Establishment of Imam Bukhari Desalination Plant
Project Idea
The project will create a desalination plant with a
capacity of 12,000 liters / day to feed the mosque
and its compound (Al-Imam Al-Bukhari Council +
Al-Atqan Quran Memorization School) and the
.neighborhood surrounding it with drinking water
Project Objectives
1.Providing safe drinking water within WHO
standards and specifications.
2.Contributing to reducing the spread of health
diseases caused by pollution and water
shortage.
3. Improving the overall health and environmental
situation in the mosque and surrounding area.
برج سندس الطابق الثاني, شارع عبد القادر الحسيني, غزة
00972 8 2 88 93 66 00972 59 7 10 21 45
Resala Charitable Association
+
Project Beneficiaries
1. Beersheba Mosques Prayers .
2.Students of forensic science in the Imam al-
Bukhari Council, who are more than 1700
students.
3.Students of Al-Ateqan for memorizing the Holy
Quran, who are more than 200 students.
4.Poor families surrounding the mosque.
Project Duration
One month from the starting date
برج سندس الطابق الثاني, شارع عبد القادر الحسيني, غزة
00972 8 2 88 93 66 00972 59 7 10 21 45
Resala Charitable Association
Estimated cost of the project
No. Item Quantity Total
$ 4000
Desalination Plant Production station 10-12 cup / day
1 The stand of the desalination plant is made of 1
galvanized iron painted three sides suitable for
serving the desalination unit
2 Electrical shutter made of noresta 304 1
3 A preparation pump suitable for the size of the
desalination unit conforming to European 1
standards
4 High Pressure Switch Type Danfoss 1
5 Low Pressure Switch Type Danfoss 1
6 injection pump for Antisekil 1
7 A 60 liter gas tank for antisekil + electric fans 1
8 HOUSE CEDMENT 20 "+ CEDMENT PVC MICRON 2
"20
9 The high pressure pump Norsta 304 suitable for
the production of the desalination unit according to
European specifications 1
10 House Membrane 4 "capacity 1 Membrane made of 2
fiberglass type ROPV
11 Filter Desalination Membrane 4”* 4”Rejection 2
99.8% TORAY Made in USA
12 Flumeter (desalinated water) is proportional to the 1
output of the desalination unit
13 Flumeter (salt water) is proportional to the output 1
of the desalination unit
برج سندس الطابق الثاني, شارع عبد القادر الحسيني, غزة
00972 8 2 88 93 66 00972 59 7 10 21 45
Resala Charitable Association
14 Electrical control panel with all the required
protection to monitor the operation of the 1
desalination unit + system plc
15 Oil pressure watch fits the size of the unit 2
16 All high pressure couplings shall have at least 40 &
bar and stainless steel
17 All low pressure couplings from PVC 16 bar &
18 Supply and installation of a sterilization device with
a capacity that is proportional to the production 2
capacity of the desalination plant and is installed
inside the desalinated water tanks
19 SUPPLY AND INSTALLATION OF WATER
CABINETS OF 2000 L PERCENT OF WATER 2 & 400
SUPPLY WITH SUPPLY OF ALL CONNECTIONS
AND PARTS FOR INSTALLATION made from pvc
20 Supplying and installing the plumbing basin, made $ 1000
of 304 SS thickness 2 mm + installed cover 304 1
SS thickness 2 mm and the basin can
accommodate 4 faucets, provided that the length
of the basin SS 2 m.
Guarantee on all components of the desalination unit for one year from the date of operation and
guarantee including incineration, breakage or change of any piece that is disrupted during the
warranty period + Supply of all consumables and filters of the sediment for the desalination plant
Five Thousand Four Hundred Dollars Only $ 5400