Our Mission/ Our Promise
Regard each project with the utmost care and considera*on for both the clients
expecta*ons and budget. Taking those projects to the pinnacle of success through a
collabora*ve approach and applying a team atmosphere that goes above and
beyond each project to develop long las*ng partnerships
General Contracting Firm
Specialized in Commercial Construction
5856 S. Lowell Blvd Suite 32
Li leton, CO 80123
Office: 303.238.5044
Fax: 303.586.6006
Building What PROVIDING TOTAL END TO END PROJECT MANAGEMENT
Matters
Spire Building Group (SBG) is a general contrac ng
Spire Building Group has a firm that specializes in commercial construc on in
zero accident record on all of several different market sectors including but not
our projects from day one limited to:
since we’ve been in business.
We value every person’s ♦ Retail
livelihood and safety as
shown by our commitment ♦ Institutional
to always strictly adhering
to, and going beyond ♦ Government - federal, state,
basic health and safety local
guidelines.
♦ Healthcare
We provide flexible solu ons for building
a vision, whether it be new ground up
construc on, expansion of exis ng space
or renewing space by renova on!
Who we are Vice President of Spire Building Group—Jennifer Allen, has a
B.S. degree from Metropolitan State University of Denver with a
SBG is a dedicated team of men and women working together to provide an major in Biology and minor in Chemistry. She grew up in Colo-
excellent product for our clients. We are comprised of laborers, project rado tagging along with her dad to many of the construction
engineers, subcontractors, superintendents, project managers and admin staff. sites that he managed. She remembers the good old’ days be-
As we grow our commitment to the amazing people we bring onto our team will fore everything went digital, when architect plans and specs
remain the same. We recognize that it is the people on the team that create the were carried under one’s arm in a huge roll, and spread across
amazing outcome and success. large drafting tables to examine them. Of course as a child she
easily found joy and an appreciation for building from the expe-
President of Spire Building Group—Joey M. rience of hanging out with her dad on jobsites, going on roof-
Hiers, began his journey in the construction tops and walking the initial skeleton
industry as a framer in his teens. He com- of a building, while watching the
pleted a B.S. in Construction Management at progress of it all.
Missouri State University in 1999 and began
his professional career. The wonderment he It was no surprise then, that after
experiences seeing the vision of a project spending over 20 years in the heath
morph into its realization has never left him. and wellness industry managing
fitness facilities, and developing
Joey comes with a wealth of experience and Construction Management community programs, that she
knowledge. He has worked his way through the very initial levels of would be drawn to partnering in a
construction as a laborer, through estimating, Superintendent, into sen- commercial general construction
ior executive roles, to now owning his own firm. Before starting Spire company. She has demonstrated
Building Group, he ran an office in the Austin, TX. market for a large successful business operation and profitability for previous
Colorado based Construction firm. His years as a Senior PM and employers. Jennifer has extensive experience analyzing profit,
Construction Executive, leading projects across the country in different loss, and performance to reveal potential areas of improvement
markets gave him the ability to learn construction in various areas from in business, followed by implementing a plan of action. Her
a wide range of perspectives and demands. He learned the specifics of ability to streamline operation efficacy is valuable as SBG
other markets and the requirement each area needed to excel in the in- grows and develops through the years. Jennifer has a proven
dustry. Conversely, he also witnessed what factors seemed to lead to a track record of encouraging strong client relationships, and
higher instance of problems for projects. Joey attributes his keen under- employee cohesiveness within the company. One of Jennifer’s
standing of architecture and the process of managing a project through passions, developing community programs has been threaded
completion by having worked, and managed a such a wide variety of into SBG’s long term business goals as we continue to grow.
projects, across a range of markets. His diverse portfolio of projects has We are committed to increasing our community involvement
allowed him the confidence, and ability to take on intricate, unorthodox and contribution in volunteering.
projects that others may find to be off-putting or may render astronomi-
cal fees due their unfamiliarity. Joey understands how to save the own-
er, carefully budgeted capitol by striving for timely completion, enforc-
ing safety codes for accident free sites, and avoiding unforeseen cir-
cumstances that can lead to costly complications.
Joey approaches every project large, or small with the mindset and
determination to create a product that he is proud to associate as “his”.
He truly loves his vocation and makes it a goal to foster lasting relation-
ships with those involved in his projects. Joey’s satisfaction and pride
comes with the satisfaction each owner displays upon the completion of
their project and seeing how their vision comes to fruition. Joey says,
“The outcome of every one of our projects has to be an accurate reflec-
tion of SBG.”, which is why he holds everyone to the highest perfor-
mance and material standard.
SBG is proudly an EEO employer who celebrates diversity and inclusion within our company.
Projects Some Of Our Clients
♦ King Soopers 124 (Glendale) Floral
Change
♦ King Soopers/City Market Grocery
Pick Up/ Click List - Stores 060
(Lakewood), 035 (Denver), 030
(Aurora), 124 (Glendale), 443 (Rifle),
403 (Montrose), 441 (New Castle),
408 (Cortez)
♦ Red Rocks Community College Rec
Center Garage
♦ King Soopers 124 (Glendale) –Rest
Room Remodel and Fixture Upgrade
♦ King Soopers 115 Store Remodel
♦ King Soopers 036 Fred Meyer Jewler
Remodel
♦ State of Colorado Department of
Revenue Office Remodel
♦ Holy Trinity Lutheran Church
Remodel
♦ Olivet Salon
♦ The KnoHy Kids Salon
♦ Various King Soopers and City
Market C-Store Remodels
Spire Building Group’s accomplishments and
exper se stretches across the span of over
25 years of industry experience. It is our
number one goal to deliver exemplary
results and mely project comple ons at a
highly compe ve rate
, we strive to be one of the general
http://linkedin.com/company/spire-building-group
Past Construction Experience
♦ KWG Enterprises - Nixa, Missouri
♦ KeeWes Commercial Laundry Company – Springfield, Missouri
♦ Dixie Carbonics Dry Ice – Springfield, Missouri
♦ Equine Riding Arena – Rogersville, Missouri
♦ Midwest Tool – Ozark, Missouri
♦ LiHle Debbie Storage Facility – Springfield, Missouri
♦ Midwest Walnut Lumber Storage Facility – Willow Springs, Missouri
♦ Ken's Appliance Center – Springfield, Missouri
♦ St. Joseph Waste Water Treatment Plant Office Building – St. Joseph, Missouri
♦ Sonic Restaurants – St. Louis, Missouri
♦ Paul Mueller Addi on – Springfield, Missouri
♦ Solid Surface Design Warehouse Addi on – Billings, Missouri
♦ Palace View South Building 800 (4 story-16 unit Condo) – Branson, Missouri
♦ Super 8 Motel (40 Units) – Claremore, Oklahoma
♦ Super 8 Motel (42 Units) – Ava, Missouri
♦ Avondale Apartments (60 units) – Claremore, Oklahoma
♦ Hun ngton Falls Apartments (72 Units) – Ardmore, Oklahoma
♦ Autumn Ridge Apartments (60 Units) – Yukon, Oklahoma
♦ Brookfield Apartments (48 Units) – Valley Center, Kansas
♦ Timber Ridge Gardens Apartments (48 Units) – Cushing, Oklahoma
♦ Bridgewater Apartments (48 Units) – Haysville, Kansas
♦ Oxford Place Apartments (60 Units) – Okmulgee, Oklahoma
♦ Arbor Pointe Apartments (48 Units) – Texarkana, Arkansas
♦ Knollwood Heights Apartments (64 Units) – Big Spring, Texas
♦ Copeland Manufacturing Facility Phase II – Ava, Missouri
♦ Metro Builders Supply Warehouse and Showroom (80,000 square foot Concrete Tilt Wall) - Oklahoma City, Oklahoma
♦ Springfield-Branson Na onal Airport Jet Bridge Renova on - Springfield, Missouri
♦ Mark Twain Hotel Historical Renova on - Hannibal, Missouri
♦ San Regis Apartments Historical Renova on - St. Joseph, Missouri
♦ 3200 S. Federal Townhomes Site Improvements – Denver, Colorado
♦ Target Store T-2343 – Montrose, Colorado
♦ Super Target Store T-2403 – Ft. Collins, Colorado
♦ Target Store T-0064 Remodel – Boulder, Colorado
♦ Target Store T-2031 Remodel – Albuquerque, New Mexico
Past Construction Experience
♦ Target Store T-2031 Remodel – Albuquerque, New Mexico
♦ Target Store T-0356 Remodel – Albuquerque, New Mexico
♦ Super Target Store T-1500 Remodel – Lakewood, Colorado
♦ Weld County RE-4 Middle School No. 2 – Severance, Colorado
♦ Sam's Club Store No. 4770 – Evans, Colorado
♦ Wal-Mart Supercenter Store No. 5491 – Albuquerque, New Mexico
♦ Sam's Club Store No. 6632 Remodel – Denver, Colorado
♦ Wal-Mart Supercenter Store No. 3423 – Santa Fe, New Mexico
♦ Wal-Mart Neighborhood Market Takeover Store No. 3019 – Thornton, Colorado
♦ General Services Administra on (GSA) Building 56 Elevator Installa on – Lakewood, Colorado
♦ General Services Administra on (GSA) Building 56 Second Floor Renova on – Lakewood, Colorado
♦ General Services Administra on (GSA) Federal Building Energy Upgrades – Ft. Collins, Colorado
♦ General Services Administra on (GSA) Building 41 FAS Buildout – Lakewood, Colorado
♦ North Range Behavioral Health Addi on and Renova on – Ft. Lupton, Colorado
♦ Weld County Social Services Building – Greeley, Colorado
♦ Safeway Store No. 920 Fuel Sta on – Estes Park, Colorado
♦ Kansas State University Jardine Apartments Package A – ManhaHan, Kansas
♦ LeggeH and PlaH Flex-O-Lator Warehouse Addi on – Carthage, Missouri
♦ Snyder Construc on Office Building – Joplin, Missouri
♦ Empire District Electric New Service Center – Joplin, Missouri
♦ King Soopers No. 126 – Parker, Colorado
♦ Salida Del Sol Academy Charter School – Greeley, Colorado
♦ Walmart Neighborhood Market No. 3517 – Rio Rancho, New Mexico
♦ Randall's Store No. 3145 – Leander, Texas
♦ Walmart Supercenter No. 3585 – Spring, Texas
♦ Walmart Neighborhood Market No. 4056 – Converse,Texas
♦ Walmart Supercenter No. 6579 – New Caney, Texas
♦ Walmart Neighborhood Market No. 4466 – Sugar Land, Texas
♦ Edgewater Civic Center – Edgewater,Colorado
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
05/02/2022
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT Moody Insurance Agency
NAME:
Moody Insurance Agency, Inc.
8055 East Tufts Avenue PHONE (303) 824-6600 FAX (303) 370-0118
Suite 1000 (A/C, No, Ext): (A/C, No):
E-MAIL [email protected]
ADDRESS:
INSURER(S) AFFORDING COVERAGE NAIC #
Denver CO 80237 INSURER A : Westfield Insurance Company 24112
INSURER B : Pinnacol Assurance 41190
INSURED INSURER C : Homeland Ins Co of NY 34452
Spire Building Group, LLC
5856 S. Lowell Blvd. INSURER D :
SAMPLE
Ste 32 CO 80123 INSURER E :
Littleton INSURER F :
COVERAGES CERTIFICATE NUMBER: 21-22 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS
LTR INSD WVD (MM/DD/YYYY) (MM/DD/YYYY)
COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
$ 500,000
CLAIMS-MADE OCCUR DAMAGE TO RENTED
PREMISES (Ea occurrence)
MED EXP (Any one person) $ 5,000
A Y Y CWP050131F 08/29/2021 08/29/2022 PERSONAL & ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000
POLICY PRO- LOC PRODUCTS - COMP/OP AGG $ 2,000,000
JECT
OTHER: $
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000
(Ea accident)
ANY AUTO BODILY INJURY (Per person) $
A OWNED SCHEDULED CWP050131F 08/29/2021 08/29/2022 BODILY INJURY (Per accident) $
AUTOS 08/29/2021 08/29/2022
AUTOS ONLY NON-OWNED 09/01/2021 PROPERTY DAMAGE $
HIRED AUTOS ONLY 08/29/2021 (Per accident)
AUTOS ONLY $ Included
Underinsured motorist $ 2,000,000
UMBRELLA LIAB OCCUR combined single limit $ 2,000,000
A EXCESS LIAB CLAIMS-MADE CWP050131F EACH OCCURRENCE
4212175
7930084650003 AGGREGATE
DED RETENTION $ 0 $
WORKERS COMPENSATION PER OTH- $ 1,000,000
STATUTE ER $ 1,000,000
AND EMPLOYERS' LIABILITY Y/N $ 1,000,000
B ANY PROPRIETOR/PARTNER/EXECUTIVE N/A Y 09/01/2022 E.L. EACH ACCIDENT 1,000,000
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEE
If yes, describe under E.L. DISEASE - POLICY LIMIT
DESCRIPTION OF OPERATIONS below
Pollution Liability Limit
Pollution Liability
C YY 08/29/2022 Transportation Limit 1,000,000
Non-owned Disposal 1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
Project: Minor Capital Store# 620-00414 City Market
555 Marketplace Plaza
Steamboat Springs, CO 80487
The Kroger Co. and its subsidiaries, affiliates, directors, officers, agents and employees are Additional Insureds with
respect to General Liability and Auto Liability.
CERTIFICATE HOLDER CANCELLATION
The Kroger Co and Kroger's affillaste and aubsidiaries C/o The Kroger SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
C10o1. 4 Vine Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
Cincinnati OH 45202
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD