Driftwood LNG is a liquefied natural gas (LNG)
project proposed for southwest Louisiana. It includes
a 26 million tonnes per annum (mtpa) production
and export facility located on approximately 1,000
acres south of Lake Charles near Carlyss, on the
west bank of the Calcasieu River. It also includes a
proposed 96-mile long pipeline that will deliver
natural gas to the export facility by connecting with
existing interstate pipeline systems near Ville Platte.
1
Tellurian is a group of experienced industry experts who have teamed
up with world class providers to develop LNG projects along the
United States Gulf Coast.
INDUSTRY
EXPERTS
2 A TELLURIAN INC. COMPANY
We are focused on
the competent and
safe development of
Driftwood LNG
EXPERIENCE
MATTERS
Our team has extensive LNG (engineering), Chart Industries
experience. We have worked on (liquefaction) and GE (natural gas
13 LNG projects in use today. In turbines). All three companies
addition to our own expertise, are respected in their field and
our team also includes trusted committed to safety and the
and established providers. environment.
We are working with Bechtel
3
We are leveraging our provider
relationships with a fully wrapped
EPC contract to help establish a
new global standard for low-cost
production. Our predictable
cost makes our LNG extremely
attractive to potential buyers.
RELATIONSHIPS
MATTER
We view our A TELLURIAN INC. COMPANY
providers as
partners
4
Helping to establish
a new global
standard for low-cost
production
Bechtel is a world leader in the
LNG industry and has built 41
trains producing 120 mtpa to
date. Our founders have a deep
relationship with Bechtel having
worked together on projects such
as Cheniere’s Sabine Pass and
Corpus Christi LNG; and for BG
Group, Queensland Curtis LNG,
Atlantic LNG and Egyptian LNG.
Chart Industries is a world-
class cold box manufacturer;
Driftwood LNG is using the
proprietary liquefaction process.
GE Oil and Gas has over 25 years
of experience in LNG technology.
Their expertise has delivered
refrigerant compressors and
turbines for some of the
world’s largest projects.
5
The facility is being designed to Pre-cooled Single Mixed
produce up to 26 million tonnes Refrigerant (IPSMR), which is
per annum (mtpa) of LNG, from being used in other facilities
five plants. Each plant is made worldwide and provides for
up of one gas pre-treatment unit significant efficiencies. We are
and four liquefaction units, each also using another Chart product
producing 5.2 mtpa. Our design – cold boxes – which are a key
is simple and the scale allows us component of liquefaction.
to use standardized, world class Chart manufactures some of their
equipment that is already proven liquefaction cold boxes in
to be safe SAFETY,
and reliable.
In addition,
our modular
approach
RELIABILITYuses multiple
production & COST
units to MATTER
enhance
reliability
while
providing
smaller amounts of LNG. This New Iberia, Louisiana. Our gas
gives us flexibility when selling turbine refrigeration compressors
the product, thus expanding from General Electric are proven
commercial opportunities. safe, efficient and effective, and
We are using a well-researched have been in use for decades in
and proven liquefaction LNG and a variety of industries.
technology called Chart
Industries’ Integrated
6 A TELLURIAN INC. COMPANY
Illustration of Driftwood LNG facility
SITE
SELECTION
One of the considerations we 235,000 m3 full containment LNG
used in selecting our facility storage tanks, and three marine
site was good land space and loading berths designed to work
the excellent marine access and with LNG ships up to 216,000 m3.
water depth. On the site we will
have the facility as well as three
7
The proposed 96-mile long
pipeline is being designed to
deliver 4 billion cubic feet daily
(Bcf/d). It consists of:
• 74 miles of single 48-inch
diameter pipeline
• 11 miles of single 42-inch
diameter pipeline
• 11 miles of single 36-inch
diameter pipeline
• 3.5 miles of
36-inch diameter pipeline
lateral
• 3 compressor
stations
PROPOSED• Upto15
meter stations
PIPELINE &andassociated
tie-ins at up to
13 sites
Proposed pipeline route
8 A TELLURIAN INC. COMPANY
Find more information
on the Driftwood LNG
project by visiting
www.ferc.gov
Proposed project timeline
& PROJECT 2016 June FERC Pre-Filing
TIMELINE Review Process
2017 Q1 FERC
application filing
We are in the early days of planning and have 2018 Construction begins,
received approval from The Federal Energy 2022 pending regulatory
Regulatory Commission (FERC) on our approval
pre-filing request (Docket No. PF16-6-000).
Please visit www.ferc.gov for more details. First LNG plant
operational
2023
Full pipeline
operations
2025 All LNG plants
operational
9
Our project will bring temporary Louisiana before on various
jobs during construction and projects, and want to continue to
400 jobs during operations. We be part of the community. We will
intend to use local resources as be looking for ways to invest in
much as possible. and enhance other projects that
benefit the area.
Driftwood LNG will also generate
local and state tax revenues in
Louisiana. We have worked in
COMMUNITY
&INVESTMENT
We intend to use
local resources as
much as possible
10 A TELLURIAN INC. COMPANY
Driftwood LNG community open house
& INVOLVEMENT
IN LOUISIANA
Our Project website:
www.driftwoodlng.com
Connect The general inquiry toll-free number:
with us +1 888 321 7260
Our email address:
[email protected]
11
FERC site visit
ABOUT
DRIFTWOOD
LNG
Driftwood LNG is sponsored United States Gulf Coast. The
by Tellurian Inc. Tellurian was team delivers results using a
founded by Charif Souki and repeatable and simple design,
Martin Houston, and is led by off-the-shelf equipment and
President and CEO Meg Gentle. multiple production units to
They are underpinned by a enhance reliability. Tellurian
group of experienced industry has best-in-class providers as
experts developing low- partners – Bechtel is the EPC
cost, liquefied natural gas contractor, Chart is providing the
(LNG) projects along the liquefaction technology and GE is
12 A TELLURIAN INC. COMPANY
Our simple facility
design enhances safe,
reliable, low-cost
delivery of LNG
A NOTE Tellurian became a public company on
February 10, 2017 it is traded on the
NASDAQ as TELL
supplying the turbines. committed to using best practices
The team has delivered cost- for the safety of the community
leading LNG projects over more and environment throughout the
than 50 years and they focus development of this project.
that collective knowledge and
expertise on establishing a new
global standard for low-cost LNG.
Leaning on combined expertise,
knowledge of the community and
regulatory process, DWLNG is
13
Three 235,000 m3
storage tanks
Five LNG plants FAST
each have one FACTS
gas treatment
unit and four
liquefaction units
Up to 26 million
tonnes of LNG will be
produced every year
14 A TELLURIAN INC. COMPANY
$13 – 16 billion in
estimated construction
cost investment
400 new Illustration of Driftwood LNG facility
permanent
jobs during 96-mile
operations feed gas
pipeline
15
1201 Louisiana Street
Suite 3100
Houston, TX 77002
Phone: +1 832 962 4027 or +1 888 321 7260 (toll-free)
Email: [email protected]
www.driftwoodlng.com
A TELLURIAN INC. COMPANY