14.06.21 4. Perhitungan BBS

14.06.21 4. Perhitungan BBS

PERHITUNGAN BBS

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 1

KALKULASI BBS 2

Setelah selesai membuat Shop Drawing BBS,
dilanjutkan dengan tahap Kalkulasi / tonage
BBS. Berat tulangan besi dihitung berdasarkan
peraturan yang berlaku di Indonesia yaitu
Standar Nasional Indonesia ( SNI 2052 2017 Baja
Tulangan Beton ) yang dikeluarkan oleh Badan
Standarisasi Nasional (BSN)

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

KALKULASI / CUTTING LIST BBS 3

Kalkulasi Tonage besi dilakukan dengan cara :
1. Input / entry data secara manual tiap detail tulangan ke dalam Program BBS 2010

( berat tulangan per-diameter sudah otomatis sesuai SNI ) untuk Program
AUTOCAD / G-STAR
• Hitung panjang potong sesuai pengurangan / deduction besi mulur /

memanjang karena adanya tekukan atau kait.
• Tonage panjang potong ( input / entry data panjang potong ) untuk Order

Besi, Opname Mandor & Sub-kon Besi.
• Tonage panjang aktual ( input / entry data panjang aktual ) untuk Remeasure

& progress ke Owner sesuai panjang terpasang.

2. Report Program - Kalkulasi sudah otomatis ( berat diameter sudah otomatis
sesuai sesuai SNI ) untuk :
• Program AUTOCAD - AUTOREBAR
• Program REVIT- GRAITEC

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

METODE PEMBUATAN BBS di TOTAL 4

1. AUTOCAD 2D + Excel BBS 2010
▪ Shop Drawing BBS : Auto Cad 2D
▪ Cutting List : File Excel BBS 2010
▪ Monitoring & Waste : File Cutting List 2010

2. Auto Rebar 2D + Excel Waste Besi 2020/RADAN
▪ Shop Drawing & Cutting List BBS : Auto Rebar 2D
▪ Monitoring & Waste : File Excel Waste Besi 2020 / RADAN

3. Graitec Revit 3D + Excel Waste Besi 2020/RADAN
▪ Shop Drawing & Cutting List BBS : Graitec Revit 3D
▪ Monitoring & Waste : File Excel Waste Besi 2020 / RADAN

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

SOFTWARE BBS - AUTOREBAR

ADD INS UNTUK REBAR

AutoCAD 2013 -> 2021 compatibility. 5
https://www.autorebar.com

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

SOFTWARE BBS - AUTOREBAR 6

CUTTING LIST

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

SOFTWARE BBS - AUTOREBAR

CUTTING LIST KE FILE EXCEL

Hasil schedule dari AUTOREBAR Hasil export

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 7

SOFTWARE BBS - AUTOREBAR 8

EXCEL (AUTOREBAR) KE BBS EXCEL 2020

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

BIM Tools-rebar 9

BIM Modelling / Authoring
Coordination
Simulation
Detailing
Scanner
Etc

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

SOFTWARE BBS - GRAITEC

APLIKASI
SOFTWARE
ADD INS REVIT

GRAITEC DETAILING

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 10

SOFTWARE BBS - GRAITEC EXPORT KE RADAN FOR
EXCEL WASTE REBAR
MODEL STR DI REVIT

MODEL REBAR DI
REVIT/GRAITEC

SCHEDULE CUTTING LIST

SHOP DRAWING /SCHEMA
REBAR

EXPORT KE AUTOCAD

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 11

PERHITUNGAN WASTE 12

Perhitungan Waste dilakukan dengan 2 cara yaitu :
1. Waste Design :

▪ Autorebar/Graitec + Monitoring Waste 2020 dari Tonage BBS
▪ Autorebar/Graitech + Program RADAN ( program Waste otomatis )

2. Waste Aktual : Monitoring BBS Proyek ( Form PC) dari
▪ Surat Jalan Material besi datang / SPN
(Data besi stock lonjoran / 12 m)
▪ Data besi terpotong / cutting
▪ Data Besi terfabrikasi
▪ Data Besi terpasang / install
▪ Data Besi stock / sisa potong

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD

MONITORING BESI
PROYEK

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 13

MONITORING BESI PROYEK

Monitoring Besi dibuat dengan tujuan untuk mengetahui, memonitor /
mengontrol semua kegiatan operasional pembesian dan selanjutnya
bisa dilakukan evaluasi / analisa serta antisipasi / upaya solusi /
pemecahan bila terjadi masalah. Jadi Monitoring dilakukan agar
kesalahan awal dapat segera diketahui dan dapat dilakukan tindakan
perbaikan, sehingga mengurangi resiko yang lebih besar

Monitoring Besi Proyek yang dipakai adalah Form yang diterbitkan oleh PC,
dimana Engineering (BBS/SE) wajib mengisi tonnage / berat besi semua item
pekerjaan sesuai BBS dan membandingkan tonnage / berat besi Bill of
Quantity / BQ Tender. Bila terjadi perbedaan, maka Proyek wajib meng-
analisa & menginformasikan penyebab perbedaan yang terjadi ke Pusat

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 14

MONITORING BESI PROYEK CONTOH

Proyek Padma Semarang Note
Periode Laporan Input / Isi
Cut Off Data Opname Automatic formula
Cut Off Data Material
PIC : BBS/ENGINEERING PIC : QS/COMMERCIAL PIC : GUDANG/LOG
GROUP TOWER
INFORMATION TENDER - FORCON REALISASI TERPASANG MATERIAL
STRUKTUR Tower [H] [I]
STRUKTUR Tower [A] [B] [C] = A-B [C/A] [D] [D/B] [E] [E/B] [F]=D+E [F/B] [G] [J]=G-H-I-F
STRUKTUR Tower RC [Tender] - OPNAME OPNAME TERPASANG Datang
STRUKTUR Tower LOCATION WORK CODE ITEM CODE BBS [Forcon] - RC-BBS [kg] RC-BBS [%] ADJUST TERPASANG Stock Fabrikasi Waste
STRUKTUR Tower kg [kg] [%] [%]
STRUKTUR Tower Basement 2 kg 99.50% [kg] ADJUST [%] [kg]
STRUKTUR Tower Basement 2 401,821.06 398,000.00 100.00% 100.00%
STRUKTUR Tower Basement 2 Pilecap Pek. Pembesian 86,525.18 400,000.000 1,821 0.45% 87,000.00 2,000 0.50% 400,000 100.00%
STRUKTUR Tower Basement 2 323,224.07 99.59%
STRUKTUR Tower Basement 2 Basement wall Pek. Pembesian 87,000.000 (475) -0.55% 10.22% - 0.00% 87,000
STRUKTUR Tower Basement 2 291,359.57
STRUKTUR Tower Basement 2 Balok Pek. Pembesian 271,421.45
STRUKTUR Tower Basement 2 17,079.60
STRUKTUR Tower Basement 2 Pelat Pek. Pembesian
STRUKTUR Tower Basement 2 8,139.61
STRUKTUR Tower Basement 1 Kolom Pek. Pembesian 14,677.82
STRUKTUR Tower Basement 1 31,964.49
STRUKTUR Tower Basement 1 Shear wall Pek. Pembesian 48,064.00
STRUKTUR Tower Basement 1 75,992.30
STRUKTUR Tower Basement 1 Tangga Pek. Pembesian 213,787.77
NSTORNUPKRTEULRIM ATollwer Basement 1 156,839.12
NSTORNUPKRTEULRIM TAollwer Basement 1 Ramp Pek. Pembesian 247,853.93
PSTRREULIKMTUR ATollwer Ground Floor 21,898.52
PSTRREULIKMTUR TAollwer Ground Floor GWT, STP, Grease TPraepk,. SPuempbePsitan 22,085.11
PSTRREULIKMTUR TAollwer Ground Floor 23,797.30
PSTRREULIKMTUR TAollwer GAlrlound Floor Struktur Lift (ProvSumP)ek. Pembesian 328,554.74
SPTRREULIKMTUR ATollwer AGlrlound Floor 221,062.55
SPTRREULIKMTUR TAollwer AGlrlound Floor Basement wall Pek. Pembesian 216,484.24
SPTRREULIKMTUR ATollwer LAallntai 1 28,330.95
STRUKTUR Tower LAallntai 1 Balok Pek. Pembesian 14,594.57
LAallntai 1 138,000.00
ALallntai 1 Pelat Pek. Pembesian 208,318.61
ALallntai 1 228,558.12
LAallntai Mezzanine Kolom Pek. Pembesian 73,660.83
Lantai Mezzanine 12,297.81
Shear wall Pek. Pembesian 4,374.30
21,352.22
Tangga Pek. Pembesian 17,224.62

Ramp Pek. Pembesian

Balok Pek. Pembesian

Pelat Pek. Pembesian

Kolom Pek. Pembesian

Shear wall Pek. Pembesian

Tangga Pek. Pembesian

SMtreutokdtuer ?L?ift (ProvSumPP)eekk.. KPaekmi bAeysaiman
BMaelotokde ?? PPeekk.. SPteompbceosrian
PMeelatotde ?? PPeekk.. RPeemlatbesian
TKoowloemr Crane PPeekk.. PPeemmbbeessiiaann Pondasi TC
SShaefeatyr wall PReakil.linPgembesian
JTaalnagnga PPeekk.. PPeemmbbeessiiaann Jalan sementara
BLiasltorikk kerja PTieakn.gPLeammbpeusian
Pelat Pek. Pembesian
SKM SKM Input

4,746,715.48 487,000 1,346 0.28% 485,000 2,000 0.41% 487,000 100.00% 30,000 3,650 200 (460,850)
10.26% -94.63%

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 15

MONITORING BESI PROYEK CONTOH

Monitoring Besi Per Lantai Monitoring Besi Per Elemen

Values Values

GROUP TOWER LOCATION _RC [Tender] - kg _BBS [Forcon] - kg GROUP WORK CODE _RC [Tender] - kg _BBS [Forcon] - kg
STRUKTUR Tower
Basement 2 1,494,276.84 487,000.00

Basement 1 762,254.04 STRUKTUR Balok 1,364,274.92

Lantai 1 527,209.67 Basement wall 162,517.47 87,000.00

Lantai 2 155,488.05 Kolom 1,043,230.03

Lantai 3 88,212.74 Pelat 1,151,028.15

Lantai 4 93,458.01

Lantai 5 87,235.36 Ram p 38,475.11

Lantai 6 92,954.99 Shear wall 117,398.46

Lantai 7 86,760.49 Tangga 76,646.93

Lantai 8 112,897.65 Pilecap 401,821.06 400,000.00

Lantai 9 81,953.40

Lantai Atap 5,115.48 GWT, STP, Grease Trap, Sump Pit 31,964.49

Ground Floor 947,027.05 Struktur Lift (ProvSum) 186,064.00

Lantai Mezzanine 38,576.84 External 173,294.85

Tower Total 4,573,420.62 487,000.00 STRUKTUR Total 4,746,715.48 487,000.00
External
Pondasi Canopy 15,266.03
External Total
Dinding Penahan tanah 158,028.82 PRELIM Jalan
All
All Total 173,294.85 Listrik kerja

STRUKTUR Total All 4,746,715.48 487,000.00 Metode ??
PRELIM All Total
All Safety
PRELIM Total (blank)
NON PRELIM (blank) Total Tower Crane

NON PRELIM Total All PRELIM Total
(blank)
NON PRELIM (blank)
(blank) Total
Grand Total (blank) NON PRELIM Total

(blank) (blank)

(blank) Total

4,746,715.48 487,000.00 Grand Total 4,746,715.48 487,000.00

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 16

DISCUSS AND Q&A

MONITORING /
EVALUASI
MASTER
SCHEDULE

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 18

S CURVE
(KURVA S)

Copyright © 2020 Total Construction Institute. All rights reserved. In collaboration with Dept. CERD 19

MoreInformation

Dept. ATC
+62 21 2297 8775
[email protected]
elearningtci.totalbp.com

20


Click to View FlipBook Version