TECHNO LT INSTALLATION GUIDE 2020

TECHNO LT INSTALLATION GUIDE 2020

Concealed Ceiling Framing System

Installation Guide

Components

Product Description Product No.

1. Ceiling Batten 36 x 16 mm CB3616
2. Furring Wall Track 16 mm WT16
3. Batten to Batten Cross Joiner CJ3616
4. Ceiling batten Joiner CBJ36
5. Adjustable Suspension Clip TSAC4
6. 4 mm Diameter Suspension Rod TSR04
7. Eye Anchor TEAM6

TWT16

CB3616

TSAC4

CBJ36

CJ3616 TEAM6

ROD4

Ceiling Configuration

▪ Firstly, determine the ceiling configuration required
▪ Chose the spacing of primary and secondary member and suspensions

based on design requirements

Marking finished ceiling level

▪ Determine finished ceiling level and mark steel (secondary section) level
on the walls

▪ Install wall track to wall
▪ Mark suspension points to slab soffit according to ceiling design

Installing Suspension Points

1. Mark position of suspension points to soffit of slab

2. Drill 6 mm diameter x 40 mm deep hole into concrete

3. Insert Eye Anchor (TEAM6) into hole and tap the anchor lightly with a
hammer and then pull out anchor to engage locking mechanism

Installing Eye Anchors Concrete slab

Eye Anchor

1. Drill into soffit of slab with M8 masonry drill bit. Hole depth shall be approx. 50 mm.
2. Insert the Eye-Anchor into hole as shown and use a hammer to lightly tap the anchor in.
3. Use a claw hammer to fit the anchor in between the claw and pull to lock the anchor in place.
4. Place the hooked end of suspension rod into eye of anchor.

Preparing & Installing Suspension Rods

Suspension rod cut to length 1. Press spring clip (TSAC4) with thumb and
(based on ceiling drop) and bend index finger and slip in the suspension rod
one end to form hook as shown
through the 2 holes.

2. Then, release spring clip which will grip
on to the rod.

Hook Suspension Rod assembly to
eyelet of anchor

Fixing the Primary Sections

Attach Primary section (CB3616)
to Suspension Clips – refer to
instructions on following page

Fixing the Primary Sections Turn Ceiling Batten to sit Press down tab to secure
squarely on clip as shown Ceiling Batten in place
Slip ceiling Batten into
clip at an inclination Product code:
TSAC4

Fixing the Secondary Sections

Product code :
CJ3616

Secondary section

Fixing Secondary to Primary Section

▪ Place Cross Joiner (product code
CJ3616) into secondary section as
shown

▪ Twist Cross Joiner so that the lips of
ceiling batten sit into slots of joiner.
Ensure that the joiner is positioned
vertically and square to the batten.
Repeat the same at intervals equal to
spacing of primary sections along the
length of the batten.

▪ Place batten perpendicular to primary
section and have the tab of joiner
over the top flange of primary section.

▪ Push the primary section tight against
the joiner and press tab down all the
way to rest against the web. Repeat
the same for all connections between
secondary and primary sections.

Jointing of Ceiling Batten CB3616

Ceiling Batten
CB3616

Ceiling Batten Joiner Fit ceiling batten to be jointed over Ensure the joint is tight fitting
Joiner and push in to 5-10mm
Fit Joiner (CBJ3616) into from the other ceiling batten
ceiling batten and push in
to approx. half way point

Fixing the Secondary Sections

Secondary section clipped
on to primary section

Fixing Ceiling Lining

Ceiling lining screw fixed to secondary
section (CB3616) in accordance to board
manufacturer’s instruction

TECHNO FRAME SOLUTIONS Sdn. Bhd.

No. 2, Jalan INR 2
Taman Industrial Nautical
48000 Rawang
Selangor, MALAYSIA

Tel. +603 6091 8988 Fax. +603 6091 2988
E-mail : [email protected]


Click to View FlipBook Version