3S258 MANNING AVENUE • WARRENVILLE, IL 60555 • PH: 630.393.9050 • FAX 630.393.1531 City f
Warrenville
DETACHED GARAGE
A building permit is required for the construction of a detached garage.
SUBMITTAL DOCUMENTS
1) Completed permit application. If application is submitted by someone other than the
property owner, signed authorization by the property owner must be provided at time of
application.
2) Plat of Survey (3 copies) showing the location and dimensions of all existing
structures/improvements on the property and the location of the proposed detached garage;
3) Drawing, Plan, or Manufacturers Brochure (3 copies) showing construction details, including
material types and method of construction.
REQUIREMENTS:
1) It is the responsibility of the homeowner/contractor to arrange to have the underground
utilities located before any digging. The number for J.U.L.I.E is 1.800.892.0123. J.U.L.I.E
requires 48 hours notice before digging.
2) The building permit fee for a detached garage is $6.00 per $1,000.00 with a minimum fee of
$60. A plan review fee, also based on square footage will be assessed by the Plan Examiner
and added to the building permit fee along with a building bond of $100.00. This bond is
refundable upon completion and approval of the project in accordance with all applicable
City Ordinances. All fees and bonds must be paid before permit issue. No work shall begin
without a permit. If work begins without a permit, permit fees may be doubled.
3) It takes approximately one to two weeks to process permit applications and issue permit.
You will be called when permit is ready for pick-up.
4) It is the responsibility of the homeowner, occupant, or contractor on completion of the garage
to call and arrange all inspections with the Building Department. A minimum 24-hour
notice is required when scheduling any inspection. The number to call is 630.393.9050.
REQUIRED INSPECTIONS:
1) Footing & Wall
2) Trench foundation (if applicable)
3) Underground Electrical (if applicable)
4) Rough Electric
5) Rough Frame
6) Final Electrical
7) Final Building
REGULATIONS:
1) Detached Garages must be constructed within the guidelines of the specifications outlined in
Table 10A and Table 10B of the current City of Warrenville Zoning Ordinance.
2) Maximum ground floor area of any accessory building and cumulative for all accessory
buildings on the property in Residential Districts shall not exceed:
On Lots <18,000 sf. 650 sf.
On Lots 18,000 sf. – 40,000 sf. 825 sf.
On Lots >40,000 sf. 2.5% of the lot size, up to a maximum
size of 2,000 sf. (cumulative for all
accessory buildings on the lot)
3) Detached garages are subject to the maximum lot coverage and maximum coverage of rear
yard requirements.
4) Maximum detached garage height in Residential Districts:
On Lots <18,000 sf. 23 feet*
On Lots 18,000 sf. – 40,000 sf. 24 feet*
On Lots >40,000 sf. 27 feet*
In R-6 Districts 18 feet
*Maximum eave height shall not exceed ten (10) feet. The eave height shall be the
vertical dimension between finished floor and the top of the lowest edge of roof plywood.
5) Detached garage must be a minimum of eight feet (8’) from the principal building and six feet
(6’) from any other accessory building (except sheds less than 120 square feet in area placed
on the side of the garage facing interior and rear yards) in which case the setback may be
reduced to zero feet (0’).
6) Detached garage may be constructed in the rear yard and interior side yard. The minimum
required setback from property line is three (3) feet.
7) Any detached garage and accessory structure larger than 120 square feet must have a
“thickened edge” concrete slab, 10” inches deep by 20” inches wide with 4” of compacted
gravel under a 4” inch concrete slab minimum.
8) Any detached garage that will be heated or cooled must have an approved building paper
installed under the siding.
9) Any detached garage that is temperature controlled must have “ice and water shield” installed
in lieu of the first row of felt paper when roofing.
10) No accessory structure may be built in any easement.
11) A final inspection is required upon completion. (homeowner to arrange)
Things to consider when hiring and working with contractor(s)…
When hiring a contractor it is a good idea to get a written estimate, which includes the specific work
to be performed, the time frame involved, and your cost.
When making a payment request a detailed receipt of the work and materials you are paying for.
It is also a good idea to request a waiver of lien in consideration for final and full payment. A final
waiver of lien waives and releases the contractor’s right to claim a lien for labor, services, or
materials, furnished for the project.
Issuance of a permit does not exempt you from the rules and regulations of your Home Owners
Association (HOA). If your HOA requires you to have their approval prior to filing for a permit and
you have not done so, please contact them immediately before commencing work on this project.
This pamphlet is to be used as a guide only.
There may be certain specific special requirements not indicated in this pamphlet.
CITY OF WARRENVILLE ILLINOIS APPLICATION FOR CONSTRUCTION OR USE
FILL ALL APPLICABLE BLANKS FURNISH ALL SUPPORTING PLANS & DOCUMENTS Date Permit #
Applicant* Applicants Address
*If application is submitted by someone other than the property owner,
signed authorization by the property owner must be provided at time of application.
Owners Site Address
Parcel #
Subdivision Floodplain on Yes No
Property?
PERMIT IS HEREBY REQUESTED FOR CONSTRUCTION OF THE FOLLOWING
Addition or Remodel New # of Units BOND DEPOSIT OFFICE USE ONLY PERMIT FEE
FAMILY RESIDENCE BUILDING
COMMERCIAL ELECTRICAL
MANUFACTURING PLUMBING
SIGN ELEVATOR
ACCESSORY STRUCTURE SIGN
POOL PLAN REVIEW
ELECTRICAL GRADING
PLUMBING DEMOLITION
WRECKING CERT OF OCC
GENERAL CONTRACTOR TOTAL $ .
Address BOND
Phone # Fax # WATER/SEWER CONNECT
ELECTRICIAN* GRAND TOTAL $ .
Address * Electricians must be registered with the city of Warrenville to work in the city of Warrenville.
Phone # Fax # License # Municipality
Bond # Date Company
Rooms Bathrooms Basement Garage Heating Unit Air Cond New Service Service Rev Range Dryer Sign Outlets Fixtures Switches
ROOFING CONTRACTOR
Phone # Fax # License #
PLUMBER
Phone # Fax # License #
Toilets Lavatories Kit Sink Dishwasher Bar Sink Auto Wash Tub/Shower Lndry Tray Fir Drains Drnk Fount Wash Fount Urinals Ttl Sq Ft
SIGNATURE OF APPLICANT Phone # Fax #
VALUE of Construction (Your Cost) $ Date
Date
Zoning Officer Date
Approved by
Issued by
CONDITIONS
See Code Review for Conditions of Permit Updated1/27/2011
3S258 MANNING AVENUE • WARRENVILLE, IL 60555 • PH: (630) 393-9050 • FAX (630) 393-1531 City f
CITY OF WARRENVILLE Warrenville
AUTHORIZED AGENT CONSTRUCTION OR USE PERMIT CONSENT FORM
Property Owner Information…
Property Address __________________________________________________________________________________
Name __________________________________________________________ Phone #___________________________
e-mail Address _____________________________________________________________________________________
Address ____________________________________________________________________________________________
I Hereby Authorize ________________________________________________________________________________
To Apply for Permit For: Addition Build-Out Commercial
(check all that apply) Deck/Patio/Porch/Gazebo/Breezeway Driveway Electric
Fence HVAC Plumbing Pool Remodel
Roof SFR Other _____________________________________
Property Owner’s Signature ________________________________________________ Date_________________
By executing this document the Property Owner acknowledges his/her understanding that (i) the City typically
attaches specific conditions and requirements to building permits it issues, and (ii) the property owner is ultimately
responsible to insure that all applicable City permit and inspection fees are paid, all required City inspections are
requested and performed, and all specific building permit conditions and requirements are complied with.
Authorized Agent Information…
Name ___________________________________________________________ Phone #__________________________
Company Name ___________________________________________________________________________________
e-mail Address _____________________________________________________________________________________
Address ____________________________________________________________________________________________
Print Name of Person Receiving Permit___________________________________________________________
Authorized Agent’s Signature ______________________________________________ Date________________
CDD Rep Signature__________________________________________________________Date_________________
Building Permit #___________________________