The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by aimanariff2211, 2024-02-26 06:12:00

TNB Renewable Energy Handbook A4

TNB Renewable Energy Handbook A4

Keywords: Renewable Energy Handbook

TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 43 appendiX 7


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 44 appendiX 7


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 45 appendiX 7


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 46 appendiX 8 *These forms are available at SEDA website summary of reppa forms Renewable Resource Forms Export/Installed (solar PV only) Capacity Biogas Form BG1 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of up to and including 10 MW and utilising biogas as its renewable resource Form BG2 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of above 10 MW and up to and including 30 MW and utilising biogas as its renewable resource Biomass Form BM1 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of up to and including 10 MW and utilising biomass as its renewable resource Form BM2 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of above 10 MW and up to and including 30 MW and utilising biomass as its renewable resource Small Hydropower Form HP1 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of up to and including 10 MW and utilising hydropower as its renewable resource Form HP2 Renewable energy power purchase agreement for a renewable energy installation having a net export capacity of above 10 MW and up to and including 30 MW and utilising hydropower as its renewable resource Solar PV Form PV1 Renewable energy power purchase agreement for a renewable energy installation having a rated kWp of up to and including 1,000 kWp and utilising solar photovoltaic technology as its renewable resource Supplementary Agreement PV1 For GST purposes Form PV2 Renewable energy power purchase agreement for a renewable energy installation having a rated kWp of above 1,000 kWp and up to and including 12,000 kWp and utilising solar photovoltaic technology as its renewable resource Form PV3 Renewable energy power purchase agreement for a renewable energy installation having a rated kWp of above 12,000 kWp and up to and including 30,000 kWp and utilising solar photovoltaic technology as its renewable resource


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 47 appendiX 9 appendix b of reppa


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 48 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 49 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 50 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 51 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 52 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 53 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 54 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 55 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 56 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 57 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 58 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 59 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 60 appendiX 9


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 61 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 62 appendiX 9 appendiX c of reppa


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 63 appendiX 9


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 64 appendiX 10 re application form


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 65 appendiX 10


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 66 appendiX 11 vendor master data form


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 67 appendiX 11


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 68 appendiX 11


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 69 appendiX 11


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 70 appendiX 12 PERMOHONAN METER BAHAGIAN 1 NAMA INDIVIDU / SYARIKAT / SERVICE PROVIDER : NO. KAD PENGENALAN / NO. SYARIKAT : ALAMAT INDIVIDU / SYARIKAT / SERVICE PROVIDER : NO. FAKS : NO. TEL PEJABAT / BIMBIT : BAHAGIAN 2 PARAS VOLTAN PENYAMBUNGAN (I/P) : 240V 415V 11kV 33kV KAPASITI (kWh) : Direct Indirect CADANGAN TARIKH MULA TUGAS : BAHAGIAN 3 NAMA FiAH : NO. APPLICATION : NO. FiAH : A BAHAGIAN 3 (DOKUMEN YANG PERLU DIMAJUKAN OLEH PEMOHON) SENARAI SEMAK Salinan Sijil FiAH (m/s 1 sahaja) Borang Makluman Awal (BMA) - untuk kapasiti > 60kWp dan ke atas Borang "Customer Vendor Data" Vendor sediada Permohonan Baru Saya / Kami dengan ini memberi pengakuan bahawa makluman yang diberikan adalah benar. * Dokumen Lengkap Nota * Perlu ditandatangan oleh Pemohon / Nama / Syarikat / Jawatan / Alamat * Sila majukan borang permohonan ini kepada Encik Zulkafli Ismail atau Puan Zanariah Zakaria KEGUNAAN PEJABAT metering application form


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 71 appendiX 13 customer master data form


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 72 appendiX 13


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 73 appendiX 14 self billing agreement 1 “Self- Billing Agreement” This is an agreement to a self-billing procedure for Renewable Energy Power Purchase between: Recipient Name: TENAGA NASIONAL BERHAD GST Identification Number: 001107427328 The Recipient agrees: 1. To issue self-billed invoice for all supplies made to him by FiAH until ___/___/____ (insert either specified period that shall end no later than either the expiry date of a period of twelve (12) months OR the expiry date of the contract between the customer and FiAH); 2. To issue self-billed invoice showing the FiAH’s name, address, GST identification number and other details that make up a full tax invoice; 3. To inform FiAH if the issuance of self-billed invoice were to be outsourced to a third party, such as an accounting firm or tax agent, by giving details of the third party; 4. To make new self-billing agreement, in the event that their GST identification number changes; and 5. To notify FiAH if he ceased to be registered for GST, transfer his business as a going concern, or becomes registered under new GST identification number. FiAH agrees: 6. To accept self-billed invoice issued by the Recipient for supplies covered by the agreement on his behalf until ___/___/____ (insert either specified period that shall end no later than either the expiry date of a period of twelve (12) months OR the expiry date of the contract between the customer and FiAH); 7. To not issue GST invoice for supplies covered by the agreement; and 8. To notify customer if he ceased to be registered for GST, transfer his business as a going concern, or becomes registered under new GST identification number. Signed by: On behalf of: Date Signed by: On behalf of (FiAH Authorized Representative/Owner): Date: FiAH Name: FiAH Number: GST Identification Number:


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 74 appendiX 14 “CHECKLIST FOR DOCUMENTS TO SUBMIT TO TNB” Please tick ( ) 1. Certified True Copy of GST Registration Certificate from Royal Malaysian Customs Department (certified by Commissioner of Oaths/Company Secretary/ A Class Government Officer/ Village Headman/ TNB Executive) 2. Signed ‘Self-Billing Agreement’ (with Item 6 completed)


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 75 appendiX 14


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 76 appendiX 15 LIST OF REVENUE METER AND COSTs


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 77 appendiX 16 Standard Wiring and Installation for the LV Connection of Revenue Meter


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 78 BORANG MAKLUMAT AWAL PERJANGKAAN BESAR PROJEK TENAGA BOLEH BAHARU (RENEWABLE ENERGY) Stesen TNB Berkaitan Tarikh Maklumat Projek Syarikat Perunding Syarikat Kontraktor Elektrik Nama Alamat No. Telefon No. Faksimili Maklumat Bekalan Elektrik Yang Akan Disambungkan Kepada Grid TNB Kapasiti Ekspot (MW) Yang Diluluskan Oleh Sustainable Energy Development Authority (SEDA) Cadangan Nisbah Alatubah Arus Bilangan Pembekal (Feeder) Paras Voltan Sambungan Ke Grid TNB (415 V / 11 kV / 33 kV) Cadangan Commercial Operating Date (COD) Lain - lain Maklumat Disediakan Oleh: Diperakukan Oleh: ________________________ _____________________________________________ (Wakil Pemaju Projek) Eksekutif Seksyen Tenaga Diperbaharui & Teknologi Hijau Jabatan Perkhidmatan Pengguna & Pemasaran Bahagian Pembahagian, TNB Nama Pemaju Projek Alamat Tapak Projek appendiX 17 PRE-SUBMISSION FORM FOR MV METER


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 79 appendiX 18 a SAMPLE OF METER APPROVAL letter


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 80 appendiX 18


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 81 appendiX 19 T&C APPLICATION FORM


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 82 appendiX 19


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 83 appendiX 19


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 84 appendiX 20 T&C Meter form NAMA PELANGGAN/PKG: KOD STESEN TARIKH PEMERIKSAAN NO. AKAUN: JAM MULA: ALAMAT PREMIS: JAM TAMAT: MAKLUMAT JANGKA KATEGORI JANGKA NO. SIRI JANGKA BUATAN / MODEL BACAAN KWH (IMPORT) BACAAN KWH (EKSPORT) VOLTAN KATEGORI JANGKA NO. SIRI JANGKA BUATAN / MODEL BACAAN KWH (IMPORT) BACAAN KWH (EKSPORT) UJIAN KEJITUAN JANGKA (JIKA PERLU) JUMLAH ARUS MASA KIRAAN MASA SEBENAR % RALAT JENIS SAMBUNGAN SISTEM PV: SAMBUNGAN LANGSUNG PENGUJIAN DI JANGKA PV MERAH V A A KUNING V A A BIRU V A A LOKASI JANGKA PV SEBELAH JANGKA TNB / TEMPAT LAIN - ANGGARAN JARAK (METER): PENGUJIAN 'ANTI-ISLANDING': (BEKALAN TNB DIPUTUSKAN) : saat; (BEKALAN TNB DISAMBUNG SEMULA): MINIT BEKALAN ELEKTRIK DISALUR KE PREMIS DARI PENCAWANG: PERAKUAN TANDATANGAN NAMA NO I/C ATAU NO PEKERJA TARIKH PEMASANG PV / FIAH WAKIL TNB WAKIL TNB HQ OPC KRIZIK ARUS PAPARAN/KELUAR BORANG PEMERIKSAAN DAN MULATUGAS (T&C) JANGKA TENAGA BOLEH BAHARU SOLAR PV (OPC & LPC) MAKLUMAT PEPASANGAN SAMBUNGAN DAN PERJANGKAAN SOLAR PV JANGKA SOLAR PV 240V / 400V PENGESAHAN PENGUJIAN & MULATUGAS SISTEM SOLAR PV KE SISTEM GRID VOLTAN RENDAH TNB VOLTAN FASA KE NEUTRAL ARUS MASUK LPC MERAH KUNING BIRU SAIZ ALATUBAH ARUS


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 85 appendiX 21 T&C PROCESS FOR LV


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 86 appendiX 22 Apply for PSS PSS approval FiT certificate issued by SEDA Sign REPPA Kick-off meeting SLD approval BMA/Shop drawings approval Factory Acceptance Test Shutdown Coordination + finalise IOM + IOD preparation Pre-commissioning tests IOD checklist / PQ pre IOD Commissioning/IOD Reliability Run / PQ post IOD Release IOD confirmation FiTCD NOTE : FiAH is allocated 2 meetings with TNB Meeting #1 HQ Kawasan/ Negeri HQ Kawasan/ Negeri HQ RCC Meeting #2 MV INTERCONNECTION PROCESS


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 87 appendiX 23 FIAH NAME: LOCATION OF DEVELOPMENT: NET EXPORT CAPACITY: kW / kWp M&E CONSULTANT: M&E CONTACT NO. 1. Notification letter for IOD (not less than 14 days) to TNB attached with complete documents 6. Attach the details and test results of interconnection facilites: a) Electrical protection scheme b) Protection Coordination Study for DG Plant c) cable test result (if applicable) d) Overhead test result (if applicable) e) SCADA (if applicable) f) VCB dan DC system test results g) Calibration Certificate for testing equipments used h) G & H forms (requested by Electricity Supply Act 1990) 7. Metering Installation: a) A copy of Borang Maklumat Awal Perjangkaan Besar approval letter b) A copy of payment receipt for purchasing the meter(s) 8. Handover document for substation & land (if any): a) Borang A and Borang TNB 229 b) Pre-comp plan (substation lot etc) c) Bank Guarantee RM 20k 9. Copies of all authorities approval letters; a) FiT certificate By SEDA Malaysia b) Permanent Generation License By Suruhanjaya Tenaga c) A copy of stamped REPPA between TNB and FiAH d) Right of Ways for poles and/or cable routes By Local Authorities 10. Attach schedule of RE generation (kWh) on hourly basis from IOD to FiTCD (not less than 7 days) 11. Written confirmation by TNB station on the satisfactory of site works and none oustanding issues Herewith, we verify that the above documents have been submitted and received by TNB Name: Name: Name: Date: Date: Date: ------------------------------------- --------------------------------------- --------------------------------------- 5. Attach the acceptance test result, Factory Acceptance Test and laboratory test result for anti-islanding of installation to TNB/SEDA (prepared by qualified person/authority) Prepared by: (FiAH) Checked by: (TNB - RE&GT) Verified by: (TNB - RE&GT) CHECKLIST FOR INITIAL OPERATION DATE (IOD) FOR RENEWABLE ENERGY PROJECT 2. A certificate from a qualified person stating that interconnection facilities have been designed and constructed in accordance with Prudent Utility Practices 3. Attach a copy of as-built drawing of RE installation and Interconnection facilities 4. Attach a final copies of Interconnection Operation Manual (IOM) agreed by TNB RE CATEGORY: Solar / Biomass / Biogas / Hydro FiT APPLICATION NO. CHECKLIST FOR IOD


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 88 appendiX 24 METERING CHECKLIST FOR IOD No. By Contractor Check By Supervisor Pass Fail Remarks 1 Location for metering panel 2m x 2m metering room 2 Distance of armour cable from customer switchgear to metering panel ≤ 30 meters use 2.5mm 12 core cable > 30 meters use 4mm 12 core cable 3 Cable must be exposed and to be laid on cable tray (not in cable trench) Must be visible and firm 4 Metering kiosk must be mounted firmly on the ground Check the space of metering panel and make sure there is enough space to work at the back of the panel 5 Install a 13A socket on top of the metering kiosk On top of metering kiosk for modem 6 Make sure armour cable must be gland using metal gland Gland size e.g 256 using only metal gland 7 Make sure armour cable is long enough at the metering panel and at the back of the switchgear (at least extra by 2 meters) Direct termination from PT & CT to meters at the metering kiosk 8 CT must be tested with indication of CT size Confirm CT size 9 Close any extra holes at the metering kiosk Use only metal plate or fiber board and inform the contractor 10 Fix bolt with holes for seal wire For sealing a CT and PT compartment for at least 6 bolts with holes


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 89 appendiX 25 A SAMPLE letter OF COMPLETED METER INSTALLATION (Pembangunan Tenaga Lestari)


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 90 appendiX 26 FiAH RE PLANT TNB Substation Solar PV panels Inverter Export Meter 0.4 kV 0.4 kV Capacity >250kWp = ~ Load 11/0.4 kV 11 kV Meter Kiosk A B TNB Connection Point (Existing or New FP) LV BOUNDARIES OF OWNERSHIP AND OPERATION


TENAGA NASIONAL BERHAD | TNB Renewable Energy Handbook 91 appendiX 27 INTERFACING REQUIREMENTS: a) VCB at connection point b) Protection relays on TNB side: CD, OCEF, RPR c) Energy Meter d) Interlocking scheme e) SCADA for > 2MW f) Anti-islanding g) Synchronisation check Items d , f & g are to be provided on FiAH side NOTE: Switchgears to match existing model & configuration Inclusive of control panel includes interfacing Switchgears includes SCADA/RTU interface All relays are of TNB approved list Metering CT ratio to be determined based on declared output MV BOUNDARIES OF OWNERSHIP AND OPERATION


TNB Renewable Energy Handbook | TENAGA NASIONAL BERHAD 92 appendiX 27


Click to View FlipBook Version