The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.

Statement of Work Proposed
For Gilbane Building Company
Site: 411 W. Chapel Hill Street
City: Durham, NC
Project: #8582

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by buddy, 2018-04-26 10:17:49

NC MUTAL LIFE

Statement of Work Proposed
For Gilbane Building Company
Site: 411 W. Chapel Hill Street
City: Durham, NC
Project: #8582

Keywords: Signage Upfit - NC MUTUAL LIFE ( DURHAM)

5800 McHines Place, Suite 110
Raleigh, NC 27616

*Pending Final Survey

Client:

Legacy Tower

411 West Chapel Hill Street
Durham, NC 27701

Filename:

Legacy Tower

Date:

08-17-17

Designer: CSS-HL

Drawing No:

17-229

Scale: As Noted

Revision 1: 07/01/13
Revision 2: 07/01/13
Revision 3: 07/01/13
Revision 4: 07/01/13
Revision 5: 07/01/13
Revision 6: 07/01/13

Client Approval:

Landlord Approval:

411 West Chapel Hill Street , Durham, NC 27701 PRELIMINARY SCOPE DETAIL PG. (1) of (3)



5800 McHines Place, Suite 110
Raleigh, NC 27616

Client:

Legacy Tower

411 West Chapel Hill Street
Durham, NC 27701

Filename:

Legacy Tower

Date:

08-17-17

Designer: CSS-HL

Drawing No:

17-229

Scale: As Noted

Revision 1: 07/01/13
Revision 2: 07/01/13
Revision 3: 07/01/13
Revision 4: 07/01/13
Revision 5: 07/01/13
Revision 6: 07/01/13

Client Approval:

Landlord Approval:

Scale: 1" = 2" Attachment Conceptual PG. (2) of (3)

411 West Chapel Hill Street , Durham, NC 27701

5800 McHines Place, Suite 110
Raleigh, NC 27616

Client:

Legacy Tower

411 West Chapel Hill Street
Durham, NC 27701

Filename:

Legacy Tower

Date:

08-17-17

Designer: CSS-HL

Drawing No:

17-229

Scale: As Noted

Revision 1: 07/01/13
Revision 2: 07/01/13
Revision 3: 07/01/13
Revision 4: 07/01/13
Revision 5: 07/01/13
Revision 6: 07/01/13

Existing Conditions - Street View Proposed With New Signage - Street View Client Approval:

411 West Chapel Hill Street , Durham, NC 27701 Landlord Approval:

Attachment Conceptual PG. (3) of (3)

Proposal Submitted By: Services Performed For:
Capital Sign Solutions Gilebane Building Company
5800 McHines Place I Suite 110
302 East Pettigrew Street I Suite 300
Raleigh, North Carolina 27616 Durham, NC I 27701

Site: NC Mutual Life Date: August 30th, 2017
411 W. Chapel Hill St. Project: Legacy Towers
SOW#8582
N Durham, NC 27701
Our Process: We believe in showing you how we do it rather than telling you how we do it.

This method requires a little more client interaction than normal. Most signage owners in the industry are the type
that don't want clients peering over their shoulders; as if there is a secret trade ingredient. We encourage clients to
not only peek behind the curtain; but get in there and pull some levers with us. We know the best results come
from open collaboration and look forward to the next steps.

Our Principal: We value the function of providing a service that the client knows is ethical and fair.

Above all else, we will earn your trust and provide excellence as a trusted leader in the sign industry.
Trusted Client Generators equipped with integrity for sign brand identification. Achievements with clients all earned
by ethical practice. Thousands of Successful projects have rolled out within budget and schedule on time; All simply
by competent knowledge. We are trusted leaders and sons to the sign industry dedicated by passionate
commitment to our clients in past, present and future.

4- •••••••B•• enS2WWCEFEPeiu/txronfheea3ccmiaecitcrbcsnsdtpempaiecscstoleliiisaifatooicenltilfiPnevnlaiyniataedlthVirlsSzettteiCtehaonsxauieCpaeibbSnsctSprllutueeSibrosncotiomTscgigaoieetngcehwnaenhrimdnfitudStishnoetehtugarvCapvrlevableeialcepyootebiipopOtoualvmnweseli,ennarStnnieeh1gtsdr2enssphsyeSlapaeinonpenavldcusrairsitctatoircoolouniofznamsuedtlslsneemotnidnauutibc,rsraieatlctin-lbteiiydmeednftaeoSthgasiregirennncvgeoIendprrpdryooouanjrsecatetcrtiyvetosenE.froxyFwpoapetceprirlodirietijoneyntcc&te,.Ghreoreuinnd. signage.
Our Team Capital Sign Solutions is comprised of over 30 dedicated individuals committed to delivering excellence
0 every day. Our team of designers, installment professionals, project managers and facility specialists work
collectively to create signature decor, POS displays and brand identification signage that customers won't forget.
+c- Our senior leadership team is involved, ensuring every CSS customer receives the personal attention from at least
one of these individuals. Our Senior team has combined 99 years of experience in Logo Enhancement Programs for
Q) QSR, Banking and Retail Commercial Assets.

E CSS_____eto�-o�s_aloLSMe�- -

+Q-) capital Sign Solutions has a team of Installation Speacilist who Pledge while @ LEGACY TOWERS They,
-shall have all work permits in place prior to staging, installation or arrival of any equipment.
+0- -shall provide a barricade around the work area prior to ANY working beginning on-site.
-shall remove any obstructions from any overhead or designated areas identify in protection of work area
(/) -shall be mindful that building is open and will provide logistics for efficient crane and delivery of signage materials
-shall have all roof top equipment and scaffold so its designed and constructed to meet OSHA 29 CFR Part 1926 Subpart L.
-shall secure tools when not in use to ensure that they will not fall off the roof.
-shall manage our Debris by providing a collection box that will be placed in a dedicated and safe area to all.

Capital Sign Solutions Safety Assurance Promise to Gilebane that All Our Workers @ Legacy Towers,
-We Understand the requirements of OSHA's Fall Protection standards at 29 CFR 1926, Subpart M
-We the Employer, will protect the public and our workers exposed to falls six feet or more above a lower level.
-We Will Implement safe work practices to reduce the possibility of falls.
-We Will Supervise workers to ensure fall protection equipment is used and maintained correctly.
-WE Will Lead by example by Designating a project managers, and supervisors should follow the rules they are responsible for enforcing.
-We Will "PROVIDE" the right equipment needed for fall protection and for the job, including the right kinds of ladders, scaffolds, and safety gear.
-We Will Provide an On-Site Safety Compliance officer during all work times and shall provide documented saftey inspection reports.
-We Will designate a competent person to train workers who erect, disassemble, move, repair, maintain, operate, or inspect scaffolds
-We Will Stop meet with all our workers prior to work start to recognize any hazards associated with the cranes, tools and the scaffold systems

www.capitalsignsolutions.com PG. (1) of (6) Quote 8582 - Legacy Tower Building Signage


Click to View FlipBook Version