SAMPLE BILL NO. 5.3 - REPAIR AND PART REPLACEMENT FOR ELECTRICAL
(PROVISIONAL QUANTITIES)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)

Repair and part replacement which was not
caused by failure and negligence in operation
& maintenance plan and as required
according to asset life cycle and FCA report
including testing & commisioning and
removing debris from the site to designated
area.

All repair and replace works should be carry
out carefully and make good all works
disturbed and approved by FSO

Surge Protection Device (SPD) nos
Supply and install Surge Protection Device nos
(SPD) including its accessories,all works
associated and making good after completion nos
at: nos

A Riser Room

B Low Voltage Room

LED Emergency Light

Supply and install LED Emergency Light as
specified or equivalent and approved by FSO
including its accessories and making good
after completion at:

C Plant Room

D Chiller Room

Public Address (PA) System

Supply and install Public Address (PA) System
as specified or equivalent and approved by
FSO including its accessories and making
good after completion at:

E Blok Utama SUM

TOTAL CARRIED TO COLLECTION
RR(E) - 1/3

SAMPLE BILL NO. 5.3 - REPAIR AND PART REPLACEMENT FOR ELECTRICAL
(PROVISIONAL QUANTITIES)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)

Repair and part replacement which was not
caused by failure and negligence in operation
& maintenance plan and as required
according to asset life cycle and FCA report
including testing & commisioning and remove
debris from the site to designated area.

All repair and replace works should be carry
out carefully and make good all works
disturbed and approved by FSO

Uninterruptible Power Supply(UPS)

Supply and install Uninterruptible Power SUM
Supply (UPS) including its accessories and SUM
making good after completion at: nos

A Server Room

Conference System

Supply and install Conference System
including its accessories and making good
after completion at:

B Bilik Mesyuarat Utama

Card Access System

Supply and install Card Access Devices
including its accessories and making good
after completion at:

C Blok A

TOTAL CARRIED TO COLLECTION
RR(E) - 2/3

SAMPLE BILL NO. 5.3 - REPAIR AND PART REPLACEMENT FOR ELECTRICAL
ITEM (PROVISIONAL QUANTITIES)

DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)

COLLECTION PAGE
R.R(E) - 1/3
R.R(E) - 2/3

TOTAL CARRIED TO SUMMARY
RR(E) - 3/3

PROJECT BILL NO. 5.4 - REPAIR AND PART REPLACEMENT FOR ENERGY EFFICIENCY
ZON / BLOK : (PROVISIONAL QUANTITIES)

(SAMPLE)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)

Repair and part replacement which was not
caused by failure and negligence in operation &
maintenance plan and as required according to
asset life cycle and FCA report including testing &
commisioning and removing debris from the site to
designated area.

All repair and replace works should be carry out
carefully and make good all works disturbed and
approved by FSO

Architecture, Civil and Structure Energy nos
Efficiency Features as follows: nos
A Weather seal and gasket for double glazing door nos
nos
B motor device for atrium
C Motorized louvres for atrium
D Ventilation fan system for atrium

Mechanical Energy Efficiency Features as nos
follows: nos
E Inverter nos
nos
F Carbon Dioxide Sensor nos
nos
G Carbon Monoxide Sensor
nos
H Electronic Air Filter
nos
J NCU Battery for BCS
nos
K Digital Controller for BCS

Electrical Energy Efficiency Features as
follows:

L Solar array mounting structure for Grid Connected
Photovoltaic (PC) System

M Field junction box for rid Connected Photovoltaic
(PC) System

N Photo sensor/occupancy sendor for Innovative Light
System

TOTAL CARRIED TO SUMMARY

* BQ ini adalah sebagai contoh sahaja RR(E) - 1/1

TENDER UNTUK :

ZON / BLOK :

BILL NO.6 - PROVISIONAL SUM

ITEM DESCRIPTION UNIT AMOUNT
NO RM

PROVISIONAL SUM

A Allow provisional sum for Housekeeping & Cleaning LUMP SUM
Services
LUMP SUM
Profit LUMP SUM / %
Attendance

B Allow provisional sum for Pest Control Services LUMP SUM
Profit LUMP SUM
Attendance LUMP SUM / %

D Allow a Provisional Sum of Ringgit Malaysia LUMP SUM

…………………… for Emergency Breakdown Work for

Electrical Services

Profit LUMP SUM

Attendance LUMP SUM / %

E Allow a Provisional Sum of Ringgit Malaysia LUMP SUM

…………………… for Emergency Breakdown Work for

Mechanical Services

Profit LUMP SUM
Attendance LUMP SUM / %

F Allow a Provisional Sum of Ringgit Malaysia LUMP SUM
…………………………..) for Emergency Breakdown

Work for Civil, Structure and Architecture

Profit LUMP SUM
Attendance LUMP SUM / %

TOTAL CARRIED TO SUMMARY
PROV - 1/1

LAMPIRAN B

TEMPLETE JADUAL HARGA KONTRAK

PENJAGAAN FASILITI

PROJECT :

SUMMARY OF TENDER FOR FACILITY CUSTODIAL SERVICES

BILL DESCRIPTION OF WORKS PAGE AMOUNT
NO. (RM)

1 HOUSEKEEPING

TOTAL AMOUNT

RINGGIT MALAYSIA:………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

Contract period: ……………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

Contractor …………………………… Witness ………………………………

Signature: …………………………… Signature: ………………………………

Name: …………………………… Name: ………………………………
Company …………………………… NRIC No. : ………………………………
Stamp: ……………………………

…………………………… Date: ………………………………

TENDER UNTUK :

ZON / BLOK :

SAMPLE BILL NO. 4.6 - ENERGY MANAGEMENT

ITEM DESCRIPTION OF WORKS UNIT AMOUNT
NO. RM

Carry out Operation and Maintenance Services including
repairing works and replace consumable part as specified in
technical specification, maintenance frequency schedule (to be
proposed by tenderer) in Appendix XXX and Site Information and
Asset Inventories in Appendix 8. All services provided where not
specified in the specification should follow Malaysian Standard
(MS) and fulfill Local Authority requirement to ensure
achievement of Key Performance Indicator (KPI) asset
availability, safety and functionality for works below :

A Architectural Energy Efficiency consist of: SUM
SUM
i) "Punch hole" windows
ii) Double Glazing Door SUM
iii) Atrium - Automatic shading system
iv) Atrium - "Thermal Flue Stack" System

B Mechanical Energy Efficiency consist of:

i) AC System - AHUs, FCUs & Pump
ii) AC System - Variable Speed Drivers
iii) AC System - CO2 Fresh Air Control
iv) AC System - Heat Recovery Wheel System
v) AC System - Electronic Air Filters
vi) Car Park Ventilation - CO Exhaust Control System
vii) Building Control System/ Energy Mangement System

C Electrical Energy Efficiency consist of:

i) Innovative Lighting system
ii) Grid Connected Photovoltaic(PV) System

TOTAL CARRIED TO SUMMARY
Energy - 1/1

PROJECT :

ZON / BLOK : BILL FACILITY CUSTODIAL SERVICES - HOUSE KEEPING SERVICES
ITEM
NO. DESCRIPTION OF WORKS UNIT AMOUNT
RM

Carry out all cleaning services within the boundry of the premis as
specified in Technical Specification, Appendix 7A2 & Appendix 8,
Malaysian Standard (MS), local authority requirement to achieve
Key Performance Indicator (KPI) for all spaces as follows (not
limited to):

Cleaning Services SUM
A Public Area(…….m2) with: SUM

i) Ceramic tiles floor SUM
ii) Painted plastered wall SUM
iii) ……………………..
B Office Spaces(…….m2) with:
i) Carpet finishes
ii) Painted plastered wall
iii) Glass panel
iv) ……………………….
C Restroom(…….m2) with:
i) Semi glazed ceramic tiles floor
ii) Water Closet, basin and concrete top
iii) ……………………………
D Exterior Cleaning
i) Glass panel
ii) Aluminium louvred panel
iii) Timber
iv) Concrete wall
v) Aluminium panel
vi) ……………………………
E Stairwell
i) ………………….
ii) ….………………

TOTAL CARRIED TO COLLECTION

BQ HKS - 1/3

BILL FACILITY CUSTODIAL SERVICES - HOUSE KEEPING SERVICES

ITEM DESCRIPTION OF WORKS UNIT AMOUNT
NO. RM

Carry out all cleaning services within the boundry of the premis as
specified in Technical Specification, Appendix 7A2 & Appendix 8,
Malaysian Standard (MS), local authority requirement to achieve
Key Performance Indicator (KPI) for all spaces as follows:

A Elevator SUM

i) ………………….

ii) ….………………

G Restroom (…nos/….m2) SUM

i) ………………….
ii) ….………………

H Tenant Spaces SUM

i) ………………….
ii) ….………………

J Driveway, parking areas and Basement Car Park SUM

i) ………………….
ii) ….………………

K Road, Passageway and Covered Walkway SUM

i) ………………….
ii) ….………………

L Refuse Bin Centre SUM

i) ………………….
ii) ….………………

HYGIENIC SERVICES

Supply and replenishment of the consumbles as specified in
Technical Specification, Appendix 7A2 & Appendix 8, Malaysian
Standard (MS2550), local authority requirement to achieve Key
Performance Indicator (KPI) as follows:

M Automatic air freshener SUM
N Furnish and refill all toilet tissues, c fold paper tower, hand SUM

sanitiser and soap SUM
SUM
P Sanitary bins for for female toilets with bacterial vapors

Q Anticepetic for each cubical and urinal bowl

TOTAL CARRIED TO COLLECTION

BQ HKS - 2/3

BILL FACILITY CUSTODIAL SERVICES - HOUSE KEEPING SERVICES

ITEM DESCRIPTION OF WORKS UNIT AMOUNT
NO. RM

COLLECTION PAGE
BILL HK - 1/3
BILL HK - 2/3

TOTAL CARRIED TO COLLECTION

BQ HKS - 3/3

PROJECT :

SUMMARY OF TENDER FOR FACILITY CUSTODIAL SERVICES

BILL DESCRIPTION OF WORKS PAGE AMOUNT
NO. (RM)

1 PEST CONTROL

TOTAL AMOUNT

RINGGIT MALAYSIA:………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

Contract period: ……………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………

Contractor …………………………… Witness ………………………………

Signature: …………………………… Signature: ………………………………

Name: …………………………… Name: ………………………………
Company …………………………… NRIC No. : ………………………………
Stamp: ……………………………

…………………………… Date: ………………………………

PROJECT :

ZON / BLOK :

BILL FACILITY CUSTODIAL SERVICES - PEST CONTROL SERVICES

ITEM DESCRIPTION OF WORKS UNIT AMOUNT
NO. RM

Carry out pest control services to all types of pests within
the premise and the surrounding area as specified in
technical specification and its appendices to achieve Key
Performance Indicator (KPI) as follows:

A Insects SUM

B Rodent and mammals SUM

C Birds SUM

D Reptiles SUM

E Pest Control Services (fogging, rat baits, SUM
misting,larvaciding, and other pest control services)

TOTAL CARRIED TO SUMMARY