• Usage of PPE Kemahiran 5.7 Obtain drawing and speci 5.8 Identify formwork location 5.9 Identify formwork requirem 5.10 Prepare formwork tools 5.11 Prepare formwork mater 5.12 Clear work area 5.13 Execute setting out 5.14 Fabricate formwork 5.15 Install formwork and pro 5.16 Align formwork 5.17 Clean work area 5.18 Dismantle formwork and Sikap 5.19 Meticulous and precise 5.20 Systematic in setting u 5.21 Time and cost consciou Keselamatan 5.22 Alert to beam formwork h 5.23 Adhere to DOSH require Persekitaran 5.24 Adhere to Department of 5.25 Adhere to 3R’s (Reduce
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 fication n ments and equipment rial op/ support d prop/ support e in setting up beam formwork p beam formwork us in completing task hazard ements f Environment requirements , Reuse and Recycle) practices
KRITERIA P BIL. TAFSIRAN 1 List out and explain the approved construction drawing and s layout). 2 List out and explain the purpose and function of beam formwo 3 List out and explain the beam formwork location, design, type 4 List out and explain approved material, methods, types, and d 5 Demonstrate clean and functioning formwork tools and equipm 6 Demonstrate flat, clean, and free from defect of formwork ma 7 Demonstrate the work area cleared and alignment (horizonta 8 Demonstrate beam formwork fabricated referring to material a 9 Demonstrate beam formwork and prop installed (for upper be vertical), tightness, rigidity, and stability. 10 Demonstrate construction debris cleaned and transferred to d 11 Demonstrate tools and equipment cleaned and kept. 12 Demonstrate excess materials stored at designated area. 13 Demonstrate foundation formwork dismantled without shock o
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 PENILAIAN RUJUKAN NOSS (CoCU) pecifications (structure drawing and floor plan 3.1 ork. 3.3 (P) es, and materials identified. 3.2 – 3.5 (K) dimension of formwork prepared. 3.4 – 3.5 (K) ment prepared. 3.4 (K) aterial prepared. 3.5 (K) l and vertical) marked. 3.6 – 3.7 (K) and size. 3.8 (K) eam) referring to alignment (horizontal and 3.9 – 3.10 (K) designated area. 3.11 (K) 3.11 (K) 3.11 (K) or vibration. 3.12 (K)
14 Apply 3R’s (Reduce, Reuse and Recycle) concept. Jam Pertemuan (Training Duration) Standard Kandungan (Work Activities) Stan (Le 15 jam (3 minggu) Teori: 6 jam Amali: 9 jam 6.0 Perform beam reinforcement Pengetahuan 6.1 Content of structural draw • Propose project title • Symbols / colour • Layout and location • Specification 6.2 Understanding of structu 6.3 Purpose and function of r 6.4 Types of reinforcement: • High Yield Steel (Y, T • Mild Steel (R) 6.5 Fabrication and installatio 6.6 Purpose of cleaning reinf 6.7 Reinforcement fabrication • Cut • Bend • Tied • Placed reinforcemen 6.8 Purpose of spacers and f 6.9 Types of spacer which inc • Plastic • Steels • Concrete 6.10 Types of fastener:
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 3.12 (K) dard Pembelajaran earning Standard) Catatan wing: ral drawing reinforcement T, H) on method forcement bar (rust/ oil free) n process: nt bar fastener installation cludes: Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen Kontrak
KRITERIA P • Timber • Wire • Steel bar Kemahiran 6.11Obtain drawing and spec 6.12Identify reinforcement loc 6.13Identify reinforcement re 6.14Prepare reinforcement to 6.15Fabricate (cut and form) 6.16Install fabricated reinforc specification 6.17Clean work area Sikap 6.18Meticulous and precise i 6.19Meticulous in fabricating 6.20Systematic in fabricating 6.21Time and cost conscious Keselamatan 6.22Alert to reinforcement ba 6.23Adhere to DOSH require Persekitaran 6.24Adhere to Department of 6.25Adhere to 3R’s (Reduce
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 PENILAIAN cification cation equirements ools and equipment reinforcement cement and spacer blocks drawing and n interpreting structural construction drawing of reinforcement bar g reinforcement bar work s in completing task ar hazard ements f Environment requirements , Reuse and Recycle) practices
BIL. TAFSIRAN 1 List out and explain the approved construction drawing an plan layout) 2 List out and explain purpose and function of reinforcemen 3 List out and explain the beam reinforcement location, size identified 4 List out and explain approved methods and types of bea 5 List out, explain and demonstrate clean and functioning b material prepared 6 Demonstrate reinforcement bent and length fabricated 7 Demonstrate reinforcement secured and lapped against d 8 List out and explain type and purpose of spacers installa 9 Demonstrate fabricated reinforcement and spacer blocks length, shape, types, and position installed 10 Demonstrate construction debris cleaned and transferred 11 Demonstrate tools and equipment cleaned and kept 12 Demonstrate excess materials stored at designated area
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 RUJUKAN NOSS (CoCU) nd specifications (structure drawing and floor 3.1 – 3.2 nt 3.3 (P) es, length, shape, types, and position 3.2 – 3.3 (K) m reinforcement prepared 3.3 – 3.5 (P) beam reinforcement tools, equipment, and 3.4 (K) 3.5 (K) displacement using binding wire 3.6 (K) ation 3.8 – 3.9 (P) horizontally referring to location, sizes, 3.6 (K) d to designated area 3.6 (K) 3.7 (K) 3.7 (K)
Jam Pertemuan (Training Duration) Standard Kandungan (Work Activities) Stan (Le 13 jam (3 minggu) Teori: 6 jam Amali: 10 jam 7.0 Perform beam concreting Pengetahuan 7.1 Content of structural drawin • Propose project title • Symbols / colour • Layout and location • Specification 7.2 Understanding of concrete & coarse aggregate, Water 7.3 Concrete mix ratio 7.4 Types of concrete mix: • Ready mix • Site mix (which inclu 7.5 Types and functions of tool • Shovel • Wheelbarrow • Measurement box • Mixer 7.6 Slump test (workability test 7.7 Cube test (strength test) 7.8 Location of concrete pourin 7.9 Concrete handling: • Hand carry • Wheelbarrow • Pump • Crane 7.10 Purpose of cleanliness a 7.11 Purpose of concrete com 7.12 Purpose of concrete cur
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 dard Pembelajaran earning Standard) Catatan ng: e ingredient (which includes: - Cement, Fine r and water cement ratio) des: - Hand, Mixer) s and equipment for mixing on site: ) ng area at pouring space mpaction / consolidation ing process Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen kontrak
KRITERIA P 7.13 Types of curing agent / m • Water (which include • Chemical spray • Plastic cover Kemahiran 7.14 Obtain drawing and spec 7.15 Identify concreting locati 7.16 Identify concreting requir 7.17 Prepare concreting tools 7.18 Clear work area 7.19 Execute concreting surfa Sikap 7.20 Meticulous and precis 7.21 Systematic in performi 7.22 Systematic in performi 7.23 Time and cost conscious 7.24 Awareness on M&E se Keselamatan 7.25 Alert to concrete mixing 7.26 Adhere to DOSH require Persekitaran 7.27 Adhere to Department of 7.28 Adhere to 3R’s (Reduce
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 PENILAIAN method which includes: - es: - Direct water spray, Gunny sack) cification on rements s and equipment ace se in interpreting structural drawing ng concrete mixing work ng concrete pouring work s in completing task ervices hazard ements f Environment requirements , Reuse and Recycle) practices
BIL. TAFSIRAN 1 List out and explain the approved construction drawing and s layout) 2 List out and explain understanding of concrete ingredient 3 List out and explain concrete mix ratio and grade 4 List out and explain he beam concreting location, grades, ma 5 List out and Demonstrate clean and functioning concreting to 6 Demonstrate the work area cleared 7 Demonstrate lean concrete poured evenly 8 Demonstrate mixing of concrete according to ratio 9 Describe, prepare and demonstrate slump test (workability te 10 Describe, prepare and demonstrate cube sampling (strength 11 Demonstrate concrete poured and compacted in layer evenly 12 Demonstrate concrete surface horizontally levelled referring t 13 Demonstrate construction debris cleaned and transferred to d 14 Demonstrate tools and equipment cleaned and kept 15 Demonstrate excess materials stored at designated area
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 RUJUKAN NOSS (CoCU) pecifications (structure drawing and floor plan 3.1 3.2 (P) 3.3 (P) aterial, and methods identified 3.2 – 3.3 (K) ols, equipment, and material prepared 3.4 (K) 3.5 (K) 3.6 (K) 3.5 (P) 3.6 (K) est) 3.6 (P) test) 3.7 (P) y 3.11 (P) to height 3.7 (K) designated area 3.10 (P) 3.8 (K) 3.8 (K)
16 List out and explain method of concrete curing identified 17 Demonstrate curing of concreting surface executed 18 Apply 3R’s (Reduce, Reuse and Recycle) concept Jam Pertemuan (Training Duration) Standard Kandungan (Work Activities) Stan (Le 10 jam (2 minggu) Teori: 4 jam Amali: 8 jam 8.0 Inspection beam work Pengetahuan 8.1 Work requirements • Purpose of formwork • Drawing and specific • Method of statement 8.2 Inspection tools • Types of formwork to • Types of reinforcem • Types of concreting • Usage of tools • Function of tools 8.3 Safety requirements (PPE • Types of PPE (Refle Glove, Goggle) • Usage of PPE 8.4 Formwork component • Ground beam • Column • Upper floor beam / ro • Floor slab • Arches • Staircase
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 3.13 (P) 3.9 (K) 3.8 (K) dard Pembelajaran earning Standard) Catatan k / reinforcement /concreting cation ools (measuring tape, spirit level) ent tools (clipper, measuring tape) tools (measuring tape, spirit level) E) cted vest, Safety boots, Hard head, Hand oof Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen Kontrak
8.5 Assessment specification 1.5.1 Formwork • Dimension • Location / level • Alignment (horizonta • Stability of assemble 1.5.2 Reinforcement wor • Cleanliness • Dimension • Tightness • Location level • Alignment (horizontal • Adequacy of spacer 1.5.3 Concreting work • Mixing ratio/ Design • Slump test • Workability • Cube sampling • Levelness • Curing process 8.6 Types of defect: 1.6.1 Formwork • Chipping • Crack • Warping 1.6.2 Concreting work • Honeycomb • Crack • Bulging • Segregation • Cold joint 8.7 Formwork /Reinforcemen 8.8 Formwork /Reinforcemen • Format (INSPECTIO • Content Kemahiran
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 n: l, vertical and slanting) d rk l, vertical and gap) mix nt/ Concreting time frame preparation nt/ Concreting inspection form N REQUEST, checklist)
• Formwork 8.9 Interpret drawing require 8.10Determine formwork insp 8.11Check dimension of form 8.12Check location / level of 8.13Check alignment of insta 8.14Check stability of assem 8.15Check formwork work de 8.16Monitor time frame of for 8.17Prepare formwork work i • Reinforcement work 8.18 Interpret drawing require 8.19 Determine inspection too 8.20 Check cleanliness of rein 8.21 Check dimension and tig 8.22 Check location / level of 8.23 Check alignment of insta 8.24 Check adequacy of spac 8.25 Monitor reinforcement p 8.26 Prepare reinforcement w • Concreting work 8.27 Interpret drawing require 8.28 Determine inspection too 8.29 Check Mixing ratio/ desig 8.30 Monitor conformance du 8.31 Monitor preparation of cu 8.32 Check coverage and lev 8.33 Monitor compliance in c 8.34 Check concreting work d 8.35 Monitor time frame of co 8.36 Prepare concreting work Sikap 8.37 Meticulous and precise concreting preparation 8.38 Time and cost conscio 8.39 Comply method of stat
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 ments and specifications pection tools mwork installed formwork alled formwork bled and / or installed formwork’s efect rmwork preparation inspection form ements and specifications ols nforcement bar ghtness of fabricated reinforcement installed fabricated reinforcement alled fabricated reinforcement cer and fastener reparation time frame work inspection form ements and specifications ols gn mix uring slump test activities ube sampling velness of poured concrete oncrete curing process defect oncrete work k inspection form e in inspecting formwork/ reinforcement/ ous in completing task tement
KRITERIA P BIL. TAFSIRAN 1 Understand and explain types of drawing requirements, spec understood 2 List and explain inspection tools 3 Measure dimension of formwork 4 Measure and verify dimension and tightness of fabricated rein 5 Verify location / level of installed formwork / fabricated reinfor 8.40 Integrity on inspection Keselamatan 8.41Ensure compliance to HS Persekitaran 8.42Adhere to Department of
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 PENILAIAN RUJUKAN NOSS (CoCU) ifications and method of statement 1.1, 2.1, 3.1 1.2, 2.2, 3.2 1.3 (K) nforcement 2.4 (K) rcement 1.4 (K), 2.5 (K) work SE requirements f Environment requirements (wastage)
6 Verify alignment (horizontal, vertical and slanting) of installed 7 Verify stability of assembled and / or installed formwork 8 Explain formwork work defect 9 Verify cleanliness (rust free) of reinforcement bar 10 Confirm adequacy of spacer and fastener 11 Verify mixing ratio / design mix 12 Verify conformance during slump test activities 13 Verify preparation of cube sampling 14 Update coverage and levelness of poured concrete check list 15 Verify compliance in concrete curing process 16 List and explain concreting work defect 17 7 Confirm time frame of formwork / reinforcement / concret 18 8 Produce formwork / reinforcement / concreting work inspe
KSKV SVM TEKNOLOGI PEMBINAAN SEMESTER 1 formwork / reinforcement 1.5 (K), 2.6 (K) 1.6 (K) 1.6 (P), 1.7(K) 2.3 (K) 2.7 (K) 3.3 (K) 3.4 (K) 3.5 (K) t updated 3.6 (K) 3.7 (K) 3.5 (P), 3.8 (K) ing work preparation 1.8 (K), 2.8(K) ection form 1.9 (K), 2.9 (K)
WTP1134 TEKNOLOGI PEMBINAAN KEMENTERIAN PEN KURIKULUM STANDAR NAMA KURSUS : KERJA P KOD KURSUS : WTP112 TAHUN / SEMESTER : 1 / SEME JAM KREDIT : 4 JAM PERTEMUAN : BERSEM TIDAK B JENIS KURSUS : VOKASI
KERJA PAIP, SANITARI DAN ELEKTRIK 1 DIDIKAN MALAYSIA D KOLEJ VOKASIONAL PAIP, SANITARI DAN ELEKTRIK 24 ESTER 1 MUKA : 6 JAM / MINGGU BERSEMUKA : 1 JAM / MINGGU ONAL
WTP1134 TEKNOLOGI PEMBINAAN HASIL PEMBELAJARAN KURSUS Di akhir kursus, murid sepatutnya dapat: - 1. Mengenalpasti keperluan spesifikasi pelanggan. 2. Melaksanakan semakan aplikasi fail. 3. Melaksanakan penetapan reka letak kerja/halaman. 4. Memuktamadkan penetapan reka letak kerja/halaman SINOPSIS KURSUS Tetapan kerja pencetakan digital/ susun atur halaman ialah proses susun at disahkan berdasarkan spesifikasi doket kerja (job docket) dan keperluan pe kerja/halaman bagi memastikan pengeluaran dapat dilaksanakan dengan Operasi Standard (SOP) industri. Murid yang cekap dalam kerja perceta keperluan spesifikasi pelanggan, menjalankan semakan aplikasi fail, tetapa halaman mengikut doket kerja, keperluan pelanggan dan Prosedur Operas
KERJA PAIP, SANITARI DAN ELEKTRIK 2 tur kerja/ halaman di mana tugas/halaman terperinci disemak, disunting dan elanggan. Kompetensi ini adalah untuk memuktamadkan tetapan susun atur berkesan selaras dengan doket kerja, keperluan pelanggan dan Prosedur akan digital/ tetapan susun atur halaman ini hendaklah dapat menyemak n susun atur kerja/ halaman dan memuktamadkan tetapan susun atur kerja/ i Standard (SOP) industri.
WTP1134 TEKNOLOGI PEMBINAAN STANDARD KANDUNGAN DAN Jam Pertemuan Standard Kandungan Sta 40 jam (4 minggu) Teori: 8 jam Amali: 32 jam 1. Mengesahkan Sistem perpaipan Pengetahuan 1.1 Menerangkan kep (i) Tujuan sist (ii) Lukisan & (iii) Kaedah pe 1.2 Mengenalpasti ala (i) Jenis alata (ii) Kegunaan (iii) Fungsi alat 1.3 Mengenalpasti jen (i) Paip air se (ii) Paip air pa 1.4 Menerangkan jen (i) Paip PVC (ii) Paip ABS (iii) Paip HDPE (iv) Paip Besi B (v) Paip Temb 1.5 Menjelaskan kepe (i) Jenis PPE keselamata (ii) Penggunaa 1.6 Melaksanakan pe (i) Lokasi (ii) Bahan (iii) Saiz
KERJA PAIP, SANITARI DAN ELEKTRIK 3 N STANDARD PEMBELAJARAN ndard Pembelajaran Catatan perluan sistem perpaipan tem perpaipan spesifikasi enyataan at pemeriksaan sistem perpaipan an (pita pengukur, pengepit) alatan tan nis paip ejuk anas is bahan E Bergalvani (GI) baga erluan keselamatan (PPE) (vest pantulan, but keselamatan, topi an, sarung tangan, gogel) an PPE enilaian spesifikasi sistem perpaipan Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media sosial • Dokumen kontrak
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta 1.7 Menerangkan jen (i) Bocor (ii) Sambunga (iii) Kemek (iv) Berkarat 1.8 Menyediakan rang 1.9 Mengenalpasti bo (i) Format (pe (ii) Kandungan Kemahiran 1.10 Mentafsir keperlua 1.11 Menentukan alat 1.12 Menyemak lokasi 1.13 Memantau ujian s 1.14 Memeriksa kecac 1.15 Mengemaskini bo Sikap 1.16 Teliti dan tepat da 1.17 Mementingkan ma 1.18 Mematuhi kaedah Keselamatan 1.19 Memastikan pema Persekitaran 1.20 Mematuhi keperlu
KERJA PAIP, SANITARI DAN ELEKTRIK 4 ndard Pembelajaran Catatan is kecacatan sistem perpaipan an gka masa sistem perpaipan orang pemeriksaan sistem perpaipan ermintaan pemeriksaan, senarai semak) n an dan spesifikasi lukisan pemeriksaan , bahan dan saiz paip sistem perpaipan catan sistem perpaipan orang pengesahan sistem perpaipan alam mengesahkan sistem perpaipan asa dan kos dalam menyelesaikan tugas h penyataan atuhan kepada keperluan HSE uan Jabatan Alam Sekitar
WTP1134 TEKNOLOGI PEMBINAAN Bil. Kriteri 1 Menerangkan jenis keperluan lukisan, spesifikasi dan kaedah penya 2 Senaraikan dan terangkan alatan pemeriksaan 3 Kemas kini dan sahkan lokasi, bahan dan saiz paip 4 Mengesahkan ujian sistem perpaipan 5 Menerangkan kecacatan sistem perpaipan 6 Kemas kini borang pengesahan sistem perpaipan sepenuhnya Jam Pertemuan Standard Kandungan Sta 2. Mengesahkan sistem kebersihan Pengetahuan 2.1 Menerangkan kep (i) Tujuan sis (ii) Lukisan & (iii) Kaedah pe 2.2 Menerangkan ala pembersihan (i) Jenis alata (ii) Pengguna (iii) Fungsi ala 2.3 Menerangkan kep (i) Jenis PPE keselamat (ii) Pengguna
KERJA PAIP, SANITARI DAN ELEKTRIK 5 ia Penilaian ataan ndard Pembelajaran Catatan perluan sistem kebersihan stem kebersihan spesifikasi enyataan at pemeriksaan dalam sistem an (pita pengukur) aan alatan atan perluan keselamatan (PPE) E (vest pantulan, but keselamatan, topi tan, sarung tangan, gogel) aan PPE Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen kontrak
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta 2.4 Mengenalpasti pe kebersihan (i) Lokasi (ii) Bahan (iii) Saiz (iv) Kecerunan 2.5 Menjelaskan jenis (i) Bocor (ii) Sambunga (iii) Kemek 2.6 Menyediakan ran 2.7 Menjelaskan bora (i) Format (pe (ii) Kandunga Kemahiran 2.8 Mentafsir keperlu 2.9 Mengenalpasti al 2.10 Menyemak lokas senarai semak 2.11 Memeriksa keca 2.12 Memantau ujian s 2.13 Mengemas kini b Sikap 2.14 Meneliti semasa m 2.15 Mementingkan m tugas 2.16 Mematuhi kaedah
KERJA PAIP, SANITARI DAN ELEKTRIK 6 ndard Pembelajaran Catatan enilaian dan spesifikasi dalam sistem n s kecacatan dalam sistem sanitari an ngka masa sistem kebersihan ang pemeriksaan sistem pembersihan ermintaan pemeriksaan, senarai semak) an uan dan spesifikasi lukisan lat pemeriksaan i, bahan dan saiz paip pembersihan- acatan dalam sistem kebersihan sistem kebersihan borang pengesahan sistem pembersihan mengesahkan sistem kebersihan masa dan kos dalam menyelesaikan h penyataan
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta Keselamatan 2.17 Memastikan pem Persekitaran 2.18 Mematuhi keperlu Bil. Kriteri 1 Menerangkan jenis keperluan lukisan, spesifikasi dan kaedah penya 2 Mengenalpasti alatan pemeriksaan 3 Menentukan lokasi, bahan dan saiz paip sanitari berdasarkan senara 4 Menerangkan kecacatan dalam sistem pembersihan 5 Mengesahkan ujian dalam sistem kebersihan 6 Mengemas kini borang pengesahan sistem pembersihan dengan len Jam Pertemuan Standard Kandungan Sta 3. Mengesahkan elektrik kerja Pengetahuan 3.1 Menerangkan ke (i) Tujuan ke (ii) Lukisan & (iii) Kaedah pe 3.2 Menerangkan ala (i) Jenis alata
KERJA PAIP, SANITARI DAN ELEKTRIK 7 ndard Pembelajaran Catatan atuhan kepada keperluan HSE uan Jabatan Alam Sekitar ia Penilaian ataan ai semak ngkap. ndard Pembelajaran Catatan perluan kerja elektrik rja elektrik spesifikasi enyataan at pemeriksaan kerja elektrik an (pita pengukur, gunting) Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta (ii) Pengguna (iii) Fungsi ala 3.3 Menerangkan jen (i) Konduit (ii) Kabel 3.4 Menjelaskan kep (i) Jenis PPE keselamat (ii) Pengguna 3.5 Menyatakan spes (i) Lokasi (ii) Bahan (iii) Saiz 3.6 Menerangkan jen (i) Sambunga (ii) Kemek (iii) Tidak dilet 3.7 Menyediakan ran 3.8 Menjelaskan bora (i) Format (pe (ii) Kandunga Kemahiran 3.9 Mentafsir keperlu 3.10 Tentukan alat pe 3.11 Semak lokasi, ba pemasangan elek 3.12 Pantau ujian siste 3.13 Periksa kecacata
KERJA PAIP, SANITARI DAN ELEKTRIK 8 ndard Pembelajaran Catatan aan alatan atan nis bahan perluan keselamatan (PPE) E (vest pantulan, but keselamatan, topi tan, sarung tangan, gogel) aan PPE sifikasi kerja elektrik nis kecacatan kerja elektrik an takkan ngka masa kerja elektrik ang pemeriksaan kerja elektrik ermintaan pemeriksaan, senarai semak) an uan dan spesifikasi lukisan meriksaan ahan, dan saiz saluran, kabel dan ktrik em elektrik an sistem elektrik • Dokumen kontrak
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta 3.14 Kemas kini boran Sikap 3.15 Teliti dan tepat da 3.16 Mementingkan m tugas 3.17 Mematuhi kaedah Keselamatan 3.18 Memastikan pem Persekitaran 3.19 Mematuhi keperlu Bil. Kriteri 1 Memahami dan menerangkan jenis keperluan lukisan, spesifikasi da 2 Senaraikan dan terangkan alatan pemeriksaan 3 Kemas kini dan sahkan lokasi, bahan dan saiz senarai semak salura 4 Senaraikan dan terangkan kerosakan sistem elektrik 5 Sahkan ujian sistem elektrik 6 Kemas kini borang pengesahan sistem elektrik sepenuhnya
KERJA PAIP, SANITARI DAN ELEKTRIK 9 ndard Pembelajaran Catatan ng pengesahan sistem elektrik alam mengesahkan kerja elektrik masa dan kos dalam menyelesaikan h penyataan atuhan kepada keperluan HSE uan Jabatan Alam Sekitar ia Penilaian an kaedah penyataan an, kabel dan pemasangan elektrik
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta 4. Sediakan perangkap kelodak basuh (Silt trap wash through) Pengetahuan 4.1 Lukisan perangka (i) Tajuk proj (ii) Simbol (iii) Susun atu (iv) Lokasi 4.2 Jenis perangkap 4.3 Jenis pencucian 4.4 Membina perang (i) Ukur (ii) Menanda (iii) Dimensi (iv) Penjajaran (v) Membina 4.5 Jenis serpihan bi 4.6 Jenis alatan dan 4.7 Prosedur penyim 4.8 Keperluan kesela (i) Jenis PPE keselamat (ii) Pengguna Kemahiran 4.9 Mengenalpasti lu 4.10 Mengenal pasti p lokasi 4.11 Membina perang 4.12 Membersihkan ka Sikap
KERJA PAIP, SANITARI DAN ELEKTRIK 10 ndard Pembelajaran Catatan ap kelodak dan kolam cuci tayar: ek ur kelodak kap kelodak dan proses mencuci: n naan peralatan pembersihan mpanan alatan dan peralatan amatan (PPE) E (vest pantulan, but keselamatan, topi tan, sarung tangan, gogel) aan PPE ukisan dan spesifikasi perangkap kelodak dan mencuci melalui kap kelodak dan kolam cuci tayar awasan kerja, Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen kontrak
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Sta 4.13 Rajin, sabar, dan kelodak dan lalua Keselamatan 4.14 Mematuhi keperlu (i) Pakai PPE yan Persekitaran 4.15 Mematuhi keperlu 4.16 Mematuhi amalan Bil. Kriteri 1 Mentafsir lukisan dan spesifikasi pembinaan yang diluluskan (perangkap ke 2 Menerangkan perangkap kelodak dan cuci melalui lokasi, reka bentuk, jenis 3 Terangkan perangkap kelodak dan basuhan yang dibina di lokasi, tapak rat 4 Terangkan serpihan pembinaan yang dibersihkan dan dipindahkan ke kawa 5 Bersihkan dan tunjukkan alatan dan peralatan 6 Tunjukkan lebihan bahan yang disimpan di kawasan yang ditetapkan
KERJA PAIP, SANITARI DAN ELEKTRIK 11 ndard Pembelajaran Catatan n teliti dalam menjalankan perangkap n mencuci uan keselamatan ng betul uan Jabatan Alam Sekitar n 3R (reduce, reuse and recycle). a Penilaian elodak dan cucian) s dan bahan yang dikenal pasti ta dan dimensi asan yang ditetapkan
WTP1134 TEKNOLOGI PEMBINAAN Jam Pertemuan Standard Kandungan Stan 5. Menyediakan longkang perimeter Pengetahuan 5.1 Mengenalpasti kan (i) Tajuk proje (ii) Simbol (iii) Susun atur (iv) Lokasi 5.2 Menjelaskan kecer perimeter 5.3 Proses saliran peri (i) Ukur (ii) Menanda (iii) Dimensi (iv) Penjajaran (v) Menggali (vi) Pasang 5.4 Jenis serpihan bina 5.5 Jenis alatan dan pe 5.6 Prosedur penyimpa 5.7 Keperluan keselam (i) Jenis PPE keselamata (ii) Penggunaa Kemahiran 5.8 Mengenalpasti luki 5.9 Mengenalpasti loka 5.10 Membina longkang 5.11 Memastikan kawas Sikap 5.12 Rajin, sabar dan te
KERJA PAIP, SANITARI DAN ELEKTRIK 12 ndard Pembelajaran Catatan ndungan lukisan longkang perimeter: ek r runan, saiz, jenis, dan bahan longkang meter bangunan: aan eralatan pembersihan anan alatan dan peralatan matan (PPE) (vest pantulan, but keselamatan, topi an, sarung tangan, gogel) an PPE san dan spesifikasi asi longkang perimeter g perimeter san kerja bersih eliti dalam menjalankan longkang perimeter Nota: Sumber rujukan maklumat: • Laman web • Buku • Majalah • Media social • Dokumen kontrak