MONROE, NORTH CAROLINA
CELEBRATING OVER 30 YEARS OF
State Utility Contractors, Inc.
4417 Old Charlotte Highway
Monroe, NC 28110
Phone - 704.289.6400
Fax - 704.282.0590
www.sucontractors.com
Who we are.... www.SUContractors.com
EXPERIENCE
IS THE KEY
State U�lity Contractors, Inc. is an Unlimited, Unclas-
sified General Contractor that is 100% employee
Owned and Operated. We are recognized in the Con-
struc�on Industry as a leading and reputable firm
in the southeastern region of the United States. We
began opera�ons in early 1985, our principals consist
of key management personnel of Dickerson U�lity, Inc.,
the u�lity construc�on en�ty of the Dickerson Group.
Our construc�on experience and management phi-
losophies predate the Company’s forma�on by nearly
twenty years. Over the years, we have been commi�ed
to providing our clients with an excellent product by
opera�ng efficiently with integrity.
Our most important strength is our employees, the ma-
jority of our employees have been with the company
on average for nearly 20 years. Since we are a 100%
Employee Owned Company, the employees take pride
in performing their work realizing that they ARE the
Company.
Due to the experience of our employees, our next
important strength is our ability to SELF-PERFORM our
Work. While other construc�on firms rely solely upon
Subcontractors, fortunately over the years we have
been able to develop skilled cra�smen that allow us to
perform, on average, nearly 60% to 75% of our projects
u�lizing our own forces. This is an example of where
our people give us an advantage over our compe��on.
Who we are....
What is our Mission.... www.SUContractors.com
PERFORMANCE
OUR MISSION STATEMENT
• To be recognized as the Premier Builder of en-
vironmental service facili�es in the Carolinas
and Virginia.
• To earn this recogni�on by producing the
highest quality facili�es to meet our clients’
needs within their projects’ design, specifica‐
�on, and budgetary constraints.
• To develop high quality cra� and supervisory
personnel through a commitment to safety,
training, and team building efforts.
• To pursue sufficient profit margins to allow
our company to grow in quality and financial
strength, thereby providing enhanced career
opportuni�es for our personnel and a fair
return on our share holders’ investment.
A WINNING PHILOSOPHY
We believe that the ul�mate goal of each construc�on
project is for that project to be mutually beneficial to
all par�es involved. Open communica�on, coopera�on
and mutual respect for each party’s strengths and re-
sponsibili�es are the surest routes to realizing that ul-
�mate goal. Along with our strength of our employees,
we also are able to boast that we have long-standing
working and financial rela�onships with our Vendors,
Equipment & Material Suppliers, as well as our Subcon-
tractors.
What is our Mission....
Our Affilia�ons.... www.SUContractors.com
BONDING
Over the years, we have been fortunate to be consis-
tantly profitable which has resulted in our long term fi‐
nancial stability. This stability has enabled us to have an
excellent rela�onship with one bonding company since
the incep�on of the company, The Har�ord Accident
and Indemnity Company. We have an untested bonding
program that currently has an aggregate bonding limit
that exceeds $125 million, with a single project limit of
$50 million.
• Bonding Agent:
Rutherford
6230 Fairview Rd.
Charlo�e, NC 28210
p: 704.367.3478
Contact: Martin Pallazza
INSURANCE
We have had our comprehensive business coverage
sa�sfactorily handled by one insurance company and
agent since we went into business.
• Insurance Agent:
Wells Fargo Insurance Services
6100 Fairview Rd.
Charlo�e, NC 28210
p: 704.556.2588
Contact: Mr. Mike Link
ASSOCIATIONS
• Carolinas Associated General Contractors
• Associated General Contractors of America
• North Carolina U�lity Contractors Associa�on
• Na�onal Society of Professional Engineers
• NC & SC Sec�on of the AWWA
• U.S. & Union Co. Chambers of Commerce
• Design-Build Ins�tue of America (DBIA)
Our Affilia�ons....
What we have to offer.... www.SUContractors.com
OUR PERSONNEL
Our management staff includes graduate and reg‐
istered engineers. Collec�vely, our personnel have
extensive experience in the construc�on of water and
wastewater treatment facili�es, pumping sta�ons, and
water / sewer line systems. Profiles of our manage‐
ment personnel will be provided to you upon your
request. Our field personnel are highly skilled cra�s-
men, equipment operators, and supervisors who take
great pride in their work.
SAFETY AND SUBSTANCE ABUSE
PROGRAMS
Our safety program has the full a�en�on of every
employee, beginning with the president. The strong
safety program we have for new employees is manda-
tory regardless of posi�on within the company. At
least weekly safety mee�ngs and rou�ne, daily site
safety inspec�ons are conducted by our project super-
intendents or our company safety director.
We maintain an ac�ve and ongoing alcohol and sub-
stance abuse program, and we require pre-employ-
ment and random tes�ng of all employees.
SERVICES
We are rou�nely engaged in three major areas of con-
struc�on:
• Water and Wastewater Treatment Facili�es
and Pumping Sta�ons
• Water and Sewer Line Systems
• Land Development Infrastructures
Project delivery methods
• Design - Build
• Construc�on Manager at Risk
• Tradi�onal Design - Bid – Build
WWhhaattwweehhaavveettooooffffeerr.....
Company
Flow Chart
SCTOANTTERAUCTTILOIRTSY Company Flow Chart
I Chris Ricketson Ron Brown Steve Brown
Safety President Line Division Exec.
Mike McLamb
Plant Division Exec. 20 Year.; 32 Years 25 Years
29 Years I Peggy Taylor
Controller
Mike Nobles Randal Blakmon Wade Burgess
Chief Estimator Safety 31 Years Equipment
33 Years I I
Accounts Payable
I Accounts Receivable 3 - Mechanics
David Lucas Payroll & HR --Superintendent Dustin Wagner
Estimator Line Division VP
Scott Little
911Years -Chris Heyward 21Years Chief Estimator
I Senior PM-VP �- 21 Years
Brian Freeze Superintendent Superintendent ,-- Justin Collins
Estimator Estimator
25 Years
28 Years 68Years
IDerrick Morgan - Mike Paluso
I Jeff Dyke Project Manager
-Project Manager
Senior Project Superintendent Superintendent ,__ 30 Years
Engineer Superintendent
11 Years -,__ I
39 Years
I Dale Schmidt
Bill Cheek Project Manager
Senior Project Todd Wasson 1-- Superintendent
Project Manager 9 Years
Engineer
11 Years Superintendent ,__
32Years
I
I I
Zach Wooten Andrew Merritt
Project Engineer Project Manager 1-- Superintendent
4 Years 11 Years
I Superintendent ,__
Scott McCall - Superintendent
Project Manager
Superintendent
5Years
President
President
Ron L. Brown President
Years of Experience: 32
Ron is a 1986 graduate of the University of North Carolina at Charlotte with a Bachelor of
Engineering Technology Degree in Mechanical Engineering. Ron has spent his entire
career with State Utility having started immediately upon graduating college. After a few
early years working in the field as a foreman, assistant superintendent and
superintendent he moved into the office where he worked as Estimator, Chief Estimator,
Project Manager and eventually Pipeline Division Manager. His responsibilities included
the oversight of all project management, estimating and field operations for a division
doing in excess of $25 million annually. In October of 2016 Ron became President of
State Utility Contractors in charge of all operations that includes a workforce of
approximately 175 employees and annual revenues in excess of $50 million.
Brown has been very active in his industry having served as Past President of the North
Carolina Utility Contractors Association and currently serves on the Board of Directors of
the Carolinas Association of General Contractors as Vice Chair. Ron has also been very
active in the community serving as past Board Chair of the Union County Chamber of
Commerce, Board Chair of Union Academy Foundation, President of Monroe Rotary Club
and President of Rolling Hills Country Club. He currently serves on the Monroe Tourism
Development Authority and the Union County Community Arts Board.
www.SUContractors.com
Plant Division
Team Resumes
Team Resume
Mike McLamb RELEVANT EXPERIENCE CONTINUED
Executive Vice President Beaufort WWTP Upgrade and Expansion, Beaufort, NC
Plant Division Manager Scope of work included an upgrade and expansion of the
existing WWTP to a new flow rate of 1.5 MGD. Construction
Mike is a graduate of The University of North Carolina at Charlotte included a New Influent Pump Station, Influent Screening and
with a BS in Civil Engineering Technology – Construction Emphasis. Grit Removal, Oxidation Ditch, (2) Clarifiers, Effluent Tertiary
Mike began with State Utility Contractors, Inc. immediately after Filters, Effluent Pump Station, Chlorine Contact & Re-
completing his college undergraduate degree. During the past 29 aeration Basin, RAS Pump Station, (2) Aerobic Digesters, Belt
years, Mike has worked in estimating, project engineering, project Filter Press and Sludge Storage Structure and Operations
management and senior management over all construction. He Building.
currently serves as division manager of our treatment plant Constructed Value: $16.7 Million
division where he is responsible for all operations of the division. Project duration was 22 months, completed in March 2010.
Mike’s career is unique in that he has spent his entire professional Owner: City Of Beaufort, NC
career with State Utility Contractors working his way up through Contact: Mr. John Young / 252.728.2141(Retired)
the various ranks. His passion is growing and preparing the next Engineer: Rivers and Associates
generation of water and wastewater treatment construction Contact: Mr. Gale Smith / 252.752.4135
professionals. He is very involved with CM & ET programs for
several universities and community colleges throughout NC & SC City of New Bern, NC Water Treatment Plant
to create and develop career interest in the field of environmental Scope of work included construction of a new 5.5 million
and renewable energy construction. From a management gallon per day Pressure Filter Water Treatment Facility
experience standpoint, over the last 29 years Mike has managed with 2 million gallon ground level prestressed concrete
multi projects from preconstruction through the commissioning / water storage tank and on site lined Backwash Holding
start-up period. Projects have ranged in size up to $30 million. Basins. Project also included piping and site work for 15
offsite Deep Wells as well as various piping modifications
Years of Experience: 29 at the existing Water and Wastewater Treatment Plants.
Over the past 29 years Mike has been manager and Constructed Value: $20.3 Million
coordinator of numerous treatment plants on going Project duration was 18 months, completed in January
simultaneously. The following is a summary of several 2010.
major projects: Owner: City of New Bern , SC
Engineer: Rivers & Associates
RELEVANT EXPERIENCE Contact: Mr. Blaine Humphrey, P.E. / 252.752.4135
Camden WWTP, Camden, SC City of Jacksonville Nanofiltration Water Treatment
Scope of work included an upgrade and expansion to an existing Plant, Jacksonville, NC
WWTP to a new flow rate of 4.0 MGD. Construction included a Scope of work included construction of a new 8 MGD
new masonry Administration Building / Lab, Influent Headworks Nanofiltration Water Treatment Plant, including Process
Facility 35 FT below grade, Fine Bubble & Coarse Bubble Aeration Building, Membrane Treatment System, Hydrogen Sulfide
Basin, (2) 80 ft. diameter Clarifiers, Sludge Processing / Blower Stripping and Odor Control, 2 MG Ground Storage Tank,
Building, Sludge Transfer Pumping Station, Aqua Aerobic driven Finished Water Pumping System, with appurtenances,
Sludge Holding / Digester Tank, Liquid Lime Facility, Maintenance piping and associated site work which included wooden
Building, Influent Pump Station Electrical Building, Effluent UV pile foundations for support of all concrete structures.
Facility, with 42” Dia. Effluent Diffuser installed below water level Constructed Value: $21.9 Million
of the adjacent tributary. Project duration was 24 months, completed in April 2010.
Constructed Value: $30 Million Owner: City of Jacksonville ,NC
Project Duration was 25 months, Scheduled to be completed in Contact: Mr. Wally Hansen / 910.938.5330
June 2014. Engineer: McKim & Creed. P.A.
Owner: City of Camden Contact: Mr. Kevin Eberle, P.E. / 919.223.8091 (deceased)
Contact: Mr. Kyle Smith / 803.572.1492
Engineer: URS/B.P. Barber & Associates www.SUContractors.com
Contact: Keith Cannon, P.E. / 803.254.4400
Team Resume
Christopher B. Heyward
Vice President/Senior Project Manager
LEED AP
RELEVANT EXPERIENCE
Chris is a construction professional with over 25 years of Circle at Ninth Street
professional experience and millions of dollars of successfully Durham, NC
managed Water & Wastewater Treatment Plant projects. He is 303 unit mul�‐family housing
experienced in all aspects of construction, which includes but $35.5 Million
is not limited to, negotiations and development of contracts, Senior Project Manager
estimating, material procurement, subcontractor and supplier Owner: Crescent Resources, LLC
coordination, project scheduling, stake‐out/surveying, CAD, and Architect: Cline Design Associates, LLC
value engineering on construction methods.
West Ashley Booster Pump Station
Chris joined State U�lity Contractors, Inc. in 1996 as an office Charleston, NC
engineer/draftsman and assistant project manager upon New 26MGD Finished Water Booster Pump Station
completion of a degree in Civil Engineer Technology. In 1999 he $5.9 Million
was promoted to Project Manager. From 1999 to the present Senior Project Manager
he managed or been involved in the management of Water & Owner: Commissioners of Public Works, Charleston, SC
Wastewater Treatment Plant construction projects ranging from Contact: Mr. Larry Drolet / 843.727.7148
new facilities to renovations and existing facilities. Engineer: CDM Smith
Contact: Jonathan Lapsley, PE / 704.342.4546
Education
Central Piedmont Community College Greenville Wastewater Treatment Plant
Associate of Applied Science in Civil Engineering Technology Electrical & SCADA Upgrades
1996 New Power Building, Additions to Blower and South Electrical
Building, Replacement of Power Distribution Equipment and
The University of North Carolina at Charlotte New SCADA System
Civil Engineering Technology Greenville, NC
10,000 sf
FMI Project Manager’s Skills College (University of Florida) $10.5 Million
Project Manager
Registrations Owner: Greenville U�lilities Commission
LEED Accredited Professional (GBCI) Contact: Dan Tracy or Thomas Hardison / 252.551.2066
NC & SC General Contractor License (Qualifier) Engineer: Brown and Caldwell
AGC Supervisors Ins�tute Contact: Ryan Sprowl, PE / 919.424.1434
Affiliations Woodruff‐Roebuck Water Treatment Plant
USGBC, CAGC, NCNUCA Construction of a New 4.4 MGD Water Treatment Plant with
a 2 million gallon pre-stressed concrete finished water
Years of Experience: 25 reservoir, pump stations, an operations building, chemical
storage and feed facilities, two (2) residuals lagoons with
pumping facilities, various vaults, splitter boxes, plant
instrumentation, site work and piping.
Woodruff, SC
$13.6 Million
Senior Project Manager
Owner: Woodruff Roebuck Water District
Contact: Curt Dillard PE, General Manager p: 864.476.3188
Engineer: Black & Veatch Corpora�on
Contact: Derek Sco�, PE p: 864.234.6678
www.SUContractors.com
Team Resume
C. Derrick Morgan RELEVANT EXPERIENCE
Project Manager Woodruff‐Roebuck Water Treatment Plant
Construc�on of a New 4.4 MGD Water Treatment Plant
Derrick is a construc�on professional with over 12 years of with a 2 million gallon prestressed concrete finished water
professional experience and millions of dollars of successfully reservoir, pump sta�on, an opera�ons building ,chemical
managed Water and Wastewater Treatment projects. Derrick storage and feed facili�es, two (2) residuals lagoons with
is experienced in all aspects of the construc�on industry, this pumping facili�es, various vaults, spli�er boxes, plant
includes, but is not limited to, nego�a�ons and development of instrumenta�on, site work and piping.
contracts, es�ma�ng, material procurement, subcontractor and Woodruff, SC
supplier coordina�on, project scheduling, stake‐out/surveying, $13.6 Million
CAD, billing and payment procedures and value engineering. Project Manager
Owner: Woodruff Roebuck Water District
Derrick joined State U�lity Contractors, Inc. in May 2006 upon Contact: Curt Dillard PE, General Manager p: 864.476.3188
gradua�ng with a degree in Construc�on Managment from Engineer: Black & Veatch Corpora�on
Western Carolina University. Derrick began working on a project Contact: Derek Sco�, PE p: 864.234.6678
site as a Field Engineer. In 2008, Derrick was promoted to an
Office Engineer/Assistant Project Manager. In 2009, Derrick’s Black River Wastewater Treatment Plant
efforts earned him the opportunity to be promoted to Project Upgrade to an exis�ng WWTP that included construc�on
Manager. From 2009 to the present Derrick has been sucessfully of a new Influent Pump Sta�on, grit removal and pumping
managing construc�on projects ranging from new facili�es to equipment.
renova�ons and exis�ng facili�es. Dunn, NC
$4.7 Million
Educa�on: Project Manager
Western Carolina University Engineer: Davis Mar�n Powell & Associates, Inc.
Bachelors of Science in Construc�on Management 2006 Contact: Mr. Robert Davis, PE / 336.886.4821
Affilia�ons: Beaufort Wastewater Treatment Plant Upgrade & Expansion
Member of CAGC Young Leader Action Committee Upgrade and expansion to an exis�ng WWTP to increase
Derrick is a founding member of the CAGC Young Leader Action the plant capacity by 1.5 MGD, this included New influent
Committee and continues to be actively involved with the Young screen equipment and grit removal, New oxida�on ditch, New
Leaders. The Action Committee has been instrumental in the Clarifiers, Effluent Filters, Effluent Pump Sta�on, Chlorine
growth, development and community involvement of the AGC Contact, Belt Press & Sludge Storage and Opera�ons Building.
Young Leaders throughout the Carolinas. Beaufort, NC
Western Carolina University Advisory Board Member $16.7 Million
Habitat for Humanity Assistant Project Manager
Owner: City of Beaufort, NC
Registrations: Engineer: Rivers and Associates, Inc.
NC and SC General Contractors License Qualifier Contact: Mr. Gale Smith / 252.752.4135
Years of Experience: 12 Muddy Creek Wastewater Treatment Plant Upgrades
Winston‐Salem, NC
Upgrade to an exis�ng WWTP that included construc�on of a
new Secondary Clarifier, modifica�ons to exis�ng Secondary
Clarifier distribu�ons, Clarifier modifica�ons, RAS Pump Sta�on
Modifica�ons, associated Sitework, Demoli�on, Electrical,
HVAC and Architectural work.
$12.1 Million
Project Manager
Owner: City of Winston‐Salem
Contact: Mr. Keith Jones, PE / p: 336.345.7277
Engineer: Hazen and Sawyer
Contact: Mr. Anthony Greiner, PE / 336.292.7490
www.SUContractors.com
Team Resume
Jeffery C. Dyke
Project Manager / Senior Project Engineer
Joined State Utility in October 2000 as a Project Engineer RELEVANT EXPERIENCE
and was promoted to Project Manager in 2008. Prior
experience consisted of 21 years of heavy/highway Northwest Water Treatment Plant Improvements Phase 2
construction work with a strong background in field Construction of Filtration system improvements to (8) filter cells
layout. Current duties consist of overseeing one or two including new Air scour equipment, piping and Filter Media,
ongoing projects at a time. Responsibilities include shop Construction of a new high service pump station with six (6) new
drawing review, material procurement, subcontractor and vertical turbine pumps in cans, Electrical improvements,
supplier coordination, project scheduling, preparing Expansion of the existing Administration Building, new 36” – 60”
monthly pay requests, field layout and CAD. Over the past Ductile Iron Yard Piping, Chemical Feed Piping, Asphalt Paving,
seventeen years Jeff has been a Project Engineer/Project Curb & Cutter.
Manager and coordinator of numerous projects. The - Constructed Value: $8.7 Million
following is a summary of the major projects. - Project duration was 11 months, completed in June 2016.
- Owner: Brunswick County
Education: - Contact: John Nichols, P.E. Phone 910.253.2653
Broome Community College - Engineer: HDR Engineering, Inc.
Associate of Applied Science on Civil Technology - Contact: Eric Williams Phone 910.575.8807
1979
Pluris Hampstead Waste Water Treatment Facility
Affiliations: 39 Construction of 0.25 MGD Membrane Bio-Reactor Project
CAGC including the construction of a new common wall concrete
structure, odor control wet well structure, rotary drum
Years of Experience: screenings structure, wash water lift station, high rate infiltration
basin and piping, electrical/mechanical building structure, force
RELEVANT EXPERIENCE main installation, Installation of owner furnished membranes,
blowers, mixers and instrumentation.
McAlpine Creek WWMF Combined Heat and Power - Constructed Value: $3.7 Million
Improvements - Project duration was 11 months, completed in January 2016.
Construction included installation of a gas engine driven - Owner: Pluris Holdings LLC
generator, gas conditioning skid, Siloxane removal vessels, VFD - Contact: Maurice W. Gallarda, P.E. Tel: 314.220.3412
driven hot water loop pumps, glycol chiller, associated gas piping, - Engineer: Michael C. Gallant P.E.
miscellaneous hot water improvements and associated water - Contact: Michael C Gallant P.E. Tel: 910.448.1046
piping /valves.
- Constructed Value: $3.1 Million Manning Wastewater Treatment Plant Expansion, Manning, SC
- Project duration was 11 months, completed in March 2017 Construction of a new influent pump station, screenings/grit
- Owner: Charlotte Water structure, UV structure, Parshall flume, post aeration basin and
- Contact: Dane Beal Phone 704.634.8565 MCC building, lab building, installation of (4) four each 2600
- Engineer: CDM Smith gpm self-priming horizontal pumps with VFDs, piping, electrical
- Contact: Jon Lapsley, P.E. Phone 704.649.9511 equipment, generator, UV equipment, aeration equipment,
instrumentation, demolition, fencing, curbing and asphalt
driveways.
- Construction Value: $5.6 Million
- Project duration is twelve (12) months with an early scheduled
completion date of Dec. 2014.
- Owner: City of Manning, SC
- Contact: L. Rubin Hardy Tel: 803.435.8477
- Engineer: Hybrid Engineering, Inc.
- Contact: Douglas Clary Jr., P.E. Tel: 803.407.0472
www.SUContractors.com
Team Resume
Bill Cheek RELEVANT EXPERIENCE
Senior Project Engineer/ Neuse River WWTP Improvements, Raleigh, NC
Project Manger Scope of work included modifications and improvements to the
aeration system in Aeration Basins 1 to 6, Sludge Storage Tank
Bill Cheek graduated from the University of North Mixing System, replacement of the UV System, and modifications
Carolina at Charlotte in 1986 with a Bachelor’s to the channel aeration systems in the Primary Settling Tank and
degree in Civil Engineering Technology. He joined the ML/RAS/WAS Channels.
State Utility Contractors in 2000 and has 32 years of - Constructed Value: $15.7 Million
experience in Water Treatment Plant and - Project duration was 30 months, completed in June 2007.
Wastewater Treatment Plant Construction Field - Mr. Cheek was the Project Manager and handled shop drawings,
Engineering, Project Engineering, Estimating and construction schedules, and major equipment deliveries. He
Project Management. worked directly with the engineer and owner on day to day issues
and attended monthly progress meetings
Education - Owner: City of Raleigh, NC
North Carolina at Charlotte - Engineer: Hazen and Sawyer
Bachelor’s of science in Civil Engineering Technology 1986 - Contact: Bennie Meeks, P.E. - Phone - 919.833.7152
Years of Experience: 32 Goldsboro Water Treatment Plant Phase 1 Improvements,
Goldsboro, NC
City of New Bern, NC Water Treatment Plant Scope of work Scope of work included replacement of Media and Valves, and
included construction of a new 5.5 million gallon per day Pressure addition of Air Scour Backwash for existing Gravity Filters,
Filter Water Treatment Facility with 2 million gallon ground level Shotcrete Rehab and Flow Control of existing Sedimentation
prestressed concrete water storage tank and on site lined Basins and conversion of existing Plant from 2300 Volt to 480V
Backwash Holding Basins. Project also included piping and site Power.
work for 15 offsite Deep Wells as well as various piping - Constructed Value: $6.2 Million
modifications at the existing Water and Wastewater Treatment - Project duration was 18 months, scheduled to be completed in
Plants. August 2011.
- Constructed Value: $20.3 Million - Mr. Cheek was the Project Manager and handled shop drawings,
- Project duration was 18 months, completed in January 2010. construction schedules, and major equipment deliveries. He
- Mr. Cheek was the Project Manager and handled shop drawings, worked directly with the engineer and owner on day to day issues
construction schedules, and major equipment deliveries. He and attended monthly progress meetings
worked directly with the engineer and owner on day to day issues - Owner: City of Goldsboro, NC
and attended monthly progress meetings. - Engineer: Hazen and Sawyer
- Contact: David Briley, P.E. - Phone - 919.833.7152
- Owner: City of New Bern, NC
- Engineer: Rivers & Associates Surf City Water Treatment Plant, Surf City, NC
- Contact: Blaine Humphrey - Phone - 252.752.4135 Scope of work included new Pressure Filter Treatment Plant
complete with Offices and Chemical Feed equipment and Raw,
Backwash, Finished Water and Backwash Waste Storage and
Pumping Facilities.
- Constructed Value: $4.8 Million
-Project duration was 12 months, completed in May 2008.
-Mr. Cheek was the Project Manager and handled shop drawings,
construction schedules, and major equipment deliveries. He
worked directly with the engineer and owner on day to day issues
and attended monthly progress meetings.
- Owner: City of Surf City, NC
- Engineer: W.K. Dickson
- Contact: Joe Robinson, P.E. - Phone - 704.334.5348
www.SUContractors.com
Team Resume
Todd Wasson P.E.
Project Manager
RELEVANT EXPERIENCE
Todd graduated from Texas A & M University in 2006, with a Johnston County WTP Fourth Filter Addition
B.S. Degree in Civil Engineering. He obtained Professional Scope of work includes construction and installation of a
Engineering Registration in North Dakota in 2013, and in fourth filter addition Including a new chemical field system
North Carolina later that same year. For the first seven (7) and building associated with filter construction.
years, he worked for a couple of different engineering firms Smithfield, NC
as a Design Engineer, Construction Manager, and Project $5.2 Million
Manager. Project Manager
Owner: Johnston County Public Utilities
In October 2013, Todd joined State Utility Contractors, Inc. as Contact: Mike Keen p: 919795.1944
a Project Manager. He was first assigned to the Long Creek Engineer: McKim & Creed, Inc
Pump Station Flow Equalization project in Charlotte, NC, for Contact: Timothy G. Broome, P.E. p: 919.223.8091 ext. 1887
the Charlotte-Mecklenburg Utility Department. This was
followed by being the Project Manager for the $8.3 million First Broad River WWTP Upgrades Project
dollar First Broad River WWTP Upgrades Project. Todd is Scope of work included an upgrade and expansion of the
currently managing a $5.3 million filter addition project in existing WWTP by adding a third Aeration Basin, Gravity
Johnston County, NC. Todd is very thorough and always has Sludge Thickener and Associated Thickened Sludge Pump
in-depth knowledge and understanding of each job he Station building, Aeration Splitter Box, WAS Valve Vault and
manages. two RAS Meter Vaults. It also included modifications to the
Influent Screen, Blower building, Aerated Sludge Holding
Education Tank, two Aeration Basins, two Primary Clarifiers, two
Texas A&M University - 2006 Secondary Clarifiers, two RAS Pump Stations, a WAS Pump
B.S. Degree in Civil Engineering Station, Compost Drain Pump Station and Filtrate Equalization
Tanks.
Professional Engineering Registration License Shelby, NC
North Carolina, North Dakota $8.3 Million
Project Manager
Affiliations Owner: City of Shelby, Public Utilities Department
CAGC Contact: David Hux p: 704.669.6570
Engineer: HDR Engineering Inc.
Years of Experience: 12 Contact: Bob Rella, PE / 704.338.6713
Long Creek Pumping Station Flow Equalization Tank
Scope of work included the construction of a new 5 Million
Gallon Pre-stressed Composite Tank and associated piping,
valves, and miscellaneous structures to add additional
storage capacity for high flow events at the pump station.
Charlotte, NC
$2.8 Million
Project Manager
Owner: Charlotte Mecklenburg Utility Department
Contact: Julie McLelland, Senior Project Manager p:704.634.8562
Engineer: Pease Engineering & Architecture, PC
Contact: Maurice Walsh, PE p: 704.941.2128
www.SUContractors.com
Team Resume
Andrew Merri� RELEVANT EXPERIENCE
Project Manager Middle Tyger River Intake and Pump Station Project
(Construction Manager at Risk Project)
Andrew is a construction professional with over 10 years of Construction of a new Raw Water PS and Intake Screen to
professional experience and millions of dollars of successfully provide raw water from the Middle Tyger River to the new
managed Water and Wastewater Treatment projects. Andrew Membrane Facility. The project also consisted of concrete
is experienced in all aspects of the construction industry, this modifications to the existing dam, New Generator Set and
includes, but is not limited to, negotiations and development of associated electrical controls, SCADA System upgrades.
contracts, estimating, material procurement, subcontractor and Lyman, SC
supplier coordination, project scheduling, stake‐out/surveying, $5.5 Million
CAD, billing and payment procedures and value engineering. Project Manager
Owner: SJWD
Andrew began working in 2008 upon graduating with a degree Contact: Mike Frost / p: 864.415.1112
in Construction Management from Western Carolina University Engineer: Black & Veatch Corpora�on
as a Project Superintendent. He joined State U�lity Contractors, Contact: Clint Shealy, PE / p: 803.960.8145
Inc. in May 2014 as a Project Manager. From 2008 to the
present, Andrew has been successfully managing Water and Muddy Creek Wastewater Treatment Plant Upgrades
Wastewater construction projects ranging from new facilities Winston‐Salem, NC
to upgrades and expansions to existing facilities. Currently, Upgrade to an existing WWTP that included construction of a
Andrew is the Project Manager on a Construction Manager at new Secondary Clarifier, modifications to existing Secondary
Risk Project for the Middle Tyger River Intake and Pump Station Clarifier distributions, Clarifier modifications, RAS Pump Station
project for SJWD. Modifications, associated Site work, Demolition, Electrical,
HVAC and Architectural work.
Education: $12.1 Million
Western Carolina University Assistant Project Manager
Bachelors of Science in Construction Management Owner: City of Winston‐Salem
2008 Contact: Mr. Keith Jones, PE / p: 336.345.7277
Engineer: Hazen and Sawyer
Affiliations: Contact: Mr. Anthony Greiner, PE / 336.292.7490
CAGC Young Leaders
Western Carolina University Advisory Board Member Westside Wastewater Treatment Plant
Habitat for Humanity Upgrade and expansion to an existing WWTP to increase the
plant capacity of the plant, this included a new effluent sand
Years of Experience: 11 filter building, a new effluent pump station, berms for flood
control, demo of existing filter structures and other plant
modifications.
City of High Point, NC
$8.5 Million
Project Superintendent
Owner: City of High Point, NC
Engineer: Hazen and Sawyer
Contact: 919.833.7152
www.SUContractors.com
Team Resume
Scott McCall
Project Manager
Education:
University of North Carolina at Charlotte
Bachelors of Science in Civil Engineering
Technology 2011
Years of Experience: 5 RELEVANT EXPERIENCE
Scott McCall started as a Field Engineer with State Utility in Orangeburg WWTP, Orangeburg, SC
2012. He worked in the field installing new material and The project included construction of a new Aeration Basin,
equipment for the first 2.5 years of his career. He was moved Sludge Holding tank and associated masonry blower buildings
into the office the beginning of 2015 and worked as a Project for each housing high speed turbo blowers, 2 (two) new WRAS
Engineer on the Turbeville, SC WWTP Expansion. In the later pump stations, New grit chamber and modifications to the
part of 2015 he worked as a Project Manager on the Manning, existing primary pump station, influent screens, RAS pump
SC WWTP Phase 2 Expansion. Scott is experienced in all station and chlorine contact chambers. Project also included
aspects of the construction industry, this includes but is not new SCADA system and chlorine disinfection management
limited to, negotiations and development of contracts, system.
estimating, material procurement, subcontractor and supplier - Assistant Project Manger
coordination, project scheduling, surveying, Auto CAD, billing - Constructed Vale: $22Million
and payment procedures. - Project Duration was 24 months,
- Owner: City of Orangeburg
- Contact: Mr. Benji Brickle / 803.268.4521
- Engineer: AECOM - Columbia
- Contact: Nathan Ward, P.E. / 803.254.4400
RELEVANT EXPERIENCE Camden WWTP, Camden, SC
Scope of work included an upgrade and expansion to an
Manning Phase 2 WWTP Expansion existing WWTP to a new flow rate of 4.0 MGD. Construction
Scope of work included constructing a new Sequencing Batch included a new masonry Administration Building / Lab,
Reactor Basin which consisted of four 47 HP 12” Jet Motive Influent Headworks Facility 35 FT below grade, Fine Bubble &
Pumps, four 2.7 HP 3” WAS Pumps, three 150 HP Blowers, and Coarse Bubble Aeration Basin, (2) 80 ft. diameter Clarifiers,
all piping, automated valves and instrumentation for a proper Sludge Processing / Blower Building, Sludge Transfer Pumping
clarification process. Underground piping was installed in Station, Aqua Aerobic driven Sludge Holding / Digester Tank,
order to reroute the influent through the SBR Basin. Piping was Liquid Lime Facility, Maintenance Building, Influent Pump
also added to allow the City of Manning to control the Station Electrical Building, Effluent UV Facility, with 42” Dia.
direction of SBR effluent thorough either the existing Chlorine Effluent Diffuser installed below water level of the adjacent
Contact Chamber or the existing UV Structure. Pipe was also tributary.
installed from the new WAS pumps to the existing digesters - Field Engineer
along with a drain piping in order to drain any of the four cells - Constructed Vale: $30 Million
in the basin. - Project Duration was 25 months,
- Project Manager - Owner: City of Camden
- Constructed Vale: $6.7 Million - Contact: Mr. Kyle Smith / 803.572.1492
- Project Duration was 11 months, - Engineer: URS/B.P. Barber & Associates
- Owner: City of Manning , SC - Contact: Keith Cannon, P.E. / 803.254.4400
- Contact: Rubin Hardy / 803.934.6481
- Engineer: Hybrid Engineering, Inc. www.SUContractors.com
- Contact: Doug Clary/ 803.407.0472
Team Resume
Mike Nobles
Chief Estimator - Plant Division
Education: Mike is a construction professional with 37 years of experience in the construction
Southeast Missouri State University 1977
Business Administration/ Management industry. Mike joined State Utility Contractors in the summer of 1990 as a
Technology 2011 mechanical estimator. After a few years, Mike’s hard work paid off and he was
promoted to Chief Estimator for the plant division, where he has served for the
Years of Experience: 33 last 25 years. Mike’s responsibilities include complete construction bid
preparations including site investigations, quantity takeoffs, pricing, solicitation of
bids, project scheduling, evaluation of supplier and subcontractor bids, and the
writing of purchase orders and subcontracts for various wastewater and water
treatment projects. He also assists in project start-ups and the preparation of
budgets and project schedules. This includes ordering materials and expediting
their delivery, cost control, subcontractor relations and quality control.
David Lucas
Estimator - Plant Division
Education: David is a construction professional with 10 years of professional experience. David
Western Carolina University - 2006 joined State Utility Contractors, Inc. in 2007 upon graduating with a degree in
B.S. Degree in Construction Management Construction Management from Western Carolina University. From 2007 to present
David has been working as an estimator for the treatment plant construction
division in several different roles within the department. David has experience in
estimating within all construction divisions including architectural, heavy civil,
and process mechanical. David’s responsibilities include quantity take-offs, site
investigations, bid preparations, scheduling, purchasing, and submittals on projects
ranging up to $35 million.
Years of Experience: 12
Education: Brian Freeze
Catawba College - 1987
B.A. Degree in History and Sociology Estimator - Plant Division
Years of Experience: 28 Brian is a construction professional with 30 years of experience in the construction
industry. Brian’s career started when he took a summer job as a laborer for a
concrete forming subcontractor after graduating high school in 1987. After
graduating from Catawba College in 1991, Brian stayed on with the same company
and took a position as shop foreman. He transitioned into pre-construction and
estimating in 1994, and remained in that position for the next 19 years.
Brian joined the estimating team at State Utility Contractors, Inc. in October 2013.
His estimating responsibilities include concrete and reinforcing, architectural work,
metals, and coatings. He also assists in pre-construction planning of concrete
structures.
www.SUContractors.com
Pipeline Division
Team Resumes
Team Resume
Steve Brown RELEVANT EXPERIENCE
Executive Vice President 36”Water Transmission Line Project Division I and II
Pipeline Division Manager
Installation of 36,657 LF of New 36” DIP and 2150 LF of
Steve is a 1993 graduate of East Carolina University with a New 24” DIP Water Transmission Line including BFV’s,
B.S. Degree in Construction Management. Steve started connections, bore & jacking steel casing pipe, seeding,
with State Utility Contractors in August of 1993. Steve testing and complete restoration of disturbed areas.
started off by working in the Monroe office as an entry Kings Mountain, NC
level Estimator, while also assisting with various projects in $8.1 Million
the field. Steve also worked as an Assistant Superintendent Senior Project Manager
for 8 months in 1998 in Southport, NC. He was then Owner: Kings Mountain
assigned back to the Monroe office in 1999, working as an Contact: Dennis Wells p. 704.734.4525
Estimator and moving his way up to Chief Pipeline Engineer: Joel E. Wood & Associates, PLLC
Division Estimator. Since 2001, Steve has been working as Contact: Joel Wood, P.E p. 704.739.2565
a Senior Project Manager, managing projects as large as
$10 million dollars. In October 2016 Steve was promoted to Stewart Mill & Knox Rd. Area Outfall & Water System
the role of Pipeline Division Manager. He is now Imp
responsible for the overall estimating, scheduling, Installation of 6,570 LF of 24” to 36” DIP Gravity Sewer
purchasing, safety and management of the field outfall including guaranteed crossing of Interstate I-
operations for the Pipeline Division. The Pipeline Division 40/85 and installation of 8,540 LF of 12” DIP Water
averages over $25 million in yearly volume. In 2012, Steve Main along the shoulder of Knox Rd. Gravity sewer was
completed his Masters Degree in Construction installed in depths up to 22 VF deep.
Management from East Carolina University. Greensboro, NC
$3.9 Million
Senior Project Manager
Owner: City of Greensboro, NC
Contact: Robbie Bald, P.E p. 336.373.2055
Engineer: Stimmel Associates, PA
Contact: Neal Tucker, P.E p. 336.723.1067 Ext. 104
Education High Shoals Sewer Interconnect Contract 2.3
East Carolina University - 1993
Construction Management Installation of 15,900 LF 15” gravity sewer, depths of
pipe varied from 6 feet deep to over 20 feet deep, wet
East Carolina University - 2012 and rocky conditions. Also included was 2,900 LF 8”
Masters in Construction Management force main. All pipes were installed in easements and
right of ways with major gas lines crossing. The
North Carolina Utility License project included some large and long bore and jacks
underneath large hills, rivers and roadways. The
Affiliations project included dewatering as needed to install the
USGBC, CAGC, NCNUCA gravity sewer especially since there were some deep
Years of Experience: 25 depths. Gaston County, NC
$5.4 Million
Senior Project Manager
Owner: Gaston County, NC
Contact: Dan Ziehm p. 704.862.6795
Engineer: HDR Engineering
Contact: Matt Shultz, P.E p. 704.338.6700
www.SUContractors.com
Team Resume
Dustin Wagner, P.E. RELEVANT EXPERIENCE
Vice President
Pipeline Division Wilmington
Phase 1A Utility Improvements & Streetscapes
Dustin is a 1993 graduate of North Carolina State Replacement of 5,400 LF gravity sewer and 11,000 LF
University with a Degree in Civil Engineering Construction waterline and installation of 6,000 LF force main, 3,000
Option. Dustin started with State Utility Contractors in LF storm drainage, and demolition and repaving of
1993 after graduating, and worked as an Assistant 6,000 LF roadway. Streetscape of a main business area
Superintendent before progressing to Superintendent. As of Carolina Beach was completed along with addition of
Superintendent, Dustin was in charge of projects up to $4 a multipurpose trail.
Carolina Beach, NC
$8. Million
Senior Project Manager
Owner: Town of Carolina Beach
Contact: Gil Dubois p.910.458.0786
Engineer: Engineering Services, P.A.
Contact: Brian Cox, P.E p.910.662.7272
million in size. Dustin left our company in 2001 and Burnt Mill Creek Phase 2 Sewer Improvements
worked for two other companies as Pipeline Project Replacement of 2,300 LF of 48” gravity sewer pipe. Pipe
Manager and Pipeline Division Manager until 2004. He lining of 2,200 LF of 24”, 42” and 48” pipes with point
returned to State Utility Contractors in 2004, and is repairs. Replacement of manholes and manhole lining.
managing projects out of our Wilmington, NC Pipeline All work was installed adjacent to Burnt Mill Creek and
Division. He is currently managing multiple projects and within tidally influenced waters. All pipe was installed at
estimating. He obtained his NC Professional Engineer’s critical grade starting in an existing manhole and having
License in 1999, and also has his Contractor’s License for to lay the entire job on minimum grade with poor
water lines, sewer lines, and water and sewer treatment foundation material and having to conclude at an
plants, as well as his SC Blaster’s License. Dustin is a existing wet well. Bypass pumping was performed as
current member of PENC.
necessary to maintain sewer flow.
Education Wilmington, NC
North Carolina State University - 1993 $4.1 Million
Civil Engineering Senior Project Manager
Owner: Cape Fear Public Utility Authority
NC Professional Engineer 1999 Contact: Tige Brubaker p. 910.332.6560
NC Contractors License Engineer: CDM Smith
Contact: Michael Sloop, P.E p.919.787.5620
Affiliations Northeast Interceptor Rehabilitation Phase 2
PENC, CAGC 5,500 LF of 20” DI Pipe Bursting - Carolina’s AGC
Pinnacle Award winning project for Best Utility Project
Years of Experience: 21 Under 5 Million.
Wilmington, NC
$5 Million
Project Manager
Owner: Cape Fear Public Utility Authority
Contact: Craig Wilson p. 910.332.6560
Engineer: Kimley-Horn
Contact: Jeff Wing, P.E p. 919.653.2951
www.SUContractors.com
Team Resume
Mike Paluso RELEVANT EXPERIENCE
Project Manager Northeast Interceptor Rehabilitation Phase 2
5,500 LF of 20” DI Pipe Bursting - Carolina’s AGC
Mike started with our company in January of 2000, and Pinnacle Award winning project for Best Utility Project
has worked as a Project Manager overseeing multiple Under 5 Million.
projects and crews. Mike’s duties include scheduling, Wilmington, NC
purchasing, estimating, company safety, and day to day $5 Million
management of crews and projects. He spends much of Project Manager
his time on the project sites and has a tremendous Owner: Cape Fear Public Utility Authority
amount of field experience. Before starting with our Contact: Craig Wilson p. 910.332.6560
company, Mike had many years of experience in landfill Engineer: Kimley-Horn
construction where some of his duties included managing Contact: Jeff Wing, P.E p. 919.653.2951
and estimating of site grading, pump stations, gas
collection systems, leachate collection systems, and Arran Park/Arran Hills Area 11 South Annexation Sewer
landfill expansion and closures. Mike attended Penn State improvements including installation of 15,891 LF of 8”
University, majoring in Civil Engineering before going into PVC and DIP gravity sewer, 70 EA coated manholes,
the construction field of work. 244 service connections, 20,000 SY of asphalt patching,
and 901 LF of storm drain pipe. Pipe was installed
Education within a restricted work area, including a street R-O-W
Penn State University and outfall easements. Pipe was installed at depths
Civil Engineering ranging from 6’ to over 20’. All pipelines were installed
within a residential area. Dewatering was used as
Affiliations needed. Traffic control was used to maintain access to
CAGC all homes during construction. Fayetteville , NC
Years of Experience: 30 $3 Million
Project Manager
Owner: PWC of Fayetteville
Contact: Misty Manning p. 910.223.4370
Engineer: Moorman, Kizer & Reitzel
Contact: Jeff Reitzel, P.E p. 910.484.5191
Twelve Mile Creek Diversion Force Main
Install 15,100 LF of 18” Coated Ductile Iron force main
and 1.5 MGD Diversion Pump Station. Project also
included 560 LF of 30” steel casing installed by bore and
jack, 3 stream crossings, and relocation of endangered
sunflowers.
Union County, NC
$5.4 Million
Project Manager
Owner: Union County Public Works
Contact: Scott Huneycutt p. 704.2964210
Engineer: Di Con Consulting
Contact: Zak McClellan, P.E p. 980.202.2011
www.SUContractors.com
Team Resume RELEVANT EXPERIENCE
Dale Schmidt Unspecified Water and Sewer Repairs
Replacement or repair of both water and sewer lines, along
Project Manager with fire hydrants, valves, meters, and water & sewer services
within Mecklenburg County, NC as directed by CLT Water.
Dale graduated from the University of North Carolina at Water line repairs often required insert valves or line stops
Charlotte in 2008, with a Bachelor of Science Degree in and ranged from small 2” line leaks up to replacing several
Civil Engineering. Dale started with State Utility hundred feet of 36” PCCP. Fire Hydrant replacements
Contractors, Inc. in July of 2013 as a Line Division Project locations ranged from the center of Charlotte to
Manager. He has assisted with various projects in the neighborhood streets. Renewal or replacement of domestic
field, and has also received training in estimating. Dale meters up to 6” often required the installation of temporary
now manages multiple projects as large as $5 million. bypasses. Sewer point repairs varied in depth from minimum
Some of these include the Water Transmission Line cover up to 12’ deep and existing main line pipe material
Projects, Divisions I and II in Kings Mountain, NC, and the varied from DIP to PVC and VCP.
Nestle Waters North America Swift Springs Pipeline Charlotte, NC
Installation in McBee, SC. He is responsible for $2 Million
scheduling, purchasing, safety, and production on each of Project Manager
the projects that he manages. Owner:CLT Water
Contact: Andrew Brunnick p. 704.996.6717
Education Engineer: CLT Water
University of North Carolina Charlotte Contact: Andrew Brunnick p. 704.996.6717
Civil Engineering
Nestle Waters North America Swift Spring Source Pipeline,
Affiliations Transmission Pipeline (Hwy/Town)
CAGC Young Leaders, Factory Pipeline Installation/Bore & Jack
Habitat for Humanity Installation of 43,700 LF of 6” HDPE Pipe, two 12” bores (one
Years of Experience: 9 under CSX railroad, one under US Hwy 1), 4700 LF of 6” HDPE
by directional drilling, and 12 HDPE Manholes. All pipe was
laid on grade to allow water to flow from spring site to
factory with minimal pumping.
McBee , SC
$2.3 Million
Project Manager
Owner: Nestle Waters North America
Contact: Brent Clay, P.E p. 972.837.3913
Engineer: Dan Vos Construction Company
Contact: Joe, P.E p. 616.676.9169
Waterline Rehabilitation Project
Replacement of 31,020 LF of 12” through 8” water mains
including new services tie-ins, connections, and
abandonment/decommissioning of the old water system.
Work was all in existing streets, requiring traffic control and
maintaining access to all residences and businesses. Work
involved the use of restrained joint DIP, insert valves, and line
stops as needed.
Kings Mountain, NC
$4.5 Million
Project Manager
Owner: City of Kings Mountain, NC
Contact: Dennis Wells p. 704.472.1145
Engineer: Joel E. Wood P.E
Contact: Joel E. Wood, P.E p. 803.684.3390
www.SUContractors.com
Team Resume
Scott Little
Chief Estimator - Line Division
Education:
University of North Carolina at Charlotte 1999
B.S in Mechanical Engineering
Years of Experience: 21
Scott is a construction professional with 17 years of experience in the construction industry. Scott began working
with State Utility Contractors in 1997 on a part time basis while he was attending college. In 1999, after getting his
B. S. Degree in Mechanical Engineering from the University of North Carolina at Charlotte, he began working with
State Utility Contractors full time. He worked in the field during his part time work and started assisting with the
estimating team when he graduated. Scott has since had additional field experience working on a 48” water line
project for the City of Charlotte as an Assistant Superintendent. Since 2002, he has progressed in his duties to the
point that was promoted to Chief Estimator for the Pipeline Division. Scott’s duties include bidding and negotiating
proposed work, writing purchase orders and subcontracts, and preparing project cost budgets.
Justin Collins
Estimator/Assistant Project Manager - Line Division
Education:
University of North Carolina at Charlotte 2011
B.S in Construction Management
Years of Experience: 8
Justin is a construction professional with 6 years of experience in the construction industry. In 2011, he graduated
with a B.S Degree in Construction Management from the University of North Carolina at Charlotte and went to
work as an estimator for a general contractor out of Charlotte. Justin began working with State Utility Contractors
in 2013 as an estimator for the Line Division. Since coming to State Utility, he has gained valuable field
experience working as an assistant superintendent on a 36” transmission line project in Kings Mountain. He has
also been an acting assistant project manager on the twenty six mile Monroe Bypass project in Union
County. Justin’s responsibilities include bidding projects, preparing project cost budgets, writing purchase
orders, issuing subcontracts, and ordering materials on projects ranging up to $ 20 million. He also handles all of
the minority outreach for the Line Division.
www.SUContractors.com
Safety & Marketing
Team Resumes
Team Resume - Safety & Marketing
Chris Ricketson
Safety Manager
Education: Trainer/Instructor
Metropolitan State College - Scaffolding for Construction - Trainer
B.A in Anthropology - Behavior Based Safety - Trainer
- Red Cross CPR 1st Aid - Instructor
Years of Experience: 21 - OSHA - 30 Hour - Instructor
- NCCER Craft Instructor
Certifications
OSHA - 30 Hour, OSHA 500 & OSHA 502
NFPA70e and Electrical Training
Chris joined State Utility Contractors in June 2012. Chris has over 20 years construction industry experience with 15
years in Safety and HR management roles. Chris has worked with several of the nation’s top construction related
companies with multi state presence. Chris is responsible for the overall safety of State Utility Contractors' projects
in North and South Carolina. He is an OSHA outreach trainer, as well as a Red Cross certified instructor. Chris is also
responsible for making sure the projects are following all State Utility safety protocols. He is also instrumental in
maintaining proper safety documentation and development of safety policy.
Kris Hannah
Marketing and Recruiting Manager
Education:
Western Carolina University - 2007
B.S in Construction Management
Years of Experience: 11
Affiliations: Carolinas:
CAGC Young Leaders
Sigma Lambda Chi - International Construction Honor Fraternity
Kris is a construction professional with 6 years of experience in the construction industry and 4 years of Marketing
experience abroad. Kris began his journey with State Utility Contractors during the summers of 2006 and 2007 as an
intern working in the field on a concrete crew. Upon graduating from Western Carolina University in December 2007
with a B.S in Construction Management, Kris Joined State Utility Contractors full time as a Project Engineer. During
the next 3 years, Kris would help manage multiple multi-million dollar projects including Vacuum Pump Stations and
WWTP upgrades. In early 2011, Kris pursued other opportunities where he gained valuable experience in Marketing,
Graphic Design, Web Development and Sales. After a 3 year stint abroad, Kris rejoined State Utility’s subsidiary State
Building Group in 2014 as an assistant Project Manager/Marketing Manager and helped finish a $35 million new
muti-family project. After the completion of that project in 2015, Kris was promoted to Marketing and Recruiting
Manager for State Utility Contractors as a whole. Kris is now responsible for all Marketing and recruiting for State
Utility Contractors. This also includes our youth outreach program to educate them on careers in construction.
www.SUContractors.com
Plant Division
Experience
Completed Projects Water Treatment
Camden Wastewater Treatment Plant
Owner: City of Camden, SC Kershaw County
Kyle Smith
p: 803.425.6053
Engineer: URS - Columbia, SC
Keith Cannon, P.E.
p: 803.254.4400
Contract Value: $34 Million Contract VE Value: $30 Million
Contract Duration: 26 months Completion Date: August, 2014
Project Details: The project included construction of a new wastewater treatment plant, consisting of new
Influent Headworks / Screening & Grit removal facility, Fine & Coarse Bubble Aeration Basin; two (2) 80ft
diameter Clarifiers; UV Disinfection / Effluent Facility, Sludge Handling & Blower Facilities, Maintenance Facility
and state of the art Operations / Administration Building
www.SUContractors.com
Completed Projects Water Treatment
Hamby Creek Wastewater Treatment Plant
Owner: City of Thomasville, NC Davidson County
Morgan Huffman
p: 336.475.4210
Engineer: Pease Architects-Engineers
Keith Garbrick
p: 704.376.6423
Contract Value: $24.6 Million
Contract Duration: 38 months (Completed in 30 Months) Completion Date: July, 2008
Project Details: Construction of major improvements and expansion of existing wastewater treatment plant
from 3 million gallons per day (MGD) to 6 MGD. The project included approximately 10,000 cubic yards of cast
in place concrete and 1000 tons of reinforcing steel. Working in and around the existing treatment plant, the
project required extensive planning and coordination to construct the new facilities while keeping all existing
facilities on line. Startup required a seamless changeover of treatment trains from existing to new.
www.SUContractors.com
Completed Projects
Orangeburg Wastewater Treatment Plant
Owner: Department of Public Utilities, City of Orangeburg, SC.
Mr. Benji Brickle
p: 803.268.4521
Email: [email protected]
Engineer: AECOM -Columbia, SC
Nathan Ward, P.E.
p: 803.254.4400
Email: [email protected]
Contract Value: $22 Million Scheduled Comple�on Date: July, 2016
Contract Dura�on: 24 months Comple�on Date: July, 2016
Project Details: The project included construction of a new Aeration Basin, Sludge Holding tank and associated
masonry blower buildings for each housing high speed turbo blowers, two (2) new WRAS pump stations, New grit
chamber and modifications to the existing primary pump station, influent screens, RAS pump station and chlorine
contact chambers. Project also included new SCADA system and chlorine disinfection management system.
Project utilized equipment manufactured by Evoqua Technologies, APG Neuros High Speed Blowers, Seepex
Progressing Cavity Pumps, Parkson – Fine Screening, JMS Incline Conveyance, Smith Loveless Grit Removal &
Tencarva Pumps.
www.SUContractors.com