PCD-GTR-PGB PROJECT HSE DEPARTMENT 1
Project HSE Monthly Update
As of December 2019
On-behalf of PCD-PGB
Syahrir B Mohd Rozali
HSE Executive
PCD-GTR-PGB
© 2019 Petroliam Nasional Berhad (PETRONAS)
All rights reserved. No part of this document may be reproduced in any form possible, stored in a retrieval system, transmitted and/or disseminated in any form or by any means (digital, mechanical,
hard copy, recording or otherwise) without the permission of the copyright owner.
Internal
•
•
•
•
UAUC Observation Top 3
Safe : 387 UA : UC :
Unsafe Act : 70 1. 1.
Unsafe Condition : 80 2. 2.
3. 3
Unsafe Act.
- Workers found speeding at ROW. Action taken : Issue show cause letter
and remind workers during toolbox meeting
- Lifting in cramped area because lorry not available to move pipe spools
into site. (Plan and supervise the whole activity
Unsafe Condition.
ZeTo - General Waste left overloaded on dustbin for several days. Action :
Internal Create site office housekeeping schedule
- Muddy public road due to vehicle movement. Action : Prepare water jet
and perform water bowser at related area
2
(5,5) (0,0)
(62,36)
(12,6) (0,<0)
(12,6) (0,0)
(100,45)
(537, 536 (0,0)
(0,0) (0,0)
(0,0)
(0,0) Meeting
(0,0) target
(0,0) Not Accumulated UAUC Ratio FY2019
Meeting
target PD&T KPI 1 : 250
KPI
(actual, plan)
Actual FY 2019 1 : 170
Internal
3
PCD GTR HSE OBSERVATION BREAKDOWN HSE
- DECEMBER 2019 OBSERVATION - DECEMBER
Safe Act 2019
65%
Positive
Finding
71%
Unsafe Safe Procedure Reaction
Condition Condition & of People
15% 7% Orderlines 4%
s
Category Unsafe Act Personal
13% 11% Protective
Unsafe Act Equipment
Unsafe Condition Tools & Position Of
7%
Safe Act Equipment People
Safe Condition
4% 3%
TOTAL
70 Category 21
Reaction of People 36
80 Personal Protective Equipment
347 16
Position Of People 20
40 Tools & Equipment 62
Procedure & Orderliness 382
537 537
Positive Finding
TOTAL
Internal
4
No Project Man- YTD No. Top 3 UCUA
hours Man-hours of
UCUA
1
2 5
3
Internal
No Project Man- YTD No. of Top 3 UCUA
hours Man- UCUA
hours
Internal 6
Description Previous Dec 2019 Cumulative
Cumulative
General Site Audit / Inspection Pending 7
Safety & Health Committee 0
Meeting 0
HSE Management Walkabout
Functional Checklist ( Tier 1)
Behaviour Based Safety (BBS)
HSE Observation /UAUC*
*HSE Observation /UAUC Status
Description Open Status
Unsafe Action 70 Closed
70
Unsafe Condition 80 80
Safe Observation 347
Internal
No HSE Program Title Date Conducted
1 8
2
3
4
5
6
7
8
9
10
11
Internal
R&C Programme Deliverables & Performance 2019
LTI Free
Morning Board +
No Project TTT Date Greeting / Calendar Monthly HSE Love Letter Remark
Welcome Blast + Bulletin
Gate Touch The
Heart
1 TUAH Dec 19
2 TOPAZ Dec 19 R&C
Program
Started Nov
3 SWORP Dec 19
4 ROCKS Dec 19
5 GREAT Dec 19
Internal 9
R&C Programme Deliverables & Performance 2019
No Project Morning Greeting LTI Free Board + Monthly HSE Love Letter
/ Welcome Gate Calendar Blast + Bulletin
Touch The Heart
1 TUAH 3 3 06
2 TOPAZ 3 3 -3
3 ROCKS 1 1 --
4 GREAT P1 1 4 11
5 SHADOW 9 10 1 10
Internal 10
Date : 2.12.2019 Date : 8.12.2019
Prog. Title : Respect & Care ‘Love Prog. Title : Basic Occupational First Aid
letter to family’ Project: TOPAZ
Project: TOPAZ
11
Internal
Date : 24.12.2019 Date : 30.12.2019
Prog. Title : HSE Safe Manhours Prog. Title : Evacuation Drill
celebration Project: TOPAZ
Project: TOPAZ
12
Internal
Date : 16.12.2019 Date : 19.12.2019
Prog. Title : EX Tun Teja Table Top Prog. Title : Workers appreciation award
Project: TUAH and Mass tool box
Project: TUAH
Internal
13
Date : 16.12.2019 Date : 16.12.2019
Prog. Title : HSE Committee Meeting Prog. Title : Respect & Care Program
Project: TUAH Project: TUAH
Internal 14
Date : 20.12.2019 Date : 20.12.2019
Prog. Title : Respect & Care Program Prog. Title : Respect & Care Program
Project: GREAT P1 Project: GREAT P1
Internal 15
Date : 13.12.2019 Date : 26.11.2019
Prog. Title : CSR at Pusat Tahfiz Bukit Prog. Title : Drug & Alcohol Test
Rambai Melaka Project: ROCKS
Project: ROCKS
16
Internal
Thank you for your passion!
Internal 17