่มคี ่าใชจ้ า่ ยเพราะ : ....................................

ชําระค่าใชจ้ ่ายโดยลูกคา้ :......................................... 6 SALT SPRAY TEST RESULT ** More details
7 INSPECTION OF PLATING SURFACE .................… -Delivery date .........................
SAMPLE FOR INSPECTION OBJECT 8 PROTOTYPE - Exporter............................
1 TRIAL 1 9 FOOTRHAEPRPSR…O…V…ED……Fo…r c…us.t.o..m...e..r. trial assembly(PP 2) - Car registration ...........................
2 TRIAL 2 10 - Document returned send to ................……
3 PRE PRODUCTION …………………
4 LIMIT SAMPLE Department......................... Tel...............
5 MODIFY DIMENSION

THAI SUMMIT GOLD PRESS CO.,LTD. CUSTOMER

MARKETING DEPT. INTERNAL AUDIT & ANALYSIS DEPT. RECEIVED BY CHECKED BY APPROVED BY

SEND BY APPROVED BY CHECKED BY

CUSTOMER COORDINATOR Marketing Manager CIC

APPROVED able to produce MASS PRODUCTION.

MR. SONGKIAT C. MR.NATAKORN C. DISAPPROVED to send a new sample by date .............

WIS-Q-082-009 F-MKT-018-0

Original: Marketing - - -> Copy 1: Customer - - -> Copy 2: CIC - - -> Copy 3: Account - - -> Copy 4: Security Guard

ชื่อเร่ือง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 23 of 32

บริษัท ไทยซัมมิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 15: NEW SUPPLIER AUDIT CHECK FORM (Ref. WIS-Q-084-007 / F-PUR-032-0)

บรษิ ัท ไทยซัมมทิ โกล์ ดเพรส จํากดั

THAI SUMMIT GOLDPRESS CO.,LTD.
แบบฟอร์มการตรวจประเมนิ ผู้ส่งมอบรายใหม่ (New Supplier Audit Check

No. Audit Topic Company System Re s ult Details and Remark
OK OBS CAR
Criteria Document Support

Supplier must have operation quality management system 3
" ISO 9001, TS16949". If you don't have ISO/TS16949
.Supplier must have plan for request by urgent.
1 ผู้สง่ มอบต้องมรี ะบบบริหารงานคณุ ภาพ ISO 9001 เปน็ อยา่ ง
น้อยและในกรณที ีไ� มม่ ี ISO/TS 16949 ผสู้ ง่ มอบตอ้ งจัดทําแผน

ในการขอระบบโดยเรง่ ด่วน

Does supplier have company's registration data 3
3
บริษทั มกี ารจดทะเบียนถูกตอ้ งตามกฏหมายแพง่ และพานชิ ย์
2

สาํ เนาแบบขอจดทะเบยี นภาษีมลู ค่าเพม�ิ ภพ.01
สาํ เนาแบบขอแจง้ เปลย�ี นแปลงการจดทะเบียนภาษี ภพ.09 (ถา้
สําเนาแบบภาษีเงนิ ไดน้ ติ บิ ุคคล ภพ.20

How about your company cash flow statement and supplier
must show it for check economic security of you company
3 ผู้สง่ มอบสามารถสนับสนุนเอกสารงบกระแสเงนิ สดไดห้ รอื ไมใ่ น
กรณที �ลี กู ค้าร้องขอ เพอ�ื ตรวจสอบ

How about Income Statement of your company trend 2 year 3
and supplier must show it .
4 ผสู้ ง่ มอบสามารถสนบั สนุนเอกสาร งบกําไรขาดทุน ได้หรือไม่

ในกรณที �ีลกู ค้ารอ้ งขอ เพือ� ตรวจสอบ

How about your company Balance Sheet and supplier must 3
Show it for check economic security of you company
5 ผสู้ ่งมอบสามารถสนบั สนุนเอกสาร งบดลุ ไดห้ รือไม่ในกรณที �ี

ลกู คา้ รอ้ งขอ เพือ� ตรวจสอบ

How about your Company Policy , Vision , Mission 3
s ta tements
6 บรษิ ัทมีนโยบายท�ชี ดั เจน และสอดคลอ้ งกับความตอ้ งการของ

ลกู ค้าหรือไม่

Does supplier have manpower enough for support your 3
company and customer which show in organization chart in
7 each section

ผู้สง่ มอบมีจาํ นวนพนักงานเพียงพอตอ่ การสนบั สนนุ บรษิ ัทและ

ลกู ค้าหรอื ไม่ และต้องมกี ารจดั ทาํ โครงสร้างพนกั งานที�

ชัดเจนในแต่ละแผนก

The company has complied with labor law's both local and 2
foreign employees must be register from department of labor 2
8 บรษิ ทั มกี ารปฏิบตั ิตามกฏหมายแรงงาน ท�งั พนักงานไทย และ
ตา่ งประเทศ สําหรบั พนักงานตา่ งประเทศ จะตอ้ งมีการจด
ทะเบียนแรงงานที�ชัดเจน มเี อกสารรบั รองการจดทะเบียนจาก
กระทรวงแรงงาน

Do you have considers on your operation which consistent
with customer requirement
9 ผูบ้ ริหารมกี ารทบทวนกระบวนการทาํ งานเพ�อื ให้เป็นไปตามความ
ต้องการของลกู ค้าหรอื ไม่

Do you have a training course provide to manpower and how 1
to monitoring manpower skill after they take course.
11 ผสู้ ง่ มอบมีการอบรมเพื�อเพิ�มทักษะในการทาํ งานหรือไม่ และ F-PUR-032-0
สามารถวัดผลได้

WIS-Q-084-007

ช่อื เร่ือง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 24 of 32

บรษิ ทั ไทยซมั มทิ โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 16: CONCLUSION OF SUPPLIER AUDIT FORM (Ref. WIS-Q-084-008 / F-PUR-028-0)

TบHรAิษI ทัSUไMทMยซITัมGมOิทLDโกPลRดE์ เSพSรCสOจ.,าํ LกTดั D.

4/3, 4/29 หม่ 1 ถนน บางนา – ตราด กม.16 ต.บางโฉลง อ.บางพลี จ.สมทุ รปราการ 10540
4/3, 4/29 Moo 1 Bangna-Trad.HWY. Kms 16. Bangchalong. Bangplee District. Samuthprakarn. 10540 Thailand

CONCLUSION OF SUPPLIER AUDIT

Audit Date :

1 Supplier Data Base

Supplier's Name : Supplier Code :

Address :

Tel/Fax : E-mail :
Capital
Established : Business time Baht

Support for plant : TSGP Plant 1 TSGP Plant 2 TSGP Plant 3 Other …………. Supplier's System : ISO 9001 ISO/TS16949 ISO 14001
NO system Other

Part Type : PURCHASE PART RAW MATERIAL SUBCONTRACT Other ………………...

Aduit Period : 1st 2nd 3rd 4th

2 Audit Result

No Topic Total OK OBS CAR Score Percentage Perform ance Auditor Auditee

1 Engineering and System 80%
2 Production 80%
3 Measurement & Equipment 80%
4 QC&QA 80%
5 Production Planning & Delivery 80%
6 Finance & Activity 80%

Remark : Percentage for passed is 80% up.

3 Conclusion & Result

Count Score Total Score Percentage ( pass 80%up ) Grade

OK
OBS
CAR

Engineering and Ranking point
System
90-100 A

Finance & Activity Production 80-89 B
70-79 C

60-69 D

0-59 F

Production Planning Measurement & Audit result
& Delivery Equipment Passed ( Score 80% up)
Not pass
QC&QA Must be Improved ( Consider by manager level )
Next Period :

ACKNOWLEDGED/AGREED ISSUED BY APPROVED BY ACKNOWLEDGE BY ACKNOWLEDGE BY

Factory Manager /Supplier SQA Engineer / TSGP SQA Manager / TSGP Purchase Part Manager/TSGP General Manager / TSGP

WIS-Q-084-008 F-PUR-028-0

ช่อื เร่ือง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 25 of 32

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 17: RUN @ RATE RESULTS RECORD FORM (1/2)

ช่อื เร่ือง: ขน้ั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 26 of 32

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 18: RUN @ RATE RESULTS RECORD FORM (2/2)

ช่อื เร่ือง: ขน้ั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 27 of 32

ช่อื เร่ือง: ข้นั ตอนชิ้นสว่ นงานใหม ่(สว่ นการตลาด TSGP) บริษทั ไทยซมั มทิ โกลด์ เพรส จาํ กดั MASTER SCHEDULE OF NEW PRODUCT CUSTOMER NAME : FIGURE 19: MASTER SCHEDULE OF NEW PRODUCT FORM (Ref. WIS-Q-082-009 / F-PJS-015-0) บริษทั ไทยซัมมทิ โกลด์เพรส จํากัด
TITLE: NEW MODEL (MARKETING TSGP) THAI SUMMIT GOLD PRESS CO.,LTD
PRODUCT NO./ NAME : - THAI SUMMIT GOLD PRESS CO., LTD.
PART NAME
MODEL :
EFFDEACTTEIVE
NO. ACTIVITIES YEAR SCHEDULE PLANNING ( = PLANNING) 2013 ITEM PART NO. ใบส�งั ทํา
MONTH 2012 OCT NOV JAN FEB MAR APR ช�นิ สว่ น
APR MAY JUN DEC เลขท�ี
RESP. BY DAY JUL AUG SEP บัญชี TSGP.
ISSUED BY
1 CUSTOMER FIRST SAMPLE (MKT)
2 CUSTOMER TRIAL - RUN F-PJS-015-0
3 CUSTOMER PRE - PRODUCTION (MKT)
4 CUSTOMER PRODUCTION
(MKT)

(MKT)

5 เอกสารประกอบการ GO Project (MKT)
(PUR)
6 งานจัดซือ� /จัดจ้าง (RQ/PR/PO) (PJS)
(MAKER)
7 พจิ ารณาปัญหาKAKOTORA (QAS)
(PLS)
8 DIE/JIG CONCEPT , DESIGN & FABRICATION (PUR)
(QAS)
9 INSP. JIG/TOOL CONCEPT , DESIGN & FABRICATION (PLS)
(PUR)
RAW MAT. PREPARE MAT'L (PJS)
10 FOR SAMPLE PARTS PARTS (PJS)
PART INSP. & CONFIRM (QAS)
(GM)
RAW MAT. PREPARE MAT'L (MKT)
11 PARTS (QAS)
(PJS)
FOR PRODUCTION (PCS/PJS)
(PCS/PJS)
12 เอกสาร CP/CPK , CHECK ALL POINT , MILL SHEET (PCS/PJS)
(PUR)
13 SAMPLE PREPARATION (VENDER)

14 SAMPLE APPROVE / MACRO TEST

15 Q - EVALUATION BY TOP

16 SAMPLE DELIVERY TO CUSTOMER

17 CUSTOMER INSP. RESULT

18 FINAL TRIAL ( OFF TOOL ) WORK INSTRUCTION

กํ าหนดจํ านวน DOCUMENT CONTROL CENTER

19 PACKING ออกแบบ/ตวั อย่าง
STANDARD ลกู คา้ APPR.
จัดซอื� /จัดจ้าง

สร้าง/ส่ งมอบ

20 BOM (PJS)
(PJS)
21 QCF /QCP / FLOW PROCESS CHART (PJS)
(PJS)
22 OPS (PJS)
(PJS)
Doc. No.: WIS-Q-082-007 23 เอกสาร IIRS DOCUMENT (PJS)
REV.: 2 INSP. STD. CUSTOMER APPR. (PROD/QAS/PJS)
Page: 28 of 32 (PJS/QAS)
24 & (PJS)
TEST STD. (PROD)
ผลความก้าวหน้า
25 INSP. DATA ชอื� ผตู้ ดิ ตาม

26 MAN / MC & EQUIPMENT PREPARATION จดั ซอ�ื TSGP. ( DIE )

27 ON THE JOB TRAINING

28 PRE - PRODUCTION

29 MASS - PRODUCTION

FOLLOW UP (อยา่ งน้อยทุก 2 สป.)
 = ได้ตามแผน ,  = ไม่ได้ตามแผน

REVIEWED & APPROVED BY (ระดบั จดั การ หรือผ้ทู ไ�ี ดร้ บั มอบหมาย) การตลาด TSGP. 3 REV. DETAIL OF CHANGE
การตลาด วิศวกรรม TSGP. ประกั นคุ ณภาพ จดั ซื�อ TSGP. ( PUR ) จดั ซอื� TSGP. ( MAT ' L ) คลังพัสดุ & วตั ถุ ดบิ วางแผนฯ ป� มั ชน�ิ สว่ น เชอ�ื มประกอบ วิศวกรรม TSGP. 3
0 NEW ISSUED
WIS-Q-082-009

บรษิ ทั ไทยซัมมิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

REVISION HISTORY

DCN # REV. Effective date Issue by/ Review by Revising by / Approve by

16-Q-212 0 AUG 01, 2016 Mr. Natakorn / REF. DCN New version (Ms. Sumitra, Mr. Charin)

19-Q-129 1 AUG 09, 2019 Ms. Kunlapha / REF.DCN Re-confirm to use this document for 3 years
(Ms. Sumitra, Mr. Charin)

20-Q-032 2 SEP 10, 2020 Ms. Kunlapha / REF.DCN Adjust the scope of MKT.
Revise form F-MKT-013-0, 015-0

(Ms. Sumitra, Mr. Charin)

ช่อื เรื่อง: ข้นั ตอนชิน้ สว่ นงานใหม ่(สว่ นการตลาด TSGP) Doc. No.: WIS-Q-082-007
TITLE: NEW MODEL (MARKETING TSGP) REV.: 2
Page: 29 of 32

บริษทั ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

DISTRIBUTION TO

TSGP1 MKT PUR PJS QAS SLS PLS PCS PRS1 PRS2 WDS1 WDS2 PTS QSM TSGP3

1 PURPOSE
1.1 This document is prepared to define the duties and responsibilities of the departments involved

in the amendment or cancellation parts and tools as the customer needs after being informed to
Thai Summit Gold Press Co., Ltd.

2 SCOPE
2.1 This document requires the marketing staff and the relevant department takes action after the
customer has agreed or received a request to the company. Please make changes or cancel as
follows.
2.1.1 Tools such as mold, inspection jig, welding jig, etc.
2.1.2 Parts such as parts in production process, external parts, new parts, etc.
2.1.3 Raw materials such as sheet metal, pipes, etc.
2.1.4 Containers such as rack, iron basket, box etc.
2.1.5 Others such as production processes, tools, etc.
2.1.6 Use only for cancellation or change parts and equipment of customers.

2.2 This document covers to Re-Quotation in the case of an amendment requested by the
customers are different from the original method of the company work. The management level
of the marketing department will make a new quotation for the customer to consider.

3 PROCEDURES
3.1 Parts and tooling amendment procedure: This document requires the relevant department to

take action in accordance with the customers requesting a change in the details of a part or tool,
the customer will inform the marketing department of their requirements with details as

follows.

ช่ือเรื่อง: ข้นั ตอนการเปลย่ี นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010

TITLE: PART & TOOLING AMENDMENT AND CANCELLATION REV.: 2
Page: 2 of 19

บริษทั ไทยซมั มทิ โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.1.1 Customers will notify the details to “Marketing Manager” with details of general
changes as required by the customer as follows.
3.1.1.1 Material
3.1.1.2 Dimension
3.1.1.3 Plating such as zinc plating, chrome, painting
3.1.1.4 Assembly process
A. Adding/ decrease parts
B. Adding/ decrease welding
3.1.1.5 Testing
3.1.1.6 Packing
3.1.1.7 Others related

NOTE: When the customer has informed the need to the marketing manager to
implement changes in part details, the customer will be issued the documents as
following.

3.1.1.8 Drawing

3.1.1.9 Engineering order

3.1.1.10Others related such as the meeting documents, etc.

3.1.2 When the customer has already informed of the change to the marketing
department, managers / relevant staffs will contact the relevant staff (customers) to
study the details of the change. It may or may not be necessary to have a meeting
with customers, which consists of marketing staff and project engineer staff or
related departments as needed to receive the customer goal’s plan. After receiving
details from customers, the relevant marketing staff will prepare to issue
documents to inform related persons as follows:

ช่ือเร่ือง: ขน้ั ตอนการเปลี่ยนแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 3 of 19

บรษิ ทั ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

NOTE : 1. Marketing staff will review the customer changes (Customer
Engineering Standard/ Specification Change) with relevant cross-departmental
teams and provide responses to customers within 5 work days and proof of
response from the customer to marketing staff stored as evidence or quality
records.

2. Marketing staff will copy the customer changes (Customer
Engineering Standard/ Specification Change) to relevant departments such as
project engineer, quality assurance, purchasing department, etc. to take action to
meet the deadline specified with the customers.

3.1.2.1 Parts/ tooling modify means parts and / or tooling that have been
successfully inspected by the customers and it is in the mass production
process and issue one or all documents.

A. New Part Production Order Form (F-MKT-005) (Figure 3) in
case of replacement of part no.

B. Sub-Part List Form (F-MKT-006) (Figure 4) in case of adding
parts.

C. Master plan of project engineer

D. New Drawing

E. Stock Confirmation Form must inform the department as follows.
• Planning and raw material control: Performs inspection of
parts in each production process and checks the number of
raw materials, stock parts in plant, as well as pre-call plans.
• Purchasing department: To check the purchase of raw
materials, exterior parts and vendors/ suppliers.

ชอ่ื เร่ือง: ขน้ั ตอนการเปลยี่ นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 4 of 19

บริษัท ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

• Warehouse: To check the number of Finished Goods (FG) in
the warehouse.

• Sales: To inspect the back order items from customers.
F. Engineering Order form from customers or the minutes of

meeting with customers.

3.1.2.2 Revise parts / tooling revised means parts and/ or tooling that are during
the development or the mass production, but there have been many
revises, which are different from the previous information.
A. Engineering Change Notice (ECN)
B. New Drawing

3.1.3 After the marketing staff already coordinated with the project engineer staff and
the quality assurance department related to the change of parts details or the tool,
marketing staff will be held the meeting with relevant departments as follows:

• Marketing department
• Project engineer section
• Process engineer section
• Relevant production department
• Quality assurance section
• Planning and raw material control department
• Purchasing department
• Sales department
The meeting will consider together with the relevant departments and summary of
documents and plans for revision by setting a period of completion to inform the
customer.

ช่อื เรื่อง: ข้นั ตอนการเปลี่ยนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 5 of 19

บรษิ ทั ไทยซมั มิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.1.4 The relevant departments have to notify the costs involved as a result of any
changes of this customer to the marketing staff as follows.

• Purchasing department: Parts, raw materials, stock at the vendors/ suppliers,
pre-ordering of materials / parts

• Project engineer section: Process equipment, special machine
• Planning section : Parts in the production process
• Other departments : Storage areas, rack center, wages, workers

• Process engineer section: Modify fee of tooling and jig

3.1.5 After the joint meeting of the departments involved and the corrective action along
with the assignment of the duties with the departments and relevant sections to
proceed as follows.
3.1.5.1 The project engineer section will proceed and coordinate with the process
engineer in making arrangements or modify machine and tool such as
mold, welding jig, inspection jig, etc. and proceeding to edit documents as
follows.
• STANDARD OPERATION PROCEDURE (S.O.P.) (refer to WI
operating regulations or FORM of the company)
• QUALITY CONTROL FLOW CHART (refer to WI operating
regulations or FORM of the company)
• FLOW PROCESS CHART (refer to WI operating regulations or
FORM of the company)
• Relevant WORK INSTRUCTION
3.1.5.2 Quality assurance section will proceed to revise the document as follows.

• INSPECTION STANDARD (refer to WI operating regulations or
FORM of the company)

ช่ือเรื่อง: ข้นั ตอนการเปลยี่ นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 6 of 19

บริษทั ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

• INSPECTION DATA (refer to WI operating regulations or FORM of
the company), to allow the QA staff to inspect the modified parts to
be the changing conditions agreed with the customers.

3.1.6 After revised the documents, the project engineer section will prepare the sample
parts and give to the quality assurance to proceed the inspection in order to send
the sample parts with INSPECTION DATA to customers

3.1.7 Project engineer section will send the sample parts that have been verified from
the quality assurance section and sent to the customer for inspection
(QUALIFIED). In the case of not passing inspection, the project engineer section
has to create a new sample part immediately for delivery to the customers. And in
the case that the inspection is completed, customers will issue approved
documents to the company (Marketing Department / Project engineer section).

3.1.8 After the marketing department receives the inspection results from the customer,
they will notify the relevant production department and the project engineer
section will be responsible for delivery the equipment (In case of amendment) to
the production department to produce parts to the customer.

3.1.9 When all relevant departments have acted in accordance with a summary meeting
in order to change parts (PARTS MODIFY) which has been verified by the
customer and deliver equipment for use in the production process (MASS
PRODUCTION), the relevant of the marketing staff will inspect the performance
as follows.
3.1.9.1 Is the operation in line with the plan? Does the operation go as the plan?
3.1.9.2 Are the finished parts / sub-parts / raw materials remaining?
3.1.9.3 Related others

ชอ่ื เร่ือง: ข้นั ตอนการเปลย่ี นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 7 of 19

บรษิ ัท ไทยซมั มิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.2 In case of the new customer wants to cancel the parts / tooling, they will notify to Thai Summit
Gold Press Co., Ltd.
3.2.1 When the customer has notified to cancel any part / tool to marketing manager,
relevant marketing staff will contact the customer about the cancellation details,
the customer will issue "Parts / tooling Cancellation documents" (F-MKT-007)
(Figure 5) or "Cancellation Confirmation Letter of parts / tooling".
3.2.2 When the marketing staff has known the details of the cancellation of parts/
tooling, they will proceed to copy the information to those involved are as follows.

• Purchasing department

• Production department

• Planning and raw material control department

• Process engineer section (cancel tool of new model)

• Others related such as warehouse, sales, etc.
3.2.3 When the relevant marketing staff has completed the "ECN" document, informs all

departments to acknowledge and hurry to issue document to invite the relevant
departments for the meeting and inform them to inspect parts/ tooling and others to
receive a notice of cancellation.
3.2.3.1 Tooling cancellation that it is in the sample process but not yet entered

into the mass production process.

• Related departments
- Marketing department
- Project engineer section
- Process engineer section
- Purchasing department
- Quality Assurance section

• Assign duties for each department.

ชอื่ เร่ือง: ข้นั ตอนการเปล่ยี นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 8 of 19

บรษิ ัท ไทยซัมมิท โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

Marketing department: The relevant marketing staff will proceed as
the following.
A. Marketing staff summarizes the meeting details (minutes

meeting) and copy to relevant persons.
B. Marketing staff contact the customer to inspect the cancelled

tooling (only those made in the company) include;
- Customers (Must sign to accept the cancelled tooling)
- Marketing department
- Project engineer section
- Process engineer section
NOTE: In case of the outsourcing, the purchasing staff will be

agreed with the vendors/ suppliers.

C. To agree with customers about the related conditions of tooling as
follows.
- Destroyed at Thai Summit Gold Press Co., Ltd.
- Return to the customer (Deadline)
- Store it to make spare parts (Period Time) by storing at
Thai Summit Gold Press Company Limited
- Delivery to Thai Summit Gold Press Co., Ltd. (In case of the
tooling is at the project engineer section) within 15 days.

D. Summary of the incurred expenses by receiving information from
various departments, refer "Summary the cost of changing parts /
tooling sheet” (F-MKT-008) (Figure 6).
- Purchasing department
- Project engineer section

ชอ่ื เรื่อง: ข้นั ตอนการเปลย่ี นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 9 of 19

บริษัท ไทยซัมมิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

- Process engineer section
- Other relevant sections

Project engineer section: The relevant staff will perform as the
following actions.

• Amendment/ cancel the related document

• Quality control flow chart

• Standard operation procedure

• Flow process chart

• Parts packing (Refer to the WI operating regulations or FORM of
the company)

• Flow process chart ( Refer to the WI operating regulations or
FORM of the company)

• Parts packing (Refer to the WI operating regulations or FORM of
the company)
A. Check the list of equipment that delivered by the process engineer

section and store it in order to proceed.
B. Inspect the rack of cancellation parts that can be used with other

models or not.
C. Summary of expenses to the marketing department.

R&D and Product Planning section: The relevant staff will perform
as the following actions.
A. Amendment/ cancel the related documents such as

- PROCESS STANDARD
- COMPONENT PART LIST

ช่ือเรื่อง: ขน้ั ตอนการเปล่ียนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 10 of 19

บริษัท ไทยซมั มิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

- COMPLETE PART SHEET
- TOOLING CONTROL SHEET
- ASSEMBLY OPERATION FLOW CHART
B. Summary of the list of tooling cancellation and prepare for
inspection and deliver to Thai Summit Gold Press Co., Ltd.
(Project engineer section) within 15 days.
C. Summary of incurred expenses and send it to the marketing
department.

Quality Assurance section: The relevant staff will perform as the
following actions.
A. Amendment/ cancel the related documents such as

- INSPECTION STANDARD (Refer to the WI operating
regulations or FORM of the company)

- INSPECTION DATA (Refer to the WI operating regulations
or FORM of the company)
B. Summary of incurred expenses to the marketing department.

Purchasing department and Project engineer section: The relevant
staff will perform as the following actions.
A. Summary of the tooling that has been cancelled in the case of

outsourcing.
B. Summary of the list of raw materials that have been ordered in

advance.
C. Summary of the machine items that it is external ordered.
D. Summarize all incurred expenses to the marketing department.

ชอ่ื เร่ือง: ข้นั ตอนการเปลีย่ นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 11 of 19

บริษทั ไทยซัมมทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.2.3.2 Parts cancellation means parts are in the progress (MASS
PRODUCTION) in TSGP, and requires the departments and related
sections are:

A. Marketing department

B. Project engineer section

C. Planning and control department

D. Purchasing department

E. Production department

F. Quality Assurance section

• Determine the duties of each departments as follows:
Marketing department: The relevant staff will perform as the following
actions.
A. Summarize the details in the meeting about the cancellation of parts/

tooling and coordinate with customers and departments in the
company.
B. Make an agreement for cancellation terms such as
- Master plan and timeline
- Quantity in the production before cancellation
- Period time to store the tooling for making spare parts.
C. Sales staff will summarize the correctly number of parts and delivery
goal to the customer, in order to issue documents in the production
order to meet the customer needs.
D. Summary of costs incurred by each department because of
cancellation (except cancellation of old parts which is in the

ชื่อเร่ือง: ข้นั ตอนการเปล่ียนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 12 of 19

บรษิ ัท ไทยซมั มิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

conditions of the agreement between the company and the
customer).

Project engineer section: The relevant staff will perform as the following
actions.

A. Proceed to cancel the relevant documents such as
- QUALITY CONTROL FLOW CHART (Refer to the WI operating
regulations or FORM of the company)
- STANDARD OPERATION PROCEDURE (Refer to the WI operating
regulations or FORM of the company)
-FLOW PROCESS CHART (Refer to the WI operating regulations or
FORM of the company)
B. To inspect the equipment and machinery of the parts that are

canceled as can it be used in other tasks. In case of cancellation parts
used the special machine and cannot be used for other tasks. Please
inform the relevant departments to summary in the meeting.
C. Make a summary of expenses incurred and notify to the marketing
department.

Planning and raw material control section: Relevant staff will perform as
follows.

A. To check the sub-part stock that produced in each process, as well as
control the number and master plan was set in the meeting.

B. Check the work of the workers that can be adapted in other versions
or not.

C. Check raw materials in store

D. Checking plans for calling Parts and raw materials

ชื่อเรื่อง: ขน้ั ตอนการเปลย่ี นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010

TITLE: PART & TOOLING AMENDMENT AND CANCELLATION REV.: 2
Page: 13 of 19

บรษิ ัท ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

E. Summarize the expenses incurred and notify to the marketing
department.

NOTE: From the message C, D, checking the number and call plan
to consider and compare with customer calling plan according to
the meeting was concluded.

Purchasing department: The relevant staff will perform as the following
actions.

A. Check pre-purchase documents such as raw materials, parts and
compare with store's stock balance of parts to know the quantity and
master plan to determine correctly.

B. Check parts and raw materials at the vendors/ suppliers that how
many for further consideration

C. Summary the expenses about cancellation and notify to the marketing
department.

Production department: The relevant staff will proceed as the master plan
between the sales department and the planning department, specify more
information in the meeting in order to achieve the goals/ specified goals.
Quality Assurance Section: The relevant staff will acknowledge to the
cancellation parts and prepare to revise the correct documents related to such
parts.

3.2.4 When having a meeting or completed clarifying in details by the marketing staff
and caused the costs of expenses, the relevant departments must notify the details
to the marketing staff immediately.

ชื่อเรื่อง: ข้นั ตอนการเปลี่ยนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 14 of 19

บริษทั ไทยซมั มิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.2.5 After it has been concluded at the meeting, the related departments will make
arrangements to perform as following:
3.2.5.1 TOOLING: Project engineer staff will contact with relevant persons in the
tooling shop to hasten to suspend the preparation.
3.2.5.2 PARTS: Relevant staff will control the quantity and master plan.

3.2.6 When performing as agreed, the marketing staff will conclude the operation and
record days/ months/ years (Actual) of the cancellation of parts and kept it as
evidence.

ชื่อเรื่อง: ขน้ั ตอนการเปลยี่ นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 15 of 19

บริษัท ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 1: FLOW CHART: PARTS & TOOLING AMENDMENT

PROCEDURES RELATED PERSON RELATED DOCUMENT

3.1 FROM: CUSTOMER -DRAWING (NEW) (CAD DATA) OR/AND
CUSTOMER INFORMS THE CHANGE OF PARTS. TO: MARKETING CHANG NOTICE DOCUMENT (CUSTOMER)

INFORM THE CUSTOMER 3.1. STUDY DETAILS TOGETHER BETWEEN A AG -DRAWING (NEW) (CAD DATA) OR/AND
BACK THAT IT CAN BE DONE TSGP AND CUSTOMER -CUSTOMER CHANG NOTICE DOCUMENT (CUSTOMER)
OR NOT. -MARKETING DEPARTMENT
-ENGINEERING/ PJS SECTION -DRAWING (NEW) (CAD DATA) OR/AND
3.1.2. IN THE CASE THAT CAN PRODUCTION CHANG NOTICE DOCUMENT
PROCEED TOINFORM DOCUMENT TO FROM: MARKETING DEPARTMENT (CUSTOMER)
3.1.2. “PARTS/TOOLING MODIFICATION” PURCHASING DEPARTMENT -PARTS ORDER DOCUMENT
PROCEED TOINFORM DOCUMENT -LIST OF SUB-COMPONENTS
TO “PARTS/TOOLING REVISED” 3.1. NO TO: ENGINEERING/PJS SECTION -MASTER PLAN
FROM: MARKETING
SUMMARUZE SCHEDDULE PLAN DEPAETMENT -DRAWING (NEW) (CAD DATA) OR/AND
AND COPY TO RELEVANT TO: ALL RELEVANT CHANG NOTICE DOCUMENT (CUSTOMER)
DEPARTMENTS -ADDITIONAL INFORMATION DOCUMENT
3.1.4 YES 3.1.5 YES -ENGINEERING/PJS SECTION
PREPARE TOREVISE AND TRAIL -ASSURANCE QUALITY -DRAWING (NEW) (CAD DATA) OR/AND
CALCULATED THE COST ASSOCIATED CHANG NOTICE DOCUMENT (CUSTOMER)
WITH TOOLING, MATERIAL, OTHERS 3.1.6 NO -ENGINEERING/PJS SECTION INSPECTION DATA
-ASSURANCE QUALITY INSPECTION STANDARD
CARRY OUT PARTS INSPECTION QUALITY CONTROL FLOW CHART
FROM: ENGINEERING/ PJS OPERATION PROCEDURE
3.1.7 YES SECTION STANDADR
SEND SAMPLES TO CUSTOMER AND FLOW PROCESS CHART
N CHECK THE PARTS FROM: ENGINEERING/ PJS SECTION INSPECTION STANDARD
TO: PRODUCTION DEPARTMENT INSPECTION DATA
3.1.8 YES
ALL RELEVANT DEPARTMENTS INSPECTION STANDARD
DELIVERY FOR MASS PRODUCTION INSPECTION DATA

3.1.9 QUALITY CONTROL FLOW CHART
MEETING TO SUMMARIZE PROBLEMS IN OPERATION PROCEDURE
OPERATION STANDARD
FLOW PROCESS CHART
PARTS PACKING
INSPECTION STANDARD
INSPECTION DATA

ช่ือเร่ือง: ข้นั ตอนการเปลย่ี นแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 16 of 19

บริษัท ไทยซัมมทิ โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 2: FLOW CHART: PARTS & TOOLING CANCELLATION

PROCEDURES RELATED PERSON RELATED DOCUMENT

3.2 CUSTOMER INFORMS TO FROM: CUSTOMER -DOCUMENT FOR CANCELLATION THE
CANCEL PARTS. TO: MARKETING MODEL FROM THE CUSTOMER
MANAGER
3.2 -DOCUMENT FOR CANCELLATION THE
FROM: MARKETING DEPAETMENT MODEL FROM THE CUSTOMER
PROCEED TOPREPARE DOCUMENTS TO: ALL RELEVANT DEPARTMENTS -ADDITIONAL INFORMATION DOCUMENT
AND CHECK THE

QUANTITY OF PARTS

3.2.3 NO ALL RELEVANT DEPARTMENTS -DOCUMENT FOR CANCELLATION THE
MODEL FROM THE CUSTOMER
MEETING FOR SUMMARY -MARKETING DEPARTMENT -ADDITIONAL INFORMATION
CANCELLATION DETAILS AND COPY TO -ENGINEERING/ PJS SECTION/PCS DOCUMENT
SECTION
RELAVANT PERSON -PURCHASING DEPARTMENT -SUMMARY EXPENSE DOCUMENT
ALL RELEVANT DEPARTMENTS
3.2.3.1
FROM: PURCHASING DEPARTMENT
PROCEED TOCANCEL THE PART THAT IS ENGINEERING/ PJS SECTION/PCS
IN THE PROCESS OF PRODUCING SAMPLE
YES PARTS SECTION
QA SECTION
DETAILS ABOUT 3.2.4 PLANNING AND CONTROL SECTION
CANCELLATION THE PART

THAT IS IN PROCESS

CALCULATED THE COST
ASSOCIATED WITH TOOLING,

3.2.5

PROCEED AS A MEETING ALL RELEVANT DEPARTMENTS

3.2.6

SUMMARIZE AND INFORM THE ALL RELEVANT DEPARTMENTS
RELAVANT PERSON

ชื่อเร่ือง: ข้นั ตอนการเปลย่ี นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 17 of 19

บรษิ ัท ไทยซัมมิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 3: PARTS ORDER (F-MKT-005-1)

THAI SUMMIT GROUP

Marketing 1 Dept.

ใบสง�ั ทําชนิ� สว่ นเลขที� วนั ที� ใบสั�งทําชิน� สว่ น
Date
Our ref. No. SPG: Motorcycle,A gricult
ure & A ppliance
เรยี น
Attention ผู้จัดการทว�ั ไปฝ่ายโรงงาน

บรษิ ัทฯตกลงรบั เป็นผจู้ ดั ทําชน�ิ ส่วนใหก้ ับ

We arrange to make the component parts for

ซึ�งเป็นผลติ ภณั ฑ์ภายใตล้ ูกค้ายหี� อ้ ตามรายละเอยี ดดังตอ่ ไปน�ี
as the following details.
The products under customers' brands.
ช�ือชน�ิ สว่ น
① รายละเอียด (Information) Part Name.
หมายเลขชิ�นสว่ น จาํ นวนใช้ต่อคัน
Part No. Q'ty per unit
หมายเลขช�ินส่วน SAP. รุน่
Material SAP. No. Model
ชอ่ งทางการจดั จาํ หนา่ ย กาํ หนดการส่งตวั อย่าง
Distribution Channel Date of delivery sample

ประมาณการขายลกู คา้ ชิน� ปี กาํ หนดการส่งของ
Sale target estimate Pcs./ Year
ประมาณการส�งั ซอ�ื ของลูกคา้ ชนิ� ต่อเดอื น Date of delivery
Order estimate Pcs./Month
ประมาณการผลิต ชิ�นต่อปี กาํ หนดการประกอบของลูกค้า
Estimate Pcs./Year
Date of customer production

ระยะเวลาในการจดั สง่ ชน�ิ ส่วนอะไหล่ (ไม่รวม Model Life) ปี

(Supply Period Not included Model Life) Year

② ส�ิงท�ีสง่ มาด้วย ฉบับ หมายเลข Draw ing
Draw ing ชนิ� งาน ช�ิน
ตวั อยา่ งชน�ิ งาน เปน็ ชนิ� สว่ นใหม่
ทอง เป็นชิน� ส่วน SPARE PART
ชิ�นส่วนพลาสตกิ จากลกู คา้ เปน็ ช�นิ ส่วน Modify คร�งั ที�

รายละเอียดการเคลอื บผิว Part Name.
Part No.
พ่นนาํ� มนั กนั สนมิ
ใบแจ้งจดั ทาํ เลขที�
ชบุ โครเมียม ขาว ดํา ลงวันที�
ดาํ
ชุบซงิ� ค์ ขาว

พน่ สี

ล้างไขมัน อ�ืน ๆ

หมายเหตุ

1) เป็นช�ินส่วนใหมข่ องรุ่น

2) แผนการจัดสง่ ชิน� สว่ นดงั กลา่ ว ดังน�ี

EVENT ORDER PART DELIVERY DATE Q'TY

PACKING เงื�อนใขการบรรจชุ ิน� งาน

บรษิ ทั ผู้สร้างแม่พมิ พร์ บั ประกนั แมพ่ มิ พผ์ ลิตชิน� งานจาํ นวน - เดอื น

(ในกรณที แ�ี มพ่ มิ พ์เกดิ เส�อื มสภาพก่อนอายุการรับประกนั บริษัทผู้สรา้ งแมพ่ ิมพจ์ ะยินยอมซอ่ มแมพ่ ิมพ์ใหอ้ ยู่ในสภาพเดิมโดยจะไม่คดิ คา่ ใชจ้ า่ ยใดๆท)ัง� สนิ�

③ บรษิ ัท/ฝ่ายท�รี บั ดําเนนิ การผลิตชนิ� ส่ว⑤ค่าใช้จ่ายแม่พิมพ์ , JIG ⑥ กรรมสทิ ธิใ� นแม่พมิ พ, ์ จิ�ก ⑧ Product Hierarchy
Level 1
ภายใน T SG. ชาํ ระคา่ แมพ่ มิ พ์, JIG โดย บT SGP TSGP - [1400] : Thai

Summit Gold Press

ฝ่ายผลติ มีคา่ ใช้จา่ ยในการ MODIFY แมพ่ ิมพ์, JIG ลูกค้า Level 2

อ�นื : คา่ MODIFY คดิ รวมอยู่ในช�ินงาน อืน� ๆ Level 3

ภายนอก ลกู ค้าจา่ ยคา่ MODIFY Level 4

บรษิ ัท : อื�น: ไมม่ คี า่ ใช้จา่ ยแมพ่ ิมพ์, JIG ⑦ การชําระคา่ แม่พิมพ์
ลูกคา้ SUPPLY แม่พิมพ์, JIG ลกู คา้ ชําระแม่พมิ พใ์ ห้
ซอ�ื มา - ขายไป T SA. (LUMPSUM) ⑨ Product Type
④ เงื�อนไขในการขาย

ราคาขายชน�ิ งานไมร่ วมค่าแม่พิมพ,์ JIG คดิ รวมในราคาชิ�นงาน
ราคาขายชิน� งานรวมค่าแม่พิมพ,์ JIG (AMORT IZAT ION)

จึงเรยี นมาเพื�อทราบและโปรดดําเนนิ การ ตรวจสอบโดย อนมุ ตั โิ ดย
รายงานและตรวจสอบโดย

เจา้ หนา้ ที� / วศิ วกรการตลาด ผจู้ ัดการ ฝ่ายการตลาด ผจู้ ดั การท�ัวไป ฝา่ ยการตลาด

สําเนา

TS. GROUP ฝ่ายผลิต
Other : ………………………………
Other : ……………………………… Other : …………………………… Other : ………………………………

. . . . …/……. …/…. . … . . . . …/……. …/…. . … . . . . …/……. …/…. . … …. . …/…. . …/…. . … . . ……/…. . …/…. . …
ฝ่ายขาย Other : ………..
BEX. GROUP ฝา่ ยขาย MERD 1 TBU. GROUP
:…………
ฝ่ายจดั ซ�อื ฝา่ ยบญั ชี ฝา่ ยตรวจสอบ Other : ..…….

……/……/…… ……/……/…… ……/……/…… ……/……/…… ……/……/…… ……/……/…… …..…/…..…/…..……..…/…..…/…..… ……/……/…… . . ……/…. . …/…. . …
WIS-Q-082-010 F-MKT-005-1

ช่ือเรื่อง: ขน้ั ตอนการเปลีย่ นแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 18 of 19

บรษิ ทั ไทยซมั มิท โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 4: LIST OF COMPONENT (F-MKT-006-0)

THAI SUMMIT GOLD PRESS CO., LTD ใบแจง้ รายการชนิ� ส่วนประกอบย่อยทต�ี อ้ งทาํ PAGE NO.
REMARK
ITEM PART NO. PART NAME DWG. NO. QTY / OLD MODIFY NEW TSA. CUSTOMER
SET PART PART PART MAKE PURCHASE SUPPLY

THAI SUMMIT GOLD PRESS CO., LTD P/NAME : P/NO :
MODEL :
REF.TS.NO. : DATE : CUSTOMER :
MARKETING DEPT. REF.TS.INC. : DATE :

REPORTED & CHECK BY CHECKED BY APPROVED BY REVISE

............................... ......................................... ..................................
OFFICER / ENGINEER
SECTION MANAGER DEPARTMENT MANAGER NO. CHECK BY DATE
WIS-Q-082-010
F-MKT-006-0

ชือ่ เร่ือง: ข้นั ตอนการเปล่ียนแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 19 of 19

บริษัท ไทยซัมมทิ โกลด์เพรส จํากัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 5: PARTS/TOOLING CANCELLATION REPORT (F-MKT-007-0)

THAI SUMMIT GOLD PRESS CO.,LTD. Parts/Tooling Cancellation Report Document number

NO.VP11 : MODIFY-F PART NUMBER MODEL

Cancellation details Warehouse Production1
Engineering Production 2
PART NAME Quality assurance

Marketing : ……..
Planing
Purchasing

Details

Approval ฝา่ ยผลิต :…………. Purchasing

Marketing Engineering Quality assurance สว่ นวางแผนฯ Warehouse Production F-MKT-007-0
:………….

WIS-Q-082-010

ชือ่ เรื่อง: ข้นั ตอนการเปล่ียนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 20 of 19

บรษิ ทั ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

FIGURE 6: COST SUMMARY FOR PARTS / TOOLING AMENDMENT (F-MKT-008-0)

ใบสรุปคา่ ใชจ้ ่ายการเปลี�ยนแปลงชน�ิ ส่วน /อปุ กรณ์ เลขที�เอกสาร

NO.VP11 : MODIFY-F

หน่วยงานทเ�ี กี�ยวขอ้ ง

ฝา่ ยวิศวกรรม………. ฝ่ายวิศวกรรม……... ฝา่ ยวางแผนฯ ฝ่ายคลังพสั ดแุ ละวัตถุดบิ

ฝา่ ยจัดซอ�ื ฝ่ายผลิตฯ ฝา่ ยประกันคณุ ภาพ อื�นๆ

รายการชิน� ส่วน PART NO. PART NAME MODEL

บรษิ ทั

มกี ารเปลยี� นแปลงรายละเอียดของการจัดทาํ ชน�ิ ส่วน/อปุ กรณอ์ ้างถึงเอกสาร เลขที�

เปน็ การเปล�ยี นแปลงช�ินส่วน เป็นการเปลย�ี นแปลงอุปกรณ์ เปน็ การเปลย�ี นแปลงชิน� ส่วนและอปุ กรณ์

ประเภทการเปลีย� นแปลง

MODIFY REVISED ยกเลิก อ�ืน ๆ

จากการเปล�ยี นแปลงดงั กลา่ ว

ไม่มีผลกระทบต่อคา่ ใชจ้ า่ ยใด ๆ

มีผลกระทบตอ่ ค่าใช้จ่ายของ

วตั ถุดบิ จํานวน บาท
บาท
ชน�ิ ส่วน จํานวน บาท
บาท
อปุ กรณ์/ เครื�องมอื จาํ นวน

อน�ื ๆ ( etc.) จํานวน

รายละเอียดของคา่ ใช้จา่ ย (กรุณาระบโุ ดยละเอียด)

รายงานโดย อนมุ ตั โิ ดย

( )( )
ผจู้ ดั การฝ่าย F-MKT-008-0

WIS-Q-082-010
** เอกสารกรณุ าส่งกลับฝ่ายการตลาดภายใน ...............…/..................…/..................

ช่อื เร่ือง: ข้นั ตอนการเปลี่ยนแปลงและการยกเลิกชิน้ สว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 21 of 19

บรษิ ทั ไทยซัมมิท โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

DCN # REV. REVISION HISTORY REVISING BY/
APPROVE BY EFFECT DATE ISSUE BY/ REVIEW BY

16-Q-136 0 JUN 03, 2016 Mr. Songkiat / REF. DCN New version (K.Sumitra, K.Charin)
19-Q-025 1 MAY 23, 2019 Ms. Kunlapa / REF. DCN
Revise FLOW CHART (Figure 1-2) as an
20-Q-052 2 OCT 30, 2020 Ms. Kunlapa / REF. DCN Engineering (PJS part, PCS part)

(K.Sumitra, K.Charin)

Revise (Figure 3) ORDER PARTS FORM
(F-MKT-005-0) (K.Sumitra, K.Charin)

ช่ือเรื่อง: ข้นั ตอนการเปลี่ยนแปลงและการยกเลิกชิ้นสว่ นหรืออุปกรณ์ Doc. No.: WIS-Q-082-010
TITLE: PART & TOOLING AMENDMENT AND CANCELLATION
REV.: 2
Page: 22 of 19

บริษทั ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER
DISTRIBUTION TO
TSGP1 TSGP2 MKT PUR SLS QSM TSGP3

1 PURPOSE
1.1 To guide the adjustment and price agreement of parts, in case the price of raw materials
used is changed.

2 SCOPE
2.1 Use as the standards for internal operations of Thai Summit Gold Press Co., Ltd.

3 PROCEDURES (Refer to flow chart)
3.1 When the price of raw materials is changed, the outsource that acts as a Central Purchase
(the customer defines the Coil Center) will deliver the Quotation Material to the customer to
consider before adjusting the price of raw materials within the period time as agreed with
the customer.

3.2 When the customer has received the Quotation Material, they will consider the requesting to
adjust the raw material price by the period time as agreed with Central Purchase. If the
Quotation Material is not considered, customer will send the Quotation Material back to the
Central Purchase to review price again.

3.3 When the New Material Price has been considered, customers will send New Material
Price documents to TSGP or the Central Purchase for further delivery to TSGP before
adjusting raw material prices. According to the time specified by each customer by sending
through the marketing department or the purchasing department.

ช่อื เรื่อง : ข้นั ตอนการปรับเปลย่ี นราคาชิน้ ส่วน (ปรับราคาวตั ถุดิบ) Doc. No.: WIS-Q-082-
TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS 011
REV.: 1
Page: 10 of 10

บริษทั ไทยซัมมิท โกลด์เพรส จาํ กดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

-In case of marketing staff or the assigned person receives the New Material Price
document from the customer, a copy of the New Material Price document must be
collected. And then will send the original document to the raw material purchasing, the
purchasing department to summary the price and continue to build SA in the system for
preparing to order raw materials according to the modified price along with storing such
documents as quality records.

- In the event that the purchasing staff or the assigned person receives the New Material
Price document from the customer. The purchasing staff will copy the document and
deliver documents to marketing staff along with keeping the original documents for
quality records.

3.4 Marketing staff or the assigned person will review the price of parts by breaking down of
each part which will proceed to adjust the price up-down according to the material list price
that received from customers according to the form specified by each customer.

NOTE: What parts need to be adjusted price, such parts must be recorded in SAP system
before price adjustment.

3.5 After the marketing staff or the assigned person conducted a review and adjust the price of
parts, the price list of new part will be delivered (Reference the work instruction/ working
procedures WIS-Q-082-006: Pricing for Sale) to the manager for approval.

3.6 Marketing staff or the assigned person delivery the copy of the "Quotation” document of the
modified parts to the customer company within the specified period/ period time.

(Reference Form F-MKT-010 / WIS-Q-082-006: Pricing for Sale) to review and approve

the parts price again. The document will be kept as a quality record of the marketing

department.

ช่อื เร่ือง : ขน้ั ตอนการปรับเปลย่ี นราคาชิ้นส่วน (ปรบั ราคาวตั ถดุ ิบ) Doc. No.: WIS-Q-082-

011

TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS REV.: 1

Page: 10 of 10

บริษทั ไทยซัมมทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

3.7 After the customer considered an audit and approved for change cost of parts, the customer
will send documents to confirm the change cost of parts to the marketing department again.
And when the marketing staff or the assigned person by company received documents, then
need to check the information and prepare price confirmation documents "Price
Confirmation Letter" (Reference Form F-MKT-010 / WIS-Q-082-006: Pricing for sale),
which must be completed before the customer adjusts the price, after which the document is
sent to the approval manager, the price agreement document will be kept as a quality record
of the marketing department.

3.8 Marketing staff or the assigned person must be copied the "Price Agreement" document and
distributed to the sales, analysis & audit, and the accounting department with the date of
validity by distributing 1 set of each department to be kept as a document for checking the
price information in the SAP system.

3.9 Staff or assigned persons of the sales department will record the change cost of parts in SAP
system (Refer to Creating and Changing Price Master Data according to SAP SD102-01 to
SD102-11; WIG-821-015), which will be completed at least within 3 working days after
receiving the price agreement documents from the marketing department.

3.10 After the staff or a person who has been assigned by the sales department has already
recorded the price of the modified parts. Marketing staff or receiving and the accounting
staff will re-check the validity of the parts price in the SAP system, reviewing all the parts
that have been price modified. After that sign the inspection into the price agreement
document and keep it as evidence. In case of the incorrect data, must notify back to the
sales manager to revise it within 3 working days.

3.11 If there is no notification back to the sales department within 3 working days, then the sales
department will have the right that the price is completely correct and can be used it for

ชื่อเรื่อง : ข้นั ตอนการปรับเปล่ยี นราคาชิน้ ส่วน (ปรับราคาวตั ถุดิบ) Doc. No.: WIS-Q-082-
TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS 011
REV.: 1
Page: 10 of 10

บริษัท ไทยซมั มทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

work. In addition, there will be the random inspections from staff or people assigned by the
analytics and audit department according to the audit plan. And report the results to sales
managers and high-level executives/ top management levels for acknowledgment.

3.12 In case of incorrect price information and notified to the sales department already, the staff
or the persons assigned by the sales department have to expedite the correction of price
information before the 1st day of the next month.

NOTE: In the case that the customer has order, the staff or the person assigned by the sales
department will process the tax invoice based on the new price that is applicable in the
price agreement document on the website of customer’s company that has not been changed
at the agreed price. In this case, it depends on the agreement between the sales department
and customer by refer the price in the website, which is not change as the price agreement.
And the marketing department will agree with the customer to do the credit/debit note, then
a sales staff will do the “credit/ debit memo request” in SAP system by reference WIS-Q-
082-007: Quotation for New Part, after that an accounting staff will issue the credit/debit
document.

3.13 In case the marketing staff does not detect the incorrect price information, but the customer
detects. Customers will inform the marketing staff or the company's sales staff which may
be reported as a document or by phone. If the customer informs to the marketing staff,
marketing staff will have to report the incorrect price information to the sales staff again.
Then, the sales staff has to proceed with correcting the price information. (Reference step-
by-step) WIS-Q-082-007: Quotation for New Part.

ชอื่ เร่ือง : ขน้ั ตอนการปรับเปล่ยี นราคาชิ้นส่วน (ปรบั ราคาวตั ถดุ ิบ) Doc. No.: WIS-Q-082-
TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS 011
REV.: 1
Page: 10 of 10

บรษิ ทั ไทยซัมมทิ โกลด์เพรส จาํ กัด WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

NOTE: In case of incorrect price information and the customer detects it. The customer has
the right to cancel the tax invoice or notify the company to do the credit/debit note. It

depends on the needs of the customer.

ชอ่ื เร่ือง : ข้นั ตอนการปรบั เปลยี่ นราคาชิน้ สว่ น (ปรบั ราคาวตั ถุดิบ) Doc. No.: WIS-Q-082-
TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS 011
REV.: 1
Page: 10 of 10

บรษิ ทั ไทยซัมมิท โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

Flow Chart: Adjustment the part price procedures

SEND QUOTATION MATERIAL TO THE FROM: CENTRAL PURCHASE -QUOTATION MATERIAL
BCUESETNOCMHEARNGCEOPDMRP(OAACDNEJYUDSBUTERFEROSARWE3.M1THAETEPRRIICAEL HAS (CUSTORMESEPRODNESITBELREMINES COIT -TRAEBLLAET1ED DOCUMENT
ENTER) S

3.2 CUSTOMERS CONSIDER THE PRICE IN NO FROM: CENTRAL PURCHASE QUOTATION MATERIAL
THE QUOTATION 3.3 NEW MATERIAL PRICE
CENTARL PURCHASE FROM: CUSTOMER
NO TO: -CENTRAL PURCHASE -NEW MATERIAL PRICE
-QUOTATION OF EACH CUSTOMER
3. ORIGINAL 3.3 - MARKETING QUOTATION F-MKT-010
DEPARTMENTOR PURCHASING QUOTATION F-MKT-010
MARKETING SALES DEPARTMENT GET NEW DEPARTMENT (BEX) CUSTOMER’S EXTERNAL
DEPARTMENT GET NEW MATERIAL PRICE DOCUMENT MARKETING STAFF OR PERSON IN CHARGE DOCUMENTS CONFIRMATION
MATERIAL PRICE FOR STORE ORIGINAL
MARKETING MANAGER
3.
MARKETING DEPARTMENT REVIEW PARTS PRICE BY BREAK FROM: MARKETING DEPARTMENT
DOWN OF EACH COMPENENT THAT HAS INFORMATION IN SAP TO: CUSTOMER
SYSTEM
FROM: CUSTOMER
3.5 TO: MARKETING DEPARTMENT
CHECK APPROVAL
FORM: MARKETING DEPARTMENT PRICE CONFIRMATION DOCUMENT F-MKT-011
3.6 TO: SALES, ACCOUNTING, PRICE CONFIRMATION DOCUMENT F-MKT-011
SEND THE QUOTATION SHEET FOR THE PART OF THE ANALYSIS AND AUDIT DEPT.

PRICE ADJUSTMENT TO THE CUSTOMER STAFF OR PERSON IN CHARGE OF THE
SALES DEPARTMENT
3.7
CUSTOMER CONFIRM PRICE BACK AND MARKETING
STAFF OR PERSON IN CHARGE CHECK INFORMATION
AND PREPARE PRICE INFORMATION DOCUMENT AND
SEND THEM TOTHE MANAGER FOR APPROVAL

3.8

COPIES OF THE PRICE AGREEMENT DOCUMENTS
DISTRIBUTED TO THE SALES DEPARTMENT, INT, AND
ACC WITH THE DATE OF PRIOR EFFECT

3.9

STAFF OR ASSIGNED PERSON FROM THE
SALES DEPARTMENT RECORDS
INFORMATION IN ACCORDANCE WITH

3.10 3.10 STAFF OR PERSON IN CHARGE OF THE SALES, PRICE CONFIRMATION DOCUMENT F-MKT-
CHECK PRICE INFORMATION IN THE SAP MARKETING, AND ACCOUNTING DEPT 011
SYSTEM AND SIGN THE NAME TO CHECK ANALYSIS AND AUDIT
DEPARTMENT WILL STAFF OR PERSON IN CHARGE OF THE SALES, Doc. No.: WIS-Q-082-
3.11 NO RANDOMLY CHECK PRICE MARKETING, AND ACCOUNTING DEPT 011
IF THERE IS AN ERROR, INFORM THE SALES INFORMATION IN THE REV.: 1
DEPARTMENT WITHIN 3 WORKING DAYS SYSTEM. IF YOU FIND AN Page: 10 of 10
ERROR, INFORM THE
3.12 SALES DEPARTMENT
IF THE WRONG OPERATION REACHES THE
CUSTOMER, THE SALES DEPARTMENT MUST STAFF OR PERSON IN CHARGE OF THE
REVISE ACCORDING TO WIG-821-015 SALES DEPARTMENT

ช่ือเรื่อง : ข้นั ตอนการปรับเปล่ียนราคาชิ้นส่วน (ปรับราคาวตั ถดุ บิ )

TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS

บริษัท ไทยซัมมิท โกลด์เพรส จํากดั WORK INSTRUCTION

THAI SUMMIT GOLD PRESS CO., LTD. DOCUMENT CONTROL CENTER

DCN # REV. Effective date REVISION HISTORY
Issue by/ Review by Revising details/ Approved by
16-Q-137 0 JUN 03, 2016
Mr. Songkiat/ Ref. DCN New version (K.Sumitra, K.Charin)
19-Q-023 1 MAY 16, 2019
Ms.Kunlapha/ Ref. DCN Re-Confirm to use this WI for 3 years
(K.Sumitra, K.Charin)

ชื่อเร่ือง : ข้นั ตอนการปรับเปลย่ี นราคาชิน้ สว่ น (ปรบั ราคาวตั ถดุ บิ ) Doc. No.: WIS-Q-082-
TITLE: WORK INSTRUCTIION FOR CHANGE COST OF PARTS 011
REV.: 1
Page: 10 of 10


Click to View FlipBook Version