MAKLUMAT ASAS PROJEK MINI ESTET KAMPUNG PELAM TAHUN 2024 Ha Pokok Ha Pokok i Pokok Matang, 20 Tahun + 0 - 0 - i i Pokok Matang, 10 - 20 Tahun 163.74 22,873 163.74 22,873 iii Pokok Pra-Matang, 3 - 10 Tahun 12.5 686 12.5 686 Jumlah Pokok Matang 176.24 23,559 176.24 23,559 i v Pokok Muda Tahun 3 0 - 0 - Tahun 2 0 - 0 0 Tahun 1 0 - 0 - Dalam Persediaan 0 - 0 - Jumlah Pokok Muda 0 - 0.00 - Jumlah Kawasan Tanaman 176.24 23,559 176.24 23,559 Lain-lain Pejabat 4.0 4.0 Tanaman lain 0.0 0.0 Jalan dan laman 8.0 8.0 Kawasan Paya 5.9 5.9 Rezab boleh ditanam 0.0 0.0 Rezab alam sekitar/Tanah Rezab 0.0 0.0 JUMLAH KESELURUHAN KAWASAN 194.17 23,559 194.17 23,559 2 PEKERJA EKSEKUTIF Now Changes i Pengurus Ladang 1 i i Penolong Pengurus Ladang 0 iii Penolong Akaun i v Penolong Admin v Supervisor 1 3 PEKERJA LADANG L P L P Kontrak Jumlah i Harvesters & Carriers 0 0 7 7 i i Loaders 1 0 0 0 0 1 iii Field Workers 7 0 0 0 0 7 i v Drivers 2 0 0 0 0 2 1 KAWASAN TANAMAN Lepas Semasa Catatan Catatan
PENCAPAIAN PROJEK MINI ESTET KAMPUNG PELAM SEHINGGA 30 APRIL 2024 KASAR BERSIH JANUARI 173.58 190.00 167.03 167.03 87.91 FEBRUARI 159.90 180.00 120.30 120.30 66.83 MAC 158.04 180.00 167.03 167.03 92.79 APRIL 116.88 170.00 234.17 234.17 137.75 MEI 219.44 250.00 - JUN 122.63 250.00 - JULAI 196.17 250.00 - OGOS 237.44 270.00 - SEPTEMBER 237.14 280.00 - OKTOBER 217.28 320.00 - NOVEMBER 117.57 370.00 - DISEMBER 144.75 314.00 - JUMLAH 2,100.82 3,024.00 688.53 688.53 22.77 Nota a. Pendapatan BTS sehingga 30 April 2024 RM553,934.78 b. Kadar purata harga BTS RM804.52 c. Levi Kastam d. Pengeluaran BTS (Tan) 688.53 e. Kadar pengeluaran sehektar(tan) 4.26 f. Sasaran pengeluaran BTS 2024 (Tan/hektar) 18.00 g. Peratus pencapaian sekarang 23.67 BULAN PENCAPAIAN 2023 SASARAN 2024 PENCAPAIAN 2024 % PENCAPAIAN
PENYATA UNTUNG RUGI PROJEK MINI ESTET KELAPA SAWIT KG. PELAM BERAKHIR SEHINGGA 30 APRIL 2024 Bil Perkara Bulan ini Terkumpul Purata / Ha A. PENDAPATAN Hasil (mt) 234.17 688.53 4.26 Jualan BTS 206,378.80 553,934.78 3,427.39 Perkhidmatan Penuaian 0.00 0.00 Pendapatan Lain-Lain 1,925.00 1925.00 Perkhidmatan Pengangkutan 0.00 0.00 208,303.80 555,859.78 3,427.39 B. PERBELANJAAN Belanja Operasi ladang 32,672.00 269,267.90 1,666.16 Belanja Tuaian 17,300.22 53,512.43 331.12 Perbelanjaan Am 22,230.18 82,399.84 509.87 72,202.40 405,180.17 2,507.15 C. KEUNTUNGAN / (KERUGIAN) 136,101.40 150,679.61 932.37 Jumlah Pendapatan Jumlah Perbelanjaan
PROJEK TANAMAN KELAPA SAWIT DURIAN MENTANGAU
MAKLUMAT ASAS PROJEK KELAPA SAWIT DURIAN MENTANGAU TAHUN 2024 Ha Pokok Ha Pokok i Pokok Matang, 20 Tahun + 0 - 0 - ii Pokok Matang, 10 - 20 Tahun 16.73 2,276 16.73 2,276 iii Pokok Pra-Matang, 3 - 10 Tahun 4.6 626 44.6 6,146 Jumlah Pokok Matang 21.33 2,902 61.33 8,422 iv Pokok Muda Tahun 3 0 - 0 - Tahun 2 0 - 0 0 Tahun 1 0 - 0 - Dalam Persediaan 0 - 5 690 Jumlah Pokok Muda 0 - 5 690 Jumlah Kawasan Tanaman 21.33 2,902 66.33 9,112 Lain-lain Nursery 0.0 0.00 Tanaman lain 8.0 8.00 Jalan dan laman 6.4 6.40 Kawasan Paya 14.8 19.37 Rezab boleh ditanam 0.0 0.00 Rezab alam sekitar/Tanah Rezab 0.0 0.00 JUMLAH KESELURUHAN KAWASAN 100.10 2,902 100.10 9,112 2 PEKERJA EKSEKUTIF Now Changes i Pengurus Ladang 1 ii Penolong Pengurus Ladang 1 iii Penolong Akaun 0 iv Penolong Admin 0 v Supervisor 1 3 PEKERJA LADANG L P L P Kontrak Jumlah i Harvesters & Carriers 0 0 0 0 2 2 ii Loaders 0 0 0 0 0 0 iii Field Workers 5 2 0 0 0 7 iv Drivers 0 0 0 0 0 0 1 KAWASAN TANAMAN Lepas Semasa Catatan Catatan
PENCAPAIAN PROJEK KELAPA SAWIT DURIAN MENTANGAU SEHINGGA 30 APRIL 2024 PENCAPAIAN SASARAN 2023 2024 KASAR BERSIH (m/tan) (m/tan) (m/tan) (m/tan) JANUARI 40.84 50.00 46.02 46.02 92.04 FEBRUARI 30.55 50.00 33.93 33.93 67.86 MAC 36.17 60.00 46.20 46.20 77.00 APRIL 28.40 60.00 55.72 55.72 92.87 MEI 54.98 70.00 - JUN 65.10 70.00 - JULAI 69.27 90.00 - OGOS 72.07 100.00 - SEPTEMBER 90.65 120.00 - OKTOBER 62.45 90.00 - NOVEMBER 64.56 90.00 - DISEMBER 50.48 70.00 - JUMLAH 665.52 920.00 181.87 181.87 19.77 Pendapatan BTS sehingga 30 April 2024 RM161,021.10 Kadar purata harga BTS RM885.36 Levi Kastam - Pengeluaran BTS (tan) 181.87 Kadar pengeluaran sehektar (tan) 3.61 Sasaran pengeluaran BTS 2024 (YPH - tan) 18.00 Peratus pencapaian sekarang 20.08% PENCAPAIAN 2023 % PENCAPAIAN BULAN/
PENYATA UNTUNG RUGI PROJEK KELAPA SAWIT DURIAN MENTANGAU BERAKHIR 30 APRIL 2024 Bil Perkara Bulan ini (Tan) Terkumpul (RM) Purata / Ha A. PENDAPATAN Hasil (mt) 55.72 181.87 3.61 Nilai (RM) 47,420.93 161,021.10 885.36 Jumlah Pendapatan 47,420.93 161,021.10 885.36 B. PERBELANJAAN i. Belanja Operasi 32,721.73 156,631.85 7,268.30 ii. Belanja Tuaian 6,190.75 15,032.10 697.55 iii. Belanja pentadbiran 14,003.85 50,708.14 2,353.05 Jumlah Perbelanjaan 52,916.33 222,372.09 1,783.43 C. KEUNTUNGAN / (KERUGIAN) -5,495.40 -61,350.99 (2,024.12)
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT DURIAN MENTANGAU (KAWASAN CADANGAN PEMBERSIHAN – 4 Ekar)
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT DURIAN MENTANGAU (KEROSAKAN JALAN LADANG)
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT DURIAN MENTANGAU (PPENYELENGGARAAN PARIT SEMPADAN)
PROJEK TANAMAN KELAPA SAWIT KAMPUNG IPOH
MAKLUMAT ASAS PROJEK TANAMAN KELAPA SAWIT KAMPUNG IPOH Ha Pokok Ha Pokok i Pokok Matang, 20 Tahun + 0.00 0.00 0.00 0.00 i i Pokok Matang, 10 - 20 Tahun 3.24 447 2.56 346 iii Pokok Pra-Matang, 3 - 10 Tahun 5.1 704 5.2 702 Jumlah Pokok Matang 8.34 1,151 7.76 1,048 i v Pokok Muda Tahun 3 0 0.00 0.00 0.00 Tahun 2 0 0.00 0.00 0.00 Tahun 1 0 0.00 0.00 0.00 Dalam Persediaan 0 0.00 0.00 0.00 Jumlah Pokok Muda 0 0.00 0.00 0.00 Jumlah Kawasan Tanaman 8.34 1,151 7.76 1,048 Lain-lain Nursery 0.00 0.00 0.00 0.00 Tanaman lain 0.00 0.00 0.00 0.00 Jalan dan laman 1.18 0.00 0.50 0.00 Kawasan Paya 0.00 0.00 0.26 0.00 Rezab boleh ditanam 0.00 0.00 0.00 0.00 Rezab alam sekitar/Tanah Rezab 0.00 0.00 1.00 0.00 JUMLAH KESELURUHAN KAWASAN 9.52 1,151 9.52 1,048 2 PEKERJA EKSEKUTIF Now Changes i Pengurus Ladang 1 i i Penolong Pengurus Ladang 1 iii Penolong Akaun i v Penolong Admin v Supervisor 1 3 PEKERJA LADANG L P L P Kontrak Jumlah i Harvesters & Carriers 0 0 4 4 i i Loaders iii Field Workers i v Drivers 1 KAWASAN TANAMAN Lepas Semasa Catatan Catatan
PENCAPAIAN PROJEK KELAPA SAWIT KAMPUNG IPOH SEHINGGA 30 APRIL 2024 KASAR BERSIH JANUARI 2.78 5.00 3.72 3.72 74.40 FEBRUARI 1.30 5.00 4.40 4.40 88.00 MAC 3.10 6.00 5.60 5.60 93.33 APRIL 4.14 8.00 8.70 8.70 108.75 MEI 3.70 8.00 - JUN 2.12 10.00 - JULAI 2.40 12.00 - OGOS 4.59 16.00 - SEPTEMBER 10.76 18.00 - OKTOBER - 15.00 - NOVEMBER 12.36 15.00 - DISEMBER - 12.00 - JUMLAH 47.25 118.00 22.42 22.42 19.00 a. Pendapatan BTS sehingga 30 April 2024 (RM) RM15,247.00 b. Kadar purata harga BTS (RM) 680.06 c. Levi Kastam - d. Pengeluaran BTS (Tan) 22.42 e. Kadar pengeluaran sehektar (Tan) 3.45 f. Sasaran pengeluaran BTS 2024 (tan/ha) 18.00 g. Peratus pencapaian sekarang 19.19 BULAN PENCAPAIAN 2023 SASARAN 2024 PENCAPAIAN 2024 % PENCAPAIAN
PENYATA UNTUNG RUGI PROJEK KELAPA SAWIT KAMPUNG IPOH SEHINGGA 30 APRIL 2024 Bil Perkara Bulan ini Terkumpul Purata / Ha A. PENDAPATAN Hasil (mt) 8.70 22.42 3.74 Jualan BTS 6063.00 15,247.00 1,588.23 Jumlah Pendapatan 6,063.00 15,247.00 1,588.23 B. PERBELANJAAN i Belanja Penyelenggaraan Ladang 105.00 105.00 10.94 ii Belanja Tuaian 0.00 531.60 55.38 iv Belanja pentadbiran 974.50 5,173.72 538.93 Jumlah Perbelanjaan 1,079.50 5,810.32 599.62 C. KEUNTUNGAN / (KERUGIAN) 4,983.50 9,436.68 973.86
PROJEK TANAMAN KELAPA SAWIT INTEGRASI LADANG ANTING
MAKLUMAT ASAS PROJEK KELAPA SAWIT LADANG ANTING Ha Pokok Ha Pokok i Pokok Matang, 20 Tahun + 0 - 0 - i i Pokok Matang, 10 - 20 Tahun 0 0 iii Pokok Pra-Matang, 3 - 10 Tahun 117.52 16,414 117.52 16,414 Jumlah Pokok Matang 117.52 16,414 117.52 16,414 i v Pokok Muda Tahun 3 68.98 9,637 68.98 9,637 Tahun 2 0 - 0 0 Tahun 1 0 - 0 - Dalam Persediaan 214 28,897 214 28,897 Jumlah Pokok Muda 282.98 38,534 282.98 38,534 Jumlah Kawasan Tanaman 400.50 54,948 400.50 54,948 Lain-lain Nursery 0.0 0.00 Tanaman lain 0.0 0.00 Jalan dan laman 5.0 5.00 Kawasan Paya 0.0 0.00 Rezab boleh ditanam 0.0 0.00 Rezab alam sekitar/Tanah Rezab 0.0 0.00 JUMLAH KESELURUHAN KAWASAN 405.50 54,948 405.50 54,948 2 PEKERJA EKSEKUTIF Now Changes i Pengurus Ladang 1 i i Penolong Pengurus Ladang 1 iii Penolong Akaun i v Penolong Admin v Supervisor 1 3 PEKERJA LADANG L P L P Kontrak Jumlah i Harvesters & Carriers 0 0 5 5 i i Loaders 1 1 iii Field Workers 9 9 i v Drivers 1 1 Catatan 1 KAWASAN TANAMAN Lepas Semasa Catatan
PELAN LADANG ANTING
MAKLUMAT KELUASAN LADANG DAN TANAMAN PROJEK LADANG KELAPA SAWIT ANTING 4 TAHUN 5 TAHUN 6 TAHUN Blok 1 54.50 7,903.00 1,865.00 1,202.00 1,162.00 4,229.00 3,318.00 7,547.00 200.00 7,347.00 556.00 880 300 pokok rosak (lembu) Blok 2 22.43 3,252.00 250.00 250.00 0.00 500.00 2,196.00 2,696.00 15.00 2,681.00 571.00 700 380 pokok rosak serangan gajah Blok 3 24.70 3,582.00 100.00 100.00 0.00 200.00 223.00 423.00 0.00 423.00 3,159.00 160 76 pokok rosak (Lembu) Blok 4 22.10 3,205.00 0.00 150.00 0.00 150.00 160.00 310.00 0.00 310.00 2,895.00 0 Blok 5 11.00 1,595.00 1,595.00 0.00 0.00 0.00 1,595.00 1,595.00 0.00 1,595.00 0.00 0 Blok 6 19.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260 Blok 7 4.40 638.00 638.00 0.00 0.00 0.00 638.00 638.00 36.00 602.00 36.00 0 Blok 8 32.50 4,713.00 0.00 1,480.00 933.00 2,413.00 1,719.00 4,132.00 33.00 4,099.00 614.00 0 Blok 9 11.60 1,682.00 236.00 0.00 0.00 0.00 236.00 236.00 0.00 236.00 1,446.00 300 298 pokok serangan khinzir/lembu Blok 10 15.50 2,248.00 0.00 1,000.00 800.00 1,800.00 0.00 1,800.00 0.00 1,800.00 448.00 0 Blok 11 12.70 1,842.00 0.00 950.00 0.00 950.00 0.00 950.00 0.00 950.00 892.00 0 Blok 12 18.00 2,610.00 0.00 1,000.00 350.00 1,350.00 0.00 1,350.00 0.00 1,350.00 1,260.00 0 Blok 13 34.60 5,017.00 0.00 2,200.00 0.00 2,200.00 0.00 2,200.00 0.00 2,200.00 2,817.00 0 Blok 14 14.80 2,146.00 0.00 0.00 450.00 450.00 0.00 450.00 0.00 450.00 1,696.00 0 Blok 15 20.50 2,972.00 0.00 0.00 450.00 450.00 348.00 798.00 0.00 798.00 2,174.00 0 Blok 16 52.00 8,792.00 0.00 855.00 2,200.00 3,055.00 0.00 3,055.00 0.00 3,055.00 5,737.00 0 Blok 17 21.50 3,117.00 0.00 450.00 0.00 450.00 0.00 450.00 0.00 450.00 2,667.00 0 Blok 18 13.30 1,929.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,929.00 0 405.33 57,243.00 4,684.00 9,637.00 6,345.00 18,197.00 10,433.00 28,630.00 284.00 28,346.00 28,897.00 2,300.00 CATATAN USIA POKOK JUMLAH POKOK BLOK LUAS (ha) KAPASITI TANAMAN TELAH SULAM JUMLAH POKOK ROSAK JUMLAH POKOK SELESAI SULAM 2023 JUMLAH PERLU SULAM
MAKLUMAT PEMBERSIHAN KAWASAN PROJEK LADANG KELAPA SAWIT ANTING FASA I PENCAPAIAN SASARAN KERJA PEMBERSIHAN DAN PEMBANGUNAN SEMULA LADANG TAHUN 2023 (FASA I) 4 TAHUN 5 TAHUN 6 TAHUN Blok 1 54.50 7,903 1,865 1,202 1,162 4,229 3,318 7,547 200 7,347 556 Telah Mencapai 100% Blok 2 22.43 3,252 250 250 - 500 2,196 2,696 15 2,681 571 Dalam kerja pembersihan 50% Blok 5 11.00 1,595 1,595 - - - 1,595 1,595 - 1,595 - Telah Mencapai 100% Blok 7 4.40 638 638 - - - 638 638 36 602 36 Telah Mencapai 100% Blok 8 32.50 4,713 - 1,480 933 2,413 1,719 4,132 33 4,099 614 Telah Mencapai 100 % Blok 10 15.50 2,248 - 1,000 800 1,800 - 1,800 - 1,800 448 Telah Mencapai 100% Blok 11 12.70 1,842 - 950 - 950 - 950 - 950 892 Telah Mencapai 100% Blok 12 18.00 2,610 - 1,000 350 1,350 - 1,350 - 1,350 1,260 Telah Mencapai 100% Blok 13 34.60 5,017 - 2,200 - 2,200 - 2,200 - 2,200 2,817 Telah Mencapai 100% 205.63 29,818 4,348 8,082 3,245 13,442 9,466 22,908 284 22,624 7,194 BLOK LUAS (ha) KAPASITI TANAMAN USIA POKOK JUMLAH POKOK JUMLAH PERLU SULAM CATATAN TELAH SULAM JUMLAH POKOK ROSAK JUMLAH POKOK
MAKLUMAT PEMBERSIHAN KAWASAN PROJEK LADANG KELAPA SAWIT ANTING FASA II 3 TAHUN 4 TAHUN 5 TAHUN Blok 3 24.70 3,582 100 100 - 200 223 423 - 423 3,159 Dalam kerja pembersihan 8% Blok 4 22.10 3,205 - 150 - 150 160 310 - 310 2,895 Penilaian Semula Pembangunan Blok 6 19.20 - - - - - - - - - Dicadangkan tidak dibangunkan Blok 9 11.60 1,682 236 - - - 236 236 - 236 1,446 Telah Dibersihkan (99%) Blok 14 14.80 2,146 - - 450 450 - 450 - 450 1,696 Penilaian Semula Pembangunan Blok 15 20.50 2,972 - - 450 450 348 798 - 798 2,174 Penilaian Semula Pembangunan Blok 16 52.00 8,792 - 855 2,200 3,055 - 3,055 - 3,055 5,737 Penilaian Semula Pembangunan Blok 17 21.50 3,117 - 450 - 450 - 450 - 450 2,667 Penilaian Semula Pembangunan Blok 18 13.30 1,929 - - - - - - - - 1,929 Dicadangkan tidak dibangunkan 199.70 27,425 336 1,555 3,100 4,755 967 5,722 - 5,722 21,703 JUMLAH POKOK ROSAK JUMLAH POKOK JUMLAH PERLU BLOK CATATAN LUAS (ha) KAPASITI TANAMAN USIA POKOK JUMLAH POKOK TELAH SULAM
MAKLUMAT KERJA SULAMAN ANAK SAWIT PROJEK LADANG KELAPA SAWIT ANTING BLOK LUAS (ha) KAPASITI TANAMAN USIA POKOK JUMLAH POKOK TELAH SULAM JUMLAH POKOK ROSAK JUMLAH POKOK JUMLAH PERLU SULAM SELESAI SULAM 2023 3 TAHUN 4 TAHUN 5 TAHUN Blok 1 54.50 7,903.00 1,865.00 1,202.00 1,162.00 4,229.00 3,318.00 7,547.00 200.00 7,347.00 556.00 880.00 Blok 2 22.43 3,252.00 250.00 250.00 0.00 500.00 2,196.00 2,696.00 15.00 2,681.00 571.00 700.00 Blok 3 24.70 3,582.00 100.00 100.00 0.00 200.00 223.00 423.00 0.00 423.00 3,159.00 160.00 Blok 4 22.10 3,205.00 0.00 150.00 0.00 150.00 160.00 310.00 0.00 310.00 2,895.00 0.00 Blok 5 11.00 1,595.00 1,595.00 0.00 0.00 0.00 1,595.00 1,595.00 0.00 1,595.00 0.00 0.00 Blok 6 19.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 260.00 Blok 7 4.40 638.00 638.00 0.00 0.00 0.00 638.00 638.00 36.00 602.00 36.00 0.00 Blok 8 32.50 4,713.00 0.00 1,480.00 933.00 2,413.00 1,719.00 4,132.00 33.00 4,099.00 614.00 0.00 Blok 9 11.60 1,682.00 236.00 0.00 0.00 0.00 236.00 236.00 0.00 236.00 1,446.00 0.00 Blok 10 15.50 2,248.00 0.00 1,000.00 800.00 1,800.00 0.00 1,800.00 0.00 1,800.00 448.00 0.00 Blok 11 12.70 1,842.00 0.00 950.00 0.00 950.00 0.00 950.00 0.00 950.00 892.00 0.00 Blok 12 18.00 2,610.00 0.00 1,000.00 350.00 1,350.00 0.00 1,350.00 0.00 1,350.00 1,260.00 0.00 Blok 13 34.60 5,017.00 0.00 2,200.00 0.00 2,200.00 0.00 2,200.00 0.00 2,200.00 2,817.00 0.00 Blok 14 14.80 2,146.00 0.00 0.00 450.00 450.00 0.00 450.00 0.00 450.00 1,696.00 0.00 Blok 15 20.50 2,972.00 0.00 0.00 450.00 450.00 348.00 798.00 0.00 798.00 2,174.00 0.00 Blok 16 52.00 8,792.00 0.00 855.00 2,200.00 3,055.00 0.00 3,055.00 0.00 3,055.00 5,737.00 0.00 Blok 17 21.50 3,117.00 0.00 450.00 0.00 450.00 0.00 450.00 0.00 450.00 2,667.00 0.00 Blok 18 13.30 1,929.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,929.00 0.00 405.33 57,243.00 4,684.00 9,637.00 6,345.00 18,197.00 10,433.00 28,630.00 284.00 28,346.00 28,897.00 2,000.00
PRESTASI PENDAPATAN DAN PERBELANJAAN PROJEK LADANG KELAPA SAWIT INTEGRASI ANTING BIL PERKARA TAHUN 2024 TAHUN 2023 TAHUN 2022 JUMLAH TERKUMPUL A. PENDAPATAN 1 Jualan BTS 132,968.31 295,619.16 350,712.00 646,331.16 JUMLAH PENDAPATAN 132,968.31 295,619.16 350,712.00 646,331.16 B . PERBELANJAAN 1 Gaji 42,922.20 156,315.53 286,822.79 443,138.32 2 Upah 35,123.30 79,708.63 0.00 79,708.63 3 KWSP 8,614.00 39,825.70 0.00 39,825.70 4 PERKESO 1,064.80 3,692.36 0.00 3,692.36 5 Bayaran Pinjaman AGROBANK - 250,000.00 304,000.00 554,000.00 6 Kejenteraan Ladang 96,224.15 284,117.81 496,384.76 780,502.57 7 Belian Input 6,640.20 527,212.05 520,295.80 1,047,507.85 8 Peralatan Ladang 2,144.15 32,936.39 61,780.85 94,717.24 9 Pembaikian Kenderaan Ladang 2,908.52 70,366.64 82,257.34 152,623.98 10 Pejabat Ladang 200.00 7,930.85 0.00 7,930.85 11 Belanja Mesyuarat - 4,703.40 2,881.85 7,585.25 12 Belanja Keraian 290.00 2,808.65 1,926.85 4,735.50 13 Agen Pelawat - 0.00 2,500.00 2,500.00 14 Tuntutan Perjalanan - 0.00 198.00 198.00 15 Sumbangan Pekerja 260.00 240.00 2,300.00 2,540.00 16 Rawatan Pekerja 102.00 376.15 172.00 548.15 17 Lesen - 100.00 100.00 200.00 18 Belanja Pengurusan 1,776.05 1,509.00 300.00 1,809.00 19 Pekerja Asing 3,014.00 2,553.00 0.00 2,553.00 JUMLAH BELANJA 201,283.37 1,464,396.16 1,761,920.24 3,427,599.77 C . KERUGIAN PROJEK -68,315.06 -1,168,777.00 -1,411,208.24 -2,579,985.24
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT INTEGRASI ANTING
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT INTEGRASI ANTING
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT INTEGRASI ANTING
GAMBAR TERKINI PELAKSANAAN PROJEK TANAMAN KELAPA SAWIT INTEGRASI ANTING
SERANGAN GAJAH LIAR PADA 18 JANUARI 2024 PROJEK KELAPA SAWIT INTEGRASI LADANG ANTING
SERANGAN GAJAH LIAR PADA 18 JANUARI 2024 PROJEK KELAPA SAWIT INTEGRASI LADANG ANTING
SERANGAN GAJAH LIAR PADA 18 JANUARI 2024 PROJEK KELAPA SAWIT INTEGRASI LADANG ANTING
PROJEK TERNAKAN BIAK BAKA LEMBU PEDAGING
PENYATA UNTUNG RUGI PROJEK TERNAKAN LEMBU BIAK BAKA SEHINGGA 30 APRIL 2024 PENDAPATAN BULAN INI TAHUN INI Jualan Lembu 7,240.00 7,240.00 7,240.00 7,240.00 KURANG : KOS JUALAN Stok Awal 74,624.32 74,085.32 Tambah: Belanja Kendalian Belian Baka/ Bibit 0.00 0.00 Penyediaan Tapak 0.00 955.30 Gaji dan upah 0.00 307.00 Bahan Bakar 160.00 201.00 Pengangkutan 45.00 612.80 Ubatan 0.00 66.00 Makanan 48.00 418.00 Pengurusan dan Kawalan penyakit 24.00 1,006.70 277.00 3,566.80 Kurang: Stok Akhir 74,144.32 74,144.32 Keuntungan Kasar 6,483.00 3,732.20 KURANG: PERBELANJAAN Mesyuarat 26.50 1,256.25 Elaun/ Insentif 0.00 3,021.92 Belanja Ternakan Mati 0.00 0.00 Elaun Perjalanan dan Rawatan 0.00 223.20 Pembaikan dan Penyelenggaraan 191.00 2,691.00 Pembungkusan 0.00 24.50 Susutnilai 0.00 0.00 217.50 7,216.87 Keuntungan/(kerugian) 6,265.50 -3,484.67
GAMBAR TERKINI PELAKSANAAN PROJEK TERNAKAN BIAK BAKA LEMBU PEDAGING
GAMBAR TERKINI PELAKSANAAN PROJEK TERNAKAN BIAK BAKA LEMBU PEDAGING
GAMBAR TERKINI PROJEK TERNAKAN LEMBU PPNT
GAMBAR TERKINI PELAKSANAAN PROJEK TERNAKAN BIAK BAKA LEMBU PEDAGING (KEADAAN PADANG RUMPUT DI KAMPUNG PELAM)
PROJEK TERNAKAN LEMBU SECARA FIDLOT
PENYATA UNTUNG RUGI PROJEK TERNAKAN LEMBU FIDLOT SEHINGGA 30 APRIL 2024 PENDAPATAN BULAN INI TAHUN INI Jualan Lembu 0.00 0.00 Geran Kerajaan 0.00 0.00 0.00 0.00 KURANG : KOS JUALAN Stok Awal 0.00 0.00 Tambah: Belanja Kendalian Belian Baka/ Bibit 0.00 0.00 Gaji dan upah 0.00 0.00 Bahan Bakar 0.00 0.00 Penyediaan Tapak 0.00 0.00 Ubatan 0.00 0.00 Makanan 0.00 0.00 Pengangkutan 0.00 0.00 Pengurusan dan Kawalan penyakit 0.00 0.00 0.00 0.00 Kurang: Stok Akhir 0.00 0.00 Keuntungan Kasar 0.00 0.00 KURANG: PERBELANJAAN Iklan dan Promosi 0.00 0.00 Mesyuarat 0.00 0.00 Belanja Ternakan Mati 0.00 0.00 Pembaikan dan Penyelenggaraan 0.00 0.00 Susutnilai 0.00 0.00 0.00 0.00 Keuntungan/(kerugian) 0.00 0.00
GAMBAR TERKINI PELAKSANAAN PROJEK TERNAKAN LEMBU SECARA FIDLOT
GAMBAR TERKINI PELAKSANAAN PROJEK TERNAKAN BIAK BAKA LEMBU PEDAGING (TERNAKAN DI LADANG INTEGRASI)
PERANCANGAN MASA HADAPAN
PEMERIKSAAN DAN PENGAMBILAN SAMPEL DARAH OLEH JABATAN PERKHIDMATAN VETERINAR TERENGGANU
PEMERIKSAAN DAN PENGAMBILAN SAMPEL DARAH OLEH JABATAN PERKHIDMATAN VETERINAR TERENGGANU