City of Branson FY2023 Annual Budget

PROJECT TITLE: REPLACE FIRE STATION 3 GENERATOR PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: FIRE DEPARTMENT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials 50,000$ 50,000$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 50,000$ -$ -$ -$ -$ -$ 50,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 2/3/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This project replaces a 25 year old emergency generator at Fire Station  #3.  This generator would be a “whole house” generator to also supply  the HVAC systems. 151


PROJECT TITLE: BATTALION CHIEFS COMMAND STAFF UNIT PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: FIRE DEPARTMENT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other 58,000$ 58,000$ TOTAL: 58,000$ -$ -$ -$ -$ -$ 58,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 2/3/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This project funds the purchase of a new medium‐duty pick‐up truck,  camper shell / topper, command box work station, and emergency  warning equipment to be used by the Battalion Chiefs. The Battalion  Chiefs (3) work 24 hour shifts and are the first line of supervision for  the department as they lead the daily operations and responses in the  community.This project replaces a 25 year old emergency generator at  Fire Station #3.  This generator would be a “whole house” generator to  also supply the HVAC systems. 152


2023 Funded Projects by Department (Information Technology) 153


PROJECT TITLE: City Core Software Modernization (ERP) PROJECT NUMBER: N/A PRIORITY: 1 PROJECT TYPE: DEPARTMENT/AGENCY: IT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 500,000 $ 500,000 TOTAL: $ - 500,000 $ -$ -$ -$ -$ 500,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs $ 500,000 $ 500,000 Operational Personnel Costs -$ Other -$ TOTAL: $ - 500,000 $ -$ -$ -$ -$ 500,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 City Enterprise Resource Planning System for use to manage day to day business operations  for financial, licensing, and various other business processes. Current business processes are  being evaulated and vendors are being brought in to see what they offer and what system  makes the most beneficial  for the City.This will impact the whole City with services offered  to the general public. PICTURE OR MAP  154


PROJECT TITLE: Aerial Photography PROJECT NUMBER: N/A PRIORITY: 2 PROJECT TYPE: N/A DEPARTMENT/AGENCY: IT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… $ 74,000 $ 74,000 Other -$ TOTAL: $ -$ 74,000 -$ -$ -$ -$ 74,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other $ 74,000 $ 74,000 TOTAL: $ -$ 74,000 -$ -$ -$ -$ 74,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Contracted with Eagleview Pictometry to provide high resolution, digital  aerial orthophotography and oblique photography, as well as Lidar  elevation data and 2 foot contour data for 60 square miles. A new flyover  in 2023 will occur. The digital aerial photography is also utilized by  citizens, visitors, local businesses, prospective businesses, developers,  real estate agents and engineering firms. With the tremendous growth  the City has experienced over the last three to four years, the current  aerial phtography is out‐of‐date, and not reflective of the current status  of growth and development in our community. PICTURE OR MAP  155


PROJECT TITLE: IT Servers (Primary & Datacenter) PROJECT NUMBER: N/A PRIORITY: 3 PROJECT TYPE: N/A DEPARTMENT/AGENCY: IT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials $ 120,000 $ 120,000 Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ - 120,000 $ -$ -$ -$ -$ 120,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 120,000 $ 120,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ - 120,000 $ -$ -$ -$ -$ 120,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 New IT Servers need to be put in place to replace the obsolete servers  currently in place. This will allow business operations to continue to  operate and function at full efficiency. All departments will be affected by  this upgrade. This is needed in order for the City to continue operating  PICTURE OR MAP  156


PROJECT TITLE: Backup Solution (Rubrik) PROJECT NUMBER: N/A PRIORITY: 4 PROJECT TYPE: N/A DEPARTMENT/AGENCY: IT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 125,000 $ 125,000 TOTAL: $ - 125,000 $ -$ -$ -$ -$ 125,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other $ 125,000 $ 125,000 TOTAL: $ - 125,000 $ -$ -$ -$ -$ 125,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 The IT department is currently seeking a new backup solution to replicate  to the cloud. This will allow for quicker recovery times and also eliminate  the need for another physical backup location located offsite at a  different on premise location. The Backup solution would take current  snapshots of the City's current data and replicate it to the cloud in case of  a physical disaster. This will impact all City departments as each  departments data will be stored in the backup. PICTURE OR MAP  157


PROJECT TITLE: Fibre Channel Switches PROJECT NUMBER: N/A PRIORITY: 5 PROJECT TYPE: N/A DEPARTMENT/AGENCY: IT PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 28,000 $ 28,000 TOTAL: $ -$ 28,000 -$ -$ -$ -$ 28,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 28,000 $ 28,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 28,000 -$ -$ -$ -$ 28,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 New Fibre Channel Switches need to be installed to replace older obsolete Fibre Channel Switches. This is used for the SAN to process data  storage quick and reliable. All departments will be impacted by this as  users use storage to process their daily business functions. PICTURE OR MAP  158


2023 Funded Projects by Department (Parks) 159


PROJECT TITLE: Campground Expansion PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Parks & Recreation PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property $ 1,000,000 $ 1,000,000 Materials $ - Labor $ - Furniture, Fixtures, Equipment (FFE) $ - Professional Services: Design, Survey, Etc.… $ - Other $ - TOTAL: $ 1,000,000 $ -$ - -$ -$ -$ $ 1,000,000 Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance $ - Equipment Replacement $ - Operational Contract Costs $ - Operational Personnel Costs $ - Other $ - TOTAL: $ -$ - -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This project includes the expansion and construction of the campground operation on 3.67 acres of land adjacent to the Branson Lakeside RV Park. The project will serve to construct approximately 31 sites and include the installation of electric, water, sewer, campground roads and a restroom. 160


PROJECT TITLE: Replacement HVAC Units - Community Center PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Parks & Recreation PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property 70,000$ 70,000$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 70,000$ -$ -$ -$ -$ -$ 70,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This project will replace the original HVAC units at the Branson Community Center installed when the building was constructed in 1991. The price includes 1-15 Ton Trane Air Handler, 1-15 Ton Trane Heat Pump, 1-7.5 Ton Trane Air Handler and 1-7.5 Ton Trane Heat Pump. The project will reconnect to the existing supply duct, electrical and new refrigerant lines. It is prudent to budget for this replacement as the units are 31 years old and the current lead time for replacement is approximately 5-6 months. In addition, this will replace units in the kitchen and office area. The units have experienced as increasing amount of repair needs. Since 2016, repair costs have totaled $8,977.51. 161


PROJECT TITLE: HVAC Replacement - Branson RecPlex PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Parks & Recreation PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property $ 80,000 $ 80,000 Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 80,000 $ - -$ -$ -$ -$ 80,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This is the first of the two large 40 ton HVAC units on the roof that will be 18 years old in 2023. The normal expected lifespan for a unit this size is 15 years. As part of our ongoing maintenance plan, we are planning and budgeting to replace one unit each year in 2023 and 2024. By proactively planning, we hope to avoid necessitating an emergency purchase when a unit goes down. Over the past 5 years, we have begun replacing smaller units at the RecPlex and have sustained significant expenses in keeping the current units running. In 2020, one of the large uits had a compressor go out, necessitating $10,000 expense. In addition, the new unit will increase efficiency and reduce the maintenance costs we are currently experiencing. Due to the fact that the condenser unit and other parts on the unit are becoming obsolete, it is prudent to replace this unit now. If the unit were to go down, this would drastically overwork the second unit in the gym and possibly cause it to fail. The timeline to replace this Carrier Unit is 6 months currently. 162


PROJECT TITLE: Replacement Unit #37 - 1996 F350 Flatbed Dump Truck PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Parks & Recreation PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property $ 85,000 $ 85,000 Materials $ - Labor $ - Furniture, Fixtures, Equipment (FFE) $ - Professional Services: Design, Survey, Etc.… $ - Other $ - TOTAL: $ - 80,000 $ -$ -$ -$ $ 85,000 - $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance $ - Equipment Replacement $ - Operational Contract Costs $ - Operational Personnel Costs $ - Other $ - TOTAL: $ -$ - -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Truck #37 is a 1996 F350 Flatbed dump truck was taken out of service and in February 2022 and surplused due to mechanical issues and lack of availability of parts. The truck had a replacement score of 19.5 and had 97,487 miles. A flatbed truck is needed to haul mulch, dirt and other materials to parks and pick up downed tree limbs. This will be replaced by a F550. 163


2023 Funded Projects by Department (Police) 164


PROJECT TITLE: Unmanned Aerial Vehicle PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Police Department PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 45,000 $ 45,000 TOTAL: $ -$ 45,000 -$ -$ -$ -$ 45,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 45,000 $ 45,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 45,000 -$ -$ -$ -$ 45,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Eric Schmitt Date 1/23/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/27/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Unmanned aerial vehicle for police department & City of Branson use.  PD  will use for Law Enforcement operations while it will also be used for city  uses like mapping, etc. FAA regulations require a licensed pilot. The only licensed pilot for this  drone in the City of Branson is in the police department. Will continue to research grant funding for this project. PICTURE OR MAP  165


PROJECT TITLE: Replacement Public Service Assistant Vehicle PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Police Department PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 50,000 $ 50,000 TOTAL: $ -$ 50,000 -$ -$ -$ -$ 50,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 50,000 $ 50,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 50,000 -$ -$ -$ -$ 50,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Eric Schmitt Date 1/23/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/27/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Based upon State of Missouri bid. No specific vehicle type chosen yet as  this will be a utility vehicle and will be chosen based on need and  availability. PICTURE OR MAP  166


PROJECT TITLE: Replacement Crime Scene Investigator Vehicle PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: Police Department PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 45,000 $ 45,000 TOTAL: $ -$ 45,000 -$ -$ -$ -$ 45,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 45,000 $ 45,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 45,000 -$ -$ -$ -$ 45,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Eric Schmitt Date 1/23/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/27/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Based upon State of Missouri bid. No specific vehicle type chosen yet as  this will be a utility vehicle and will be chosen based on need and  availability. This vehicle will be used for crime scene processing tools and evidence  transport. PICTURE OR MAP  167


2023 Funded Projects by Department (Public Works & Engineering) 168


PROJECT TITLE: Trailer Mounted Oil Distributor PROJECT NUMBER: PRIORITY: 1 PROJECT TYPE: Equipment DEPARTMENT/AGENCY: Public Works Street PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) 125,000$ 125,000$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 125,000$ -$ -$ -$ -$ -$ 125,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This distributor trailer allows us to heat and place tack oil needed in the paving process. Compact size with 1000 Gallon capacity This equipment will be purchased out of the transportation funds. 169


PROJECT TITLE: Ground Penetrating Radar Utilities Locator PROJECT NUMBER: PRIORITY: 1 PROJECT TYPE: DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) 26,000$ 26,000$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 26,000$ -$ -$ -$ -$ -$ 26,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Professional grade locator for underground pipes and cable utility location for the following: metal utilities including pipes and cables non-metallic pipes, including PVC and asbestos cement concrete storm and sewer systems utilities where tracer wire has failed underground storage tanks and drainage tiles septic system components This GPR will assist project managers with large construction This equipment will be purchased out of the general fund for the engineering department. PICTURE OR MAP 170


PROJECT TITLE: Cliff Drive Stormwater Improvements PROJECT NUMBER: PRIORITY: 2 PROJECT TYPE: Capital Project DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor 140,000$ 140,000$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… 15,500$ 15,500$ Other -$ TOTAL: 155,500$ -$ -$ -$ -$ -$ 155,500$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Replacing the existing corrugated metal culvert with a concrete box culvert, and armoring/reinforcing the downstream drainageway to prevent future erosion. The proposed box culvert measures 70-feet in length and 4-feet high by 6-feet wide. In addition, the downstream channel will be lined with riprap for a distance of 100 feet to prevent further erosion. This capital project has been submitted as part of the Stormwater ARPA grant applications. 171


PROJECT TITLE: Replace Unit #88 Olathe Wood Chipper PROJECT NUMBER: PRIORITY: 2 PROJECT TYPE: Equipment DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) 47,000$ 47,000$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 47,000$ -$ -$ -$ -$ -$ 47,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Replacement of 1993 model wood chipper to provide better capabilities and safer equipment for employees. Request was approved in 2017 for the purchase but due to lack of funding was not purchased. According to the equipment replacement schedule, this machine has been scheduled for replacement since 2002. There are many inefficiencies with the outdated equipment such as no emergency safety equipment. This machine will also include a winch that will allow maneuverability of larger branches and smaller trees. Transportation Funds PICTURE OR MAP 172


PROJECT TITLE: Painting Branson Landing Blvd & Veterans Bridge Pedestrian Railing PROJECT NUMBER: PRIORITY: 3 PROJECT TYPE: Construction DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor 176,000$ 176,000$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 176,000$ -$ -$ -$ -$ -$ 176,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This project will consist of removal, sandblasting and powder coating/painting approximately 3,400 linear feet of the existing pedestrian walkway railing on both the Branson Landing Boulevard bridge and the Veterans bridge. Transportation Fundsl PICTURE OR MAP 173


PROJECT TITLE: 76 ECID Maintenance Building PROJECT NUMBER: PRIORITY: 2 PROJECT TYPE: Building DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other 150,000$ 150,000$ TOTAL: 150,000$ -$ -$ -$ -$ -$ 150,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Maintenance building for housing equipment and supplies for the 76 ECID maintenance workers. 40'X50' insulated metal building with all utilities. Will be located on city-owned property on Green Mountain Drive. 76 ECID tax funds PICTURE OR MAP 174


PROJECT TITLE: Replace Unit #98 - 2001 Ford Explorer PROJECT NUMBER: PRIORITY: 3 PROJECT TYPE: Equipment DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other 40,000$ 40,000$ TOTAL: 40,000$ -$ -$ -$ -$ -$ 40,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This will consist of replacing the Streets Department 2001 Ford Explorer Sport Trac that according to the vehicle replacement schedule was scheduled for replacement in 2010. Current mileage is 194,000 and maintenance costs total $9,906. It was taken out of rotation due to rusted frame and determined unsafe to drive. This vehicle will be auctioned as surplus and replaced with a vehicle through the lease/purchase program. Transportation Fund PICTURE OR MAP 175


PROJECT TITLE: W. 76 Country Blvd. Segments 1 & 2 PROJECT NUMBER: EN7622 PRIORITY: 1 PROJECT TYPE: Engineering Design DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor $ 25,000,000 1,200,000 $ 26,200,000 $ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… $ 1,182,815 $ 1,182,815 Other -$ TOTAL: $ 25,000,000 2,382,815 $ - $ -$ -$ -$ 27,382,815 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ $ - -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Final consultant design of Hwy. 76 Segments 1 & 2 from Branson Ferris Wheel property to the Shepherd of the Hills Expressway to include surface or pedestrian improvements to increase the aesthetics, pedestrian accessibility, stimulate redevelopment on vacant parcels and to improve the vitality of this important commercial district. Construction contract bidding will begin upon completion of design and approval by 76 Entertainment District CID, Finance Committee and Board of Alderman. This may be a mixture of bonds and 76 ECID tax PICTURE OR MAP 176


PROJECT TITLE: Historic Downtown Phase 4 Engineering Design PROJECT NUMBER: PRIORITY: 4 PROJECT TYPE: Downtown Streetscape DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… 990,000$ 990,000$ Other -$ TOTAL: 990,000$ -$ -$ -$ -$ -$ 990,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Engineering design and construcion of Phase 4 of the Historic Downtown Streetscape Improvements Tourism Funds PICTURE OR MAP 177


PROJECT TITLE: Caudill Way Low Water Crossing PROJECT NUMBER: PRIORITY: 5 PROJECT TYPE: Design & Construction DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor 310,000$ 310,000$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… 50,000$ 50,000$ Other -$ TOTAL: 360,000$ -$ -$ -$ -$ -$ 360,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This will consist of engineering design and contractor construction for the replacement of an existing box culvert structure low water crossing on Caudill Way. The improvements to this low water crossing will allow a second emergency exit for Taneycomo Acres. Applied for ARPA funds. Transportation Funds PICTURE OR MAP 178


PROJECT TITLE: Paint Striper PROJECT NUMBER: PRIORITY: 4 PROJECT TYPE: Equipment DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) 90,000$ 90,000$ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: 90,000$ -$ -$ -$ -$ -$ 90,000$ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: -$ -$ -$ -$ -$ -$ -$ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 This paint striper will provide the streets department with striping capabilities to produce professional results. It can be mounted on a heavy duty pickup or flatbed currently in fleet and will be easy to operate. It is a self-contained unit with three gun striper and two (2) sixty gallon paint tanks for even pressure of paint and bead application. The purchase of this machine will alleviate hiring of outside contractor for street striping projects. This capital expenditure was approved in the FY2020 PBB process but was put on hold due to Covid-19. Transportation Funds PICTURE OR MAP 179


PROJECT TITLE: Hwy. 76 & Hwy. 165 Intersection Improvements PROJECT NUMBER: PRIORITY: PROJECT TYPE: Capital Construction DEPARTMENT/AGENCY: Public Works/Engineering PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property $ - Materials $ - Labor $ 630,000 $ 630,000 Furniture, Fixtures, Equipment (FFE) $ - Professional Services: Design, Survey, Etc.… $ 120,000 $ 120,000 Other $ - TOTAL: $ 750,000 $ - $ - $ - $ - $ - $ 750,000 Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance $ - Equipment Replacement $ - Operational Contract Costs $ - Operational Personnel Costs $ - Other $ - TOTAL: $ - $ - $ - $ - $ - $ - $ - Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Keith A. Francis Date 1/20/2023 *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 2/3/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Intersection improvements were originally prepared as part of Highway 76 Segment 3 improvements at the Highway 165, Gretna & Highway 76 intersection. That project has since been changed from full intersection improvements to an eastbound right turn lane to turn south on Hwy. 165 from eastbound Hwy. 76 in order to assist in better traffic flow for vehicles turning south on Hwy. 165. This project was held off during construction of the project due to the undergrounding of the utilities at this intersection. Transportation Funds/Tourism Funds PICTURE OR MAP 180


2023 Funded Projects by Department (Utilities) 181


PROJECT TITLE: PROJECT NUMBER: WS2210 PRIORITY: 1 PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… -$ Other $ 467,459 345,641 $ 471,384 $ 475,447 $ 1,759,931 $ TOTAL: $ 467,459 345,641 $ 471,384 $ 475,447 $ - $ -$ 1,759,931 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance $ 467,459 345,641 $ 471,384 $ 475,447 $ 1,759,931 $ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 467,459 345,641 $ 471,384 $ 475,447 $ - $ -$ 1,759,931 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Annual Water Tower Maintenance 146 - Small Capital Utilities Utility Services Inc. Scheduled painting and repair of the city's water towers.  This will include  a preventative maintenance schedule for each tower.  PICTURE OR MAP  182


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) -$ Professional Services: Design, Survey, Etc.… $ 500,000 $ 500,000 Other -$ TOTAL: $ - 500,000 $ -$ -$ -$ -$ 500,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement -$ Operational Contract Costs -$ Operational Personnel Costs -$ Other $ 500,000 $ 500,000 TOTAL: $ - 500,000 $ -$ -$ -$ -$ 500,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146 - Small Capital (Study) 2 Wastewater Conveyance Study Update To determine future needs for collection system improvements and  prioritize areas in need of upgrade and repair.  Projection of future flows  and area buildout potentials.  Also evaluate needs and prioritization for  flow equalization basins in the sewer collection system, pumping system  improvements and treatment capacity needs.  PICTURE OR MAP  183


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 79,000 $ 79,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 79,000 -$ -$ -$ -$ 79,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 79,000 $ 79,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 79,000 -$ -$ -$ -$ 79,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 620- Operational - Equipment 3 Additional Sewer Camera Equipment & Trailer System (Unit 327) Scheduled addition of second sewer camera equipment system. The planned addition of a second camera system will provide the ability to  perform more gravity sewer system inspections and maintenance.  Anticipated life span of this equipment is approximately 12 years. With  the age of existing equipment at 7 years a second system allows replacement equipment to be staggered every 6 years.  PICTURE OR MAP  184


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 20,000 $ 20,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 20,000 -$ -$ -$ -$ 20,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 20,000 $ 20,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 20,000 -$ -$ -$ -$ 20,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 620-Operating Captial (Equipment) 4 Replace Unit #303 - 2012 Ford F350 Truck Scheduled replacement of vehicle unit #303.  This vehicle has reached the  end of its optimum use.  This vehicle has 55,602 miles on it and 11.1 out  of 20 on the replacement points.     Funding rolled over from 2022 in the amount of $95,000 to make a total of $115,000 PICTURE OR MAP  185


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 35,000 33,000 $ 68,000 $ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 35,000 33,000 $ -$ -$ -$ -$ 68,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 35,000 33,000 $ 68,000 $ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 35,000 33,000 $ -$ -$ -$ -$ 68,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 5 Rebuild CD Effluent Pumps Scheduled rebuild or replacement of effluent pumps at the Compton  Drive Wastewater Plant.  PICTURE OR MAP  186


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 37,000 $ 37,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 37,000 -$ -$ -$ -$ 37,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 33,000 $ 33,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 33,000 -$ -$ -$ -$ 33,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) Rebuild CD Influent Pumps This is an ongoing preventative maintenance program to take scheduled  pumps out each year and send in for refurbishing.  including seals,  bearings, windings, etc. These pump are scheduled for rebuilds on seven  (7) year intervals. this project will assure future reliability. PICTURE OR MAP  187


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 80,000 80,000 $ 160,000 $ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 80,000 80,000 $ -$ -$ -$ -$ 160,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 80,000 80,000 $ 160,000 $ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 80,000 80,000 $ -$ -$ -$ -$ 160,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 7 Rebuild Cliff WTP High Service Pump Scheduled rebuild of Cliff Drive High Service Pumps. These Units are  scheduled for rebuild every 12 years to maintain efficiency and reliability. PICTURE OR MAP  188


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 180,000 $ 180,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ - 180,000 $ -$ -$ -$ -$ 180,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 180,000 $ 180,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ - 180,000 $ -$ -$ -$ -$ 180,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 8 Ground Water Well Service This internal service fund program is to set aside monies for rebuild or  replacement of groundwater well equipment for the City's 6 backup  groundwater wells. The City's groundwater wells are used as a backup  water supply to the City's surface water plants. Equipment in this  condition has a life expectancy of 10 ‐ 12 years.  PICTURE OR MAP  189


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 75,000 $ 75,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 75,000 -$ -$ -$ -$ 75,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 75,000 $ 75,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 75,000 -$ -$ -$ -$ 75,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 JCI Industries, Inc. Utilities 146-Small Capital (Equipment) 9 WS2301 Lift Station #17 Pump Rebuild/Replace As part of Utilities asset management lift station pumps from Lift Station  #17 will be removed on 6 year intervals for evaluation and rebuild  evaluation.  Pump replacement is anticipated after approximately 18  years of use.  PICTURE OR MAP  190


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 50,000 $ 50,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 50,000 -$ -$ -$ -$ 50,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 50,000 $ 50,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 50,000 -$ -$ -$ -$ 50,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 10 Odor Control Blowers Compton/Cooper Scheduled replacement of odor control blowers at the Compton Drive  and Cooper Creek Wastewater Plants to Maintain reliability of odor  control. PICTURE OR MAP  191


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 25,000 $ 25,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 25,000 $ 25,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 11 CD Wasteline Grinder Replacement The unit is used to shred any remaining plastics and other debris  contained in solids removed during the wastewater treatment process  prior to the material entering equipment used for biosolids dewatering  and drying. This project will reduce the amount of trash and debris  entering the treatment process causing damage to equipment and  interruptions in treatment.  These units are repaired and refurbished at  necessary intervals, however, additional repairs are not possible due to  age and wear. PICTURE OR MAP  192


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 125,000 155,000 $ 125,000 $ 125,000 $ 530,000 $ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 125,000 155,000 $ 125,000 $ 125,000 $ - $ -$ 530,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 125,000 155,000 $ 125,000 $ 125,000 $ 530,000 $ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 125,000 155,000 $ 125,000 $ 125,000 $ - $ -$ 530,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 JCI Industries, Inc. Utilities 146-Small Capital (Equipment) 12 WS2301 Lift Station Pump Rebuild/Replacement As part of Utilities Asset Management, approximately 10 Lift Station  Pumps will be removed annually for evaluation and rebuild. Rebuilds are  generally necessary every 7 years. Pump replacement is anticipated after  approximately 21 years of use. There are currently 72 pumps under this  program. PICTURE OR MAP  193


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 25,000 $ 25,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 50,000 $ 50,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 50,000 -$ -$ -$ -$ 50,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 13 Lift Station #21 VFD Rebuild/Replace Scheduled replacement of lift station 21 VFD. PICTURE OR MAP  194


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 75,000 $ 75,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 75,000 -$ -$ -$ -$ 75,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 75,000 $ 75,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 75,000 -$ -$ -$ -$ 75,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 620-Operating Capital (Equipment) 14 Replace Unit #147 - Portable Generator Scheduled replacement of a 2000 Olympian 3060 Portable Generator unit  #147.  This equipment has reached the end of its optimum use.  This  equipment has 904.7 hours on it.     Amount rolled over from 2022 for $75,000 making total capital amount for the project $150,000 PICTURE OR MAP  195


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 30,000 30,000 $ 60,000 $ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 30,000 30,000 $ -$ -$ -$ -$ 60,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 30,000 30,000 $ 60,000 $ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 30,000 30,000 $ -$ -$ -$ -$ 60,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Rebuild CC Aeration VFD's 15 146-Small Capital (Equipment) Utilities Scheduled replacement of VFD (Variable Frequency Drive) Unit(s) at the  Cooper Creek Wastewater Plant. These VFD's are used to control motor  speed and torque on the Aeration Drives at the Compton Drive Treatment  Facility. Replacement is necessary to maintain reliability. PICTURE OR MAP  196


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 45,000 $ 45,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 45,000 -$ -$ -$ -$ 45,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 30,000 $ 30,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 30,000 -$ -$ -$ -$ 30,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 32 Water System GPS Unit Survey grade GPS unit to capture point locations of new and existing  assets.    PICTURE OR MAP  197


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 165,000 165,000 $ 165,000 $ 165,000 $ 660,000 $ Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ 165,000 165,000 $ 165,000 $ 165,000 $ - $ -$ 660,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 165,000 165,000 $ 165,000 $ 165,000 $ 660,000 $ Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ 165,000 165,000 $ 165,000 $ 165,000 $ - $ -$ 660,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 16 Advanced Metering Infrastructure (AMI) System AMI equipment systems improve the process of collecting water meter  data and subsequent billing by providing staff and customers with  immediate access to current water usage. The objective is to provide the  most economical and reliable service to customers by providing timely  access to data in the home or business, allowing the residents and  businesses to better control usage. This will also improve operational  efficiency and reduce costs through prompt notification of leaks instead  of relying on single monthly meter reads.  Meters that fall within the 10  year replacement program will also be included in this cost. PICTURE OR MAP  198


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 25,000 $ 25,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 25,000 $ 25,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 22 CC DO System Replacement Maintaining and monitoring dissolved oxygen levels in secondary wastewater treatment is crucial to achieving the desired output: clean  water. We use a continuous monitoring process like the Industrial DO System to adequately measure and monitor the process. This will be a  scheduled replacement of the DO system. PICTURE OR MAP  199


PROJECT TITLE: PROJECT NUMBER: PRIORITY: PROJECT TYPE: DEPARTMENT/AGENCY: PARTNER ORGANIZATION - TYPE: (optional) PARTNER ORGANIZATION - NAME: (optional) Description Explain the project in detail including: - Geographic information such as cross-streets and landmarks - Specific details about the work being done - Cooperation State, County, City, or Private entity partners. - A brief description of the public good or service impact. Fiscal Year Estimated Cost 2023 2024 2025 2026 2027 Ongoing* Total Land/Property -$ Materials -$ Labor -$ Furniture, Fixtures, Equipment (FFE) $ 25,000 $ 25,000 Professional Services: Design, Survey, Etc.… -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Fiscal Year Annual Budget Impact 2023 2024 2025 2026 2027 Ongoing* Total Maintenance -$ Equipment Replacement $ 25,000 $ 25,000 Operational Contract Costs -$ Operational Personnel Costs -$ Other -$ TOTAL: $ -$ 25,000 -$ -$ -$ -$ 25,000 $ Additional Information (Optional) Include any project-specific details, such as special funding sources, or relation to other capital projects Project Manager Signature Date Department Director Signature Date *Ongoing future costs include all costs associated with the construction or operation of the asset for the life of the asset. Date: 1/26/2023 City of Branson, Missouri Annual Capital Project Funding Request Form: Fiscal Years 2023-27 Utilities 146-Small Capital (Equipment) 27 Cliff Drive Raw Water Basin Sealing The raw water concrete basins consist of Flocculation, Coagulation and  Sedimentation along with a poly aluminum chloride product which helps  in the aid of the before mentioned process.  There are 2 cliff wtp concrete basins are showing the same signs as the  meadows basins, 1 concrete basin is 56 years in age and the other is 37  years in age. The 2 basins have had some minor repairs in the years past,  but never by a professional contractor. PICTURE OR MAP  200