pg. 1
TABLE OF
CONTENT
GENERAL INTRODUCTION
BUSINEES PORTFOLIO
AZ BUILDERS GROUP OF COMPANY
GROUP OVERIEW
LEAD CORPORATION COMPANY
COMPANY CERTIFICATE
ORGANIZATION FLOW CHART
HEAVY MACHINERY/EQUIPMENT
MEMBER SHIP
1. SCAFFOLDING
2. CONSTRUCTION BUILDING
3. ROAD CONSTRUCTION
4. CONSTRUCTION MATERIALS IMPORT EXPORT
5. READY MIX CONCRETE
6. FOUNDATION
pg. 1
pg. 2
GROUP
OVERVIEW
AZ BUILDERS GROUP OF COMPANIES, dedicates to serve the needs for the
construction industries in Cambodia and with management expertise team from Cambodia,
Malaysia, Taiwan. Japan, England, South Africa, Singapore, Philippine, Taiwan, Germany ,
China, Vietnam, Korean and several countries.
Setting up in 2018 and Grouping all the companies into ONE Group to operate into One Stop
Solution and with the Management Team that have more than 30year Engineering Experience
to ensure fulfill OUR Clients needs for their projects.
Technology is the soul and research and the development is the core competence in our
Groups to ensure only proven products, system implemented to serve the construction
industries.
In the intensified competition, AZ BUILDERS GROUP COMPANIES in Lead by AZ
Builders Co., Ltd. has invested and introduced several industries such as sub-contractor on
Road and Bridges, Infrastructure, foundation, Civil and Structural, renovation works, Fire
Protection, Mechanical, Electrical and Plumbing works, Sub-contracting Scaffolding and
services,Ready mix Concrete, Construction Equipment, Steel Engineering, Landscape,
Aluminum Glass and Curtain Walls, Aluminum Façade, Aluminum Formworks, geo syntactic
products, Manufacturing of Custom made Furniture’s, Structures Repairs and Water proofing
products, concrete admixtures, and others well known products.
AZ BUILDERS GROUP COMPANIES will continue in practicing environmental
protection, construction safety, economical, quality assurance and responsibility in leading the
construction industries dedicating to build a reputation company to enhance our group profile
to support and serve the construction Industries.
LAM TIT POW, MACD
GROUP DIRECTOR/ADVISOR
pg. 5
LEAD CORPORATION
COMPANY
AZ BUILDERS is a 100% owned company and headed by Oknha Lim Bunsour, is the
appointed company BY OUR Chairman to conduct the core construction relation sector on
the feasibility studies, negotiation and sharing information with business clients, partners or
intended business cooperation in both Cambodia or Overseas.
At present, AZ Builders in Cambodia is the largest and highest safety scaffolding company in
Cambodia with the ISO 9001:2015,ISO 14001:2015 AND ISO 45001: 2018 certification as
construction company involve in constructing Road ,bridge and Civil Engineering projects.
A dynamic humble and young company established in year September 2018, with this short
period has established subsidiaries company in Thailand and Malaysia and towards
establishing companies within the Asean Region.
As a company which understand the needs of the budget for the developments projects both in
private and sector which created the company AZ which means we will do our upmost best
for the requirement compliance by our project needs from A to Z.
AZ Builders established business partner and working partner with some of the most
established company both international or local such as MCCO, Shanghai Baoiye
Construction, China State Engineering construction (CSEC), Power China Sino Hydro, Taisei
Corporation, Obayashi Corporations, Bites Plc., Hyundai Engineering, Hanshin Engineering,
Namkwang Engineering & Construction, VINCI Construction ., LBL International, SOMA
Construction And Development., SOM Corporation, Daun Penh Construction, AZI E&C and
others.
With our Company Motto: WE ARE FAMILY looking forward we could bring our partners
and clients together accomplishing our project as family.
pg. 6
MISSION
VISION & POSITION
MISSION STATEMENT
□ OFFER HIGH QUALITY CONSTRUCTION, PRODUCTS AND
SERVICES TO FUIFIL THE DEMAND OF OUR CLIENT’S
□ ESTABLISH A STRONG RELATIONSHIP WITH CLIENTS, BUILDERS AND AUTHORITIES
□ PROVIDE CUSTOMER SATISFACTION AT MAXIMUM
LEVEL BY PRESENTING PRODUCTS AND SERVICES THAT
ARE DESIGNED AND MANUFACTURED IN COMPLIANCE
WITH OUR CUSTOMER NEEDS AND EXPECTATIONS.
□ ENSURE OUR PRODUCTS AND CONSTRUCTION MEET THE
HIGEST STANDARD SPECIFICATION.
VISION STATEMENT
□ BECOME THE MOST TRUSTED SOURCE AND MULTI TRADE
INDUSTRIAL CONTRACTING AND ENGINEERING BASED ON
DESIGN, TECHNICAL EXPERT AND CONTINOUES RESEARCH
AND DEVELOPMENT.
□ BECOME AN ICON AND PROMOTE QUALITY, SAFETY AND
COMPLIANCE TO STANDARD.
POSITION
□ AZ BUILDERS GROUP OF COMPANIES - A CAMBODIAN
COMPANY, GLOBAL STANDARD.
pg. 7
pg. 13
pg. 14
pg. 15
pg. 16
ORGANIZATION CHART
pg. 17
HEAVY
MACHINERY/EQUIPMENT
No. Equipment Brand Model Capacity Year of Qty Remark
Type Name MD08 2200rpm Manufacture 4
Matador 1
1 Bulldozer ISUZU 2020 1
JMC 1
2 Cargo truck JMC 2020
JMC 13
3 Cargo truck Shacman 2020 1
Matador 2
4 Cargo truck 2019
Matador 2
5 Cement Tanker 1
JMC 4
6 Dumper 6x4 SDLG WD615.47 30t 2020 2
2020 1
7 Excavators Matador ME130W 95kWA/2000rpm 1
Volvo ME210LC 2020
8 Excavators JMC 116kW(156HP)/ 2
2000 rpm 2020
2020 4
9 Fuel Trucks G9190 500L-10000L 2020
10 Motor Grader 11.12t
11 Motor Grader 2020
12 Rollers MG16 2200rpm 2020
13 Touring
SD110 11.2t
- 15 set
14 Unit Truck JMC JX1032D 1.5t 2020
Matador 1800rpm 2020
15 Vibration Rollers MC26M/
MC22M
16 Water Trucks JMC ISDe185 40 7000L 2020
pg. 18
Summary List of Survey’s
Equipment
No. Equipment Brand Name Model Capacity Year of Remark
Type Topcon OS-602G Manufacture 3 Nos.
1.3~500m
1 Total Station GTS-255N fine:0.9 second, fast:0.7 2001
KB0928 second, tracking:0.3
2 Electronic Total Topcon second 2002 2 Nos.
Station Measure up to 3100m
2mm + 2PPm 2014 4 Nos.
3 Total Station Topcon ES-105 D: +/-0.2mm + 2.0PPm 2018 4 Nos.
A:2.0 ̎ (Seconds) 2018 5 Nos.
2019 6 Nos.
4 Auto Level B40 Sokkia WD6369 Length:215mm(8.46in)
5 Auto Level Topcon AT-B0 0.5-0.7mm/km 215mm
6 Auto Level Topcon ATB3A/B4A 2.0 mm (1km double run
Levelling)
A. Total Station
B. Auto Level
pg. 19
MEMBERSHIP
The GATEWAY- Meeting and Compliance with
the Highest Safety Standard Requirements Build
by MCC Company
pg. 20
pg. 21
PROJECT INFORMATION
DESCRIPTION DETAILS
Name of Project R&F CITY
Location PHNOM PENH
Status Ongoing
Project Value 1.588,859.91
No Of Floors 36x 12 TOWER
Estimated M2 400,000M2
Scope Of Work Scaffolding
Painting Works
Supply Concrete
PROJECT INFORMATION DETAILS
DESCRIPTION LEE HOTEL
Name of Project SIHANOUKVILLE
Location Ongoing
Status
Project Value 72,440
No Of Floors 20
Estimated M2 7244
Scope Of Work SCAFFOLDING
pg. 26
PROJECT INFORMATION DETAILS
DESCRIPTION THE BUND
Name of Project SIHANOUKVILLE
Location Ongoing
Status 428,341.54
Project Value
20
No Of Floors
Estimated M2 DESIGN AND
BUILD
SCAFFOLDING
Scope Of Work
PROJECT INFORMATION
DESCRIPTION DETAILS
Name of OCIC HEAD OFFICE
Location PHNOM PENH
Status Ongoing
Project Value 88,159.50
No Of Floors 19
Estimated M2 3000
Scope Of Design & Build
Scaffoldings Works
pg. 27
pg. 28
No.5
Date: 2019-2019
Project Introduction
Owner: TF ENGINNERING CO., LTD
Location: Kob Srov, Phnom Penh
Joint Venture: AZ Builders Sub-Contractor
Contract Price: US$ 332,300.00USD
Scope of Service: Glass Factory project
Scope
Steel Structures Factory
No.6
Date: 2019-2019
Project Introduction
Owner: TF ENGINNERING CO., LTD
Location: ST08, Special Economic Zone
Phnom Penh
Joint Venture: AZ Builders Sub-Contractor
Contract Price: US$ 195,000.00USD
Scope of Service: Warehouse 50x95 project
Scope
Steel Structures
pg. 28
No.7
Date: 2019-2019
Project Introduction
Owner: TF ENGINNERING CO., LTD
Location: ST08, Special Economic Zone
Phnom Penh
Joint Venture: AZ Builders Sub-Contractor
Contract Price: US$ 514,640.00USD
Scope of Service: Chip MongWare House project
(90x112)
Scope
Basic Building Description
Steel Work finish for Buildings
Design Loads
No.8
Project Factory our Asset
Owner: AZ Builders Co., ltd
Location: Krong Takhmau
Scope of Service: 2.2 Hectare Warehouse and steel
works fabrication factory project.
pg. 29
PROJECT INFORMATION
DESCRIPTION DETAILS
Name of Project NOKOR SAMRITH HOTEL
Location Toul Kork
Status Ongoing
Project Value 1.65M
No Of Floors 09
Estimated M2 11000
Scope Of Work Sub Structure
Upper Structure
Concrete Supply
PROJECT INFORMATION
DESCRIPTION DETAILS
Name of Project ORU HOTEL
Location SIHANOUKVILLE
Status Ongoing
Project Value 1.80M
No Of Floors 14
Estimated M2 12000
Scope Of Work Sub Structure
WET WORKS
pg. 30
PROJECT INFORMATION
DESCRIPTION DETAI
Name of Project L’ATTRAITE CONDO
Location PHNOM PENH
Status Ongoing
Project Value 69,478.20
No Of Floors 23
Estimated M2 3000
Scope Of Work Architectural Works
Wet Works
Ceiling Works
Scaffoldings Works
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: TKS Office
Location: Phnom Penh
No of Floors: 9 Floor
pg. 31
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: VISAL APARTMENT
Location: Sihanouk Ville
No of Floors: 15 Floor
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: SOK PHENG VILLA
Location: Camko Phnom Penh
No of Floors: 3 Floor
pg. 32
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: Casino & Hotel
Location: Poi Pet
No of Floors: 21 Floor
pg. 33
pg. 34
No.1
Date: 2016-2017
Project Introduction
Owner: ING Holding Co., Ltd
Location: Phnom Penh City (Road 60m)
Joint Venture: AZ Investment Co., Ltd-ING
Member Holding JV
Contract Price: US$ 36,000,000
Scope of Service: Investment Project
Scope
Earth works - Ancillary works
Sub-base and Base course
Structure and Box culvert
Drainage and Protection works
AD Pavement
No.2
Date: 2017-2018
Project Introduction
Owner: MRD
Location: NR 41 (KPS 2,3,4)
Joint Venture: AZ Investment Co., Ltd-ING
Member
Contract Price: US$ 4,500,000
Scope of Service: Rural Road Improvement
Project KPS 2,3,4
Scope
Earth works - Ancillary works
Sub-grade works - DBST works
Sub-base course & Base course
Drainage and Box culvert
pg. 34
No.3
Date: 2018-2019
Project Introduction
Owner: MRD
Location: Takeo and Kampong Chhnang
Project
Joint Venture: AZ Builders Sub-Contractor
Member for CGCD
Contract Price: US$ 5,263,285.58
Scope of Service: Rural Road Improvement
project TK+1,7,8,9
Scope
Earth works - DBST works
Sab-grade works -Ancillary works
Sub-base course and Base course
Drainage and Box culvert
No.4
Date: 2018-2019
Project Introduction
Owner: MPWT
Location: Phnom Penh City
Joint Venture: Sub-Contractor for
Member OBAYASHI
Contract Price: US$ 1,200,000
Scope of Service: Improvement Project
Scope
Drainage works North side
Repainting works
Finishing and repairing works
Scaffolding works
pg. 35
pg. 36
Our Information
BETON CONCRETE INDUSTRIES is a Cambodian and Singaporean Experience
established Partnership Company with committed to provide a wide range of ready-mix
concrete with Stronger, Durability and Better Performance.
BCI Head Office is located in ING CITY
PHNOM PENH.
BCI is expecting to catch the attention of
many clients and contracting companies
based on the high quality performance
concrete of the offered product.
BCI is planning to build a strong image
and market position in Cambodia.
BCI aims to produce various kinds of
concrete including High Strength, light
weight concrete and dry mix concrete,
suitable for large or medium scale
building works, bore pile, d‐wall road and
bridge works.
BCI’s mission is to exceed our customer’s
satisfaction and to become the single
trusted source of high quality concrete.
pg. 36
5. PROJECT
FOUNDATION
PROJECT INFORMATION
DESCRIPTION DETAILS
THAI BOON ROONG
Name of Project TOWER
Location PHNOM PENH
Status KIV
Project Value 3.2 M
No Of Floors 133 X 2 & 65 X4
Estimated M2 SUPPLY CONCRETE
Scope Of Work
WATERPROOF
MATERIALS
`
D - WALL
BOREPILE
PROJECT INFORMATION
DESCRIPTION DETAILS
WEALTH MANSION
Name of Project
Location PHNOM PENH Fin
Status FINALIZING ACCOUNT ACCOUNT
Project Value 3.2 M
No Of Floors 133 X 2 & 65 X4
CONCRETE
Estimated M2 SUPPLY CONCRETE
Scope Of Work
BOREPILE
pg. 37
6.PROJECT SOIL IMPROVEMENT
AND CIVIL WORK
PROJECT INFORMATION
DESCRIPTION DETAILS
SIHANOUKVILLE AIRPORT
Name of Project STAFF CAMP
Location SIHANOUKVILLE AIRPORT
Status COMPLETE
Project Value
No Of Floors
Estimated M2 Supply and Install PVD
Scope Of Work
Supply and Install PHD
Backfill
Design and Build Staff Camp
pg. 38
7.PROJECT INFRASTRUCTURE
AND CIVIL WORK
PROJECT INFORMATION
DESCRIPTION DETAILS
BAN NONG IAN BORDER
Name of Project CROSSING FACILITIES
Location THAILAND
Status Ongoing
Project Value
No Of Floors
Estimated M2
Scope Of Work Infra-Structure
Road
Building & Architectural
Works
Steel Structure
pg. 39
8.PROJECT STEEL STRUCTURE
WORKS
PROJECT INFORMATION
DESCRIPTION DETAILS
EXCHANGE SQUARE
Name of Project PHNOM PENH
Location Phnom Penh
Status Ongoing
Project Value
No Of Floors
Estimated M2
Scope Of Work Steel Structure Works
pg. 40
9.PROJECT EARTH WORKS
PROJECT INFORMATION
DESCRIPTION DETAILS
O KAI DONG
Name of Project
Location Banthey Menchey
Status Completed
Project Value
No Of Floors
Estimated M2
Scope Of Work Earth / Backfill Works
pg. 41
10.SELECTED PROJECT PHOTO
PROFILE CIVIL /SCAFFOLDING/
CONCRETE SUPPLY
THE GATEWAY THE SKYLINE CONDOMINIUM
THE D’SEAVILLE THE 133FLOORS THAI BOON
ROONG TWIN TOWER
THE R & F CITY THE SKY VILLA
pg. 42
11.THE ABOVE IS ONLY PART OF
THE PROJECT PHOTO
The Sunshine Bay Hotel the Penthouse Resident
The Bali Resort No3 The Láttrait
The Bali Resort No 5 The OCIC Head office
pg. 43
12.ON GOING PROJECT
THE AGILE SKY RESIDENT THE PICASSO CITY THE MARITIME TOWER
THE CHIP MONG TOWER THE CENTRAL HOSPITAL THE FLATIRON
THE BUND THE AEON MALL 3
pg. 44
13. Borepile
MACHINERIES AND EQUIPMENTS
Fasten up you work with our new Machineries
1 Unit of SANF 365R 1 Unit of SANY 265r 2 Unit of SANY 155R
pg. 38
TESTING METHODS
SONIC TEST KODEN TEST & PDA TEST
PDA Testing Sonic Testing
Koden Testing
pg. 39
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: Hotel
Location: Sihanouk Ville
No of Floors: 6 Floor
PROJECT INFORMATION
DESCRIPTION: DETAI
Name of Project: Office Building
Location: Veng Sreng Blvd Phnom Penh
No of Floors: 9 Floors
pg. 40
14. RAILWAY REHABILITATION
PROJECT INFORMATION
DESCRIPTION DETAILS
Name of Project Railway Rehabilition
Client
MPWT ,Cambodia
Location Battambang
Status Completed
Project Value USD4.35M KHD CONSTRUCTION AND COOPERATION CO LTD
Scope Of Work Rehabilitation of Railway Track
pg. 41