1

Preamble

Coal India Limited, A Maharatna Company and the largest coal producer as well,
has the huge responsibility in energizing the Nation and to play a crucial role in the
economic growth of the Country. Coal India produced 494.2 Million Tonnes of coal
during 2014-15. This was the biggest ever growth of about 7% in the last 22 years.
Even after coming closer to the magical figure of 500 Million Tonnes, the role and
responsibility of Coal India Limited is much bigger, as Government of India has set a
target of achieving 1 Billion Tonnes of coal production by 2019-20. This is in view of
growing demand of Power Sector and the mission of Government of India to provide
24x7 power supply to each and every household of our Country. The above target is
more than the double of present coal production, which means making a parallel Coal
India Limited in next five years.

Accordingly WCL has revisited its earlier long term projections and set forward
the path to enhance its output to 60 Million tonnes and beyond i.e. 50 % growth over
present level. Such paradigm shift in strategic planning does require opening of new
projects in WCL which was the only way forward. WCL has already opened 10 new
projects with a combined capacity of 20.59 Mty in 10 months. The future programme of
WCL to open 36 Projects in 36 Months reflects WCL’s aspirations to achieve its output
of 60 Million Tonnes and beyond.

1

2

Profile

Western Coalfields Limited (WCL) is one of the Eight Subsidiary Companies of
Coal India Limited, contributing about 10% of the national coal production.

The company came into existence on 1st November, 1975, after re-organization
of the Nationalized Coal Industry. At that juncture, the operations of WCL were spread
over in the States of Maharashtra, Madhya Pradesh and Orissa, organized into 2
Divisions and 12 operational Areas. By the year 1985-86, the number of mines in WCL
had increased to 130 and the total production to 48.89 Million Tonnes from the then
WCL.

Keeping in view the tremendous growth programme, the Company was
bifurcated, with effect from January 1986, into South Eastern Coalfields Limited and the
present Western Coalfields Limited (WCL). The present WCL has mining operation
spread over in the States of Maharashtra (in Nagpur, Chandrapur & Yeotmal Districts)
and in Madhya Pradesh (in Betul and Chhindwara Districts).

2

3

Turn Around Story

WCL’s production reached at its maximum level of 45.74 Million Tonnes in 2009-
10 but it got reversed there from registering negative growth year on year basis and was
39.73 MT in 2013-14.The reason for negative growth was non viability of projects, very
less possession of land, old equipment, depleting reserves, adverse geo-mining
condition etc.

Due to centralized location of its mines, demand of coal from WCL has been
always higher than its resources resulting in extraction of viable reserves at a faster
rate. The company was unable to open new projects to match the demand. WCL had 42
unviable projects approved subject to consumer/s agreeing to cost plus price. The
procedure of finalizing consumer and higher priced coal of these unviable projects
further delayed opening of new projects. Consumers were reluctant to source their
requirement through these cost plus projects. The reluctance was mainly due to higher
price of coal and provisions of Model Cost Plus Agreement document .Thus the
production of the company started declining from 2010-11 onwards.

The challenge before WCL was not only to plan for a growth of 50% from level of
about 40 MT to 60 MT but also to maintain production from existing mines, having
depletion of about 20 MT production in coming 5 years, through
Expansion/Replacement Projects.

Flagship Initiatives taken for opening of Projects

 WCL took an initiative for revision of existing guidelines of cost provisioning in
Project Reports with CMPDIL & CIL and accordingly modification of cost
provisioning in PR for CIL projects were approved by CIL

 Relaxation in provision of Bank Guarantee to power producing
companies/consumers for cost plus projects

 Re-organization of smaller projects into amalgamated projects wherever feasible
so as to make them viable on notified price

3

4

 Trust building initiatives with land owners to break the shackles in land
acquisition, payment of enhanced land rates and suitable change in modalities in
policies

 Relaxation of River Regulatory Zone (RRZ) Policy 2006 of Government of
Maharashtra for opening / expansion of stalled projects located near rivers.

 Timely action and monitoring for obtaining Environmental and Forestry
Clearances for projects

 Activity-wise Time line of each & every project with fixation of date of
commissioning

 A road map for opening new projects within command Area. Initiated with task of
commissioning 24 projects in 24 months.

 Rigorous Project monitoring for scheduled implementation through on line
systems.

Trust building measures for Physical Possession of Land

On making the roadmap 24 viable projects,the major bottleneck was non
availability of land in possession of the company.This was due to several critical issues
such as higher compensation demand, lack of trust, bottleneck norms, lack of
cooperation/coordination among the stakeholders, etc.

For resolving these bottlenecks, there was a need for a change in approach to
take care of the interest of the Project Affected Persons (PAPs) on one hand and the
progress of the Company on the other. In order to meet this challenge, it was necessary
to start consultations with the stakeholders to chalk out the strategies for tackling the

situation.

4

5

Core issues

 Landowners demanding higher land compensation and Rehabilitation and
Resettlement (R&R) demands beyond the scope of the provisions.

 Lack of trust among PAPs since issues related to land compensation and R&R
benefits were pending for considerable amount of time in some projects

 Some of the prevailing norms and practices were also proving to be bottlenecks
for extending R&R benefits and land compensation.

 Lack of co-operation from landowners for executing agreement as well as
preparation of compensation bills

 Reluctance of Project Affected Families to shift to resettlement site.
 Inter-state posting of the land oustees and their dependents.
 Need for Project Report (PR) revision/ updation to accommodate the cost of land

at the enhanced rates declared by the Government of Maharashtra.

Remedial Measures

 Meeting with State Authorities and wide consultations with all stake holders as
confidence building measure.

 Payment of Land Compensation at enhanced rates

 Suitable modifications in R&R Policy

Our efforts paid dividend

 Record Physical Possession of land: 2650 Ha in last one year against 2620 Ha in
last 10 years.

 Employment Against Land: 1300 Nos. in last one year against total 941 in last 10
years.

 Land Compensation/MC: `. 525 Crores in last one year against total of `. 160
Crores in last 10 years.

5

6

Opening of Projects

The initiatives and decisions as mentioned earlier have had a significant positive
impact on opening of new projects. WCL opened 10 new projects in last ten months as
compared to one project in the last ten years. This is record breaking achievement done
by Team WCL.

S.No. Project Area Sanctioned Sanctioned Date of
1 Makardhokra-I OC Umrer Capacity Capital Opening
(MTY) (` in Crs)
Jan-2015
2.0 266.2308

2 Bhanegaon OC Nagpur 1.0 187.9413 Mar-2015
4.0 441.82 Mar-2015
3 Penganga OC Wani
1.2
New Majri Sec.-I A & Majri 1.5 88.9068 Apr-2015
4 Umrer 0.8
2.5 267.6678 May-2015
II A OC 0.84 299.5646 Jun-2015
5 Gokul OC 4.0 124.5908 July-2015
2.75 Aug-2015
6 New Majri UG to OC Majri 127.52 Oct-2015
20.59 611.1605 Oct-2015
7 Padmapur Extn OC Chandrapur
745.8313
8 Jamunia UG Pench

9 Dinesh OC Umrer
Amalgamated Majri

10
Yekona-I & Yekona- II

Total 3161.234

WCL made Turn Around in 2014-15 after 5 years by registering positive growth
of 3.6% in Coal Production Similarly, WCL has moved towards operational profit,
thereby reversing the trend of operational loss in last 3 years.

6

7

Looking Beyond Horizon- a Roadmap for Opening 36 Projects
in 36 Months

To produce 60 Mt coal and beyond by 2020, Team WCL rose to the occasion,
fine tuned its policies and took all stake holders on board through wide consultation.
The tireless efforts, innovative initiatives, speedy approval of Project Reports, improved
land acquisition & physical possession processes enabled WCL to open 10 new
projects from January 2015 to October 2015. With this successful experience, the
company have fixed the timeline for opening of another 26 new and replacement
projects adding to a total of 36 Projects (28 in Maharashtra & 8 in Madhya Pradesh) in
36 months.

YEAR Coal
( MT)
2015-16 45.1
2016-17
2017-18 48
2018-19 51
2019-20 55
60

WCL is geared up to build up capacity of 100 MT by 2019-20

7

8

Schedule of Projects

Sl.No. Name of Project Area Capacity (Mty) Commissioning

1 Makardhokra-I OC 2014-15 2.00 Commissioned
Umrer 1.00 Commissioned
4.00 Commissioned
2 Bhanegaon OC Nagpur
1.20 Commissioned
3 Penganga OC Wani 1.50 Commissioned
0.80 Commissioned
2015-16 2.50 Commissioned
Commissioned
1 New Majri Sector IA &II A OC * Majri 0.84
4.00 Commissioned
2 Gokul OC Umrer 2.75 Commissioned

3 New Majri UG to OC Majri 1.50 November 2015
3.25 December 2015
4 Padmapur Deep OC* Chandrapur
2.00 January 2016
5 Jamunia UG Pench 4.00 February 2016

6 Dinesh OC Umrer 0.32 March 2016

7 Amalgamated Yekona-I & II OC Majri 0.85 Aprill 2016
1.50 May 2016
8 Kamptee Deep OC* Nagpur 1.00 June 2016
July 2016
9 Amalgamated Pauni-II & III OC Ballarpur 3.00 August 2016
1.00 September 2016
10 Umrer Expn. OC (Amb river PH IV) Umrer 1.00 October 2016
1.70 November 2016
11 Mungoli Nirguda Deep OC* Wani 1.00 December2016
5.00 January 2017
12 Sharda UG Kanhan 1.50 February 2017
2016-17 3.00 March 2017
1 Singori OC 8.00
2 Adasa UG to OC Nagpur April 2017
Nagpur 1.00 May 2017
June 2017
3 Hindustan Lalpeth Extn OC* Chandrapur 2.50 July 2017
1.50 August 2017
4 Nilljai Expn Deep OC* Wani 2.00 Sept 2017
5 Tawa III UG Patharkhera 0.36 Oct 2017
6 Bellora Naigaon Deep OC* 1.00 Nov 2017
7 Dhuptala UG to OC Wani 2.00 Dec 2017
8 Dhankasa UG Ballarpur 2.00
9 Gauri Central OC 8
10 Saoner UG to OC Pench 2.00
11 Durgapur Deep OC* Ballarpur 74.57
12 Konda Hardola I & II OC Nagpur
Chandrapur
1 Pimpalgaon Deep OC*
Majri

2017-18
Wani North

2 Bhatadih NW Extn OC* Chandrapur
3 Khumbharkhani UG to OC Wani North
4 Borda UG Wani North
5 Dhau North UG
6 Silori OC Kanhan
7 Shaktigarh UG Nagpur
8 Murpar Expn UG* Patharkhera
Umrer

9 Gandhigram UG Patharkhera

Total

*Expansion/Replacement Projects

9

Salient Features
of

Projects

9

10

MAKARDHOKRA-I

UMRER AREA

Location District Nagpur, Maharashtra

Coal field Umrer
Capacity ( Mty) 2
Capital of Revised PR
(` in crs ) 266.2308
Reserve (M.Te) 34.68
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-8 (4997)
Linkage 19
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO /Miscellaneous
No. of workable seams 6.30
Average Thickness (Mtr) 1 in 9
Total Overburden (MCum) 6
Method of Mining
Depth of Quarry: Min-Max (Mtr) 3.9,4.69,2.63,2.70,1.18,3.33
Manpower 218.58
OMS
Land to be Acquired (Ha) Inclined Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs combination
Date of Opening 32-190
168
45.094
574.07
444
Jan-2015

10

11

BHANEGAON OC

NAGPUR AREA

Location District Nagpur, Maharashtra

Coal field Kamptee
Capacity ( Mty) 1
Capital of Revised PR
(` in crs ) 193.2753
Reserve (M.Te) 18.00
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-8 (4966)
Linkage 23
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO /Miscellaneous
No. of workable seams 5.49
Average Thickness (Mtr) 1 in 5
Total Overburden (MCum) 7
Method of Mining
Depth of Quarry: Min-Max (Mtr) 8.66,1.43,2.37,2.89,4.23,2.99,3
Manpower 98.75
OMS
Land to be Acquired (Ha) Inclined Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs combination
Date of Opening 65-190
117
32.375
453.11
92
Mar-2015

11

12

PENGANGA OC

WANI NORTH AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 4
Capital of Revised PR
(` in crs ) 441.82
Reserve (M.Te) 44.06
Grade of the coal (GCV) ( Kcal/kg) G-10 (4551)
Life of the Project ( Yrs )
Linkage 15
Average Stripping ratio (cum/Te) MAHAGENCO /Miscellaneous
Gradient
No. of workable seams 3.67
Average Thickness (Mtr) 1 in 7.5 to 1 in 14
Total Overburden (MCum)
Method of Mining 1
Depth of Quarry: Min-Max (Mtr) 17
Manpower 161.77
OMS Shovel Dumper combination for OB & Surface
Land to be Acquired (Ha) Miner for coal
Nos. of Employments/MC to PAPs 20-170
Date of Opening 307
49.35
763.06
514
Mar-2015

12

13

NEW MAJRI SECT. IA & SECT. IIA EXTN. OC

MAJRI AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 1.2
Capital of Revised PR
(` in crs ) 88.9068
Reserve (M.Te) 11.15
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-9(4832)
Linkage 11
Average Stripping ratio (cum/Te)
Gradient NTPC & VIPL
No. of workable seams 8.09
Average Thickness (Mtr) 1 in 4
Total Overburden (MCum) 1
Method of Mining 14.25
Depth of Quarry: Min-Max (Mtr) 90.23
Manpower
OMS Horizontal Slicing with Shovel Dumper
Land to be Acquired (Ha) combination
Nos. of Employments/MC to PAPs 90-160
Date of Opening 393
11.56
Nil
Nil
Apr-2015

13

14

GOKUL OC

UMRER AREA

Location District Nagpur, Maharashtra

Coal field Umrer
Capacity ( Mty) 1.5
Capital of Revised PR
(` in crs ) 267.6678
Reserve (M.Te) 14.50
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-7 (5250)
Linkage 11
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/ Miscellaneous
No. of workable seams 9.368
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 7.5 to 1 in 12.5
Method of Mining 02
Depth of Quarry: Min-Max (Mtr)
Manpower 2.0,4.0,
OMS 135.84
Land to be Acquired (Ha) Inclined Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs combination
Date of Opening 20-100

130
43.706
756.92

565
May-2015

14

15

NEW MAJRI UG TO OC

MAJRI AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 0.8
Capital of Revised PR
(` in crs ) 299.6767
Reserve (M.Te) 12.00
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-11 (4115)
Linkage 19
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO
No. of workable seams 3.59
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 5 to 1 in 6
Method of Mining 01
Depth of Quarry: Min-Max (Mtr)
Manpower 16.96
OMS 43.05
Land to be Acquired (Ha) Horizontal Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs Combination
Date of Opening 20-90
361
8.394
459.66
348
Jun-2015

15

16

PADMAPUR EXTN. DEEP OC

CHANDRAPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 2.50
Capital of Revised PR
(` in crs ) 124.5908
Reserve (M.Te) 11.45
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-10 (4717)
Linkage 08
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/ Miscellaneous
No. of workable seams 5.49
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 3.8 to 1 in 6
Method of Mining 1
Depth of Quarry: Min-Max (Mtr)
Manpower 16.45
OMS 62.85
Land to be Acquired (Ha) Horizontal Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs Combination
Date of Opening 100-180
448
21.138
61.93
Acquisition under process
July-2015

16

17

JAMUNIA UG

PENCH AREA

Location District Chhindwara Madhya Pradesh

Coal field Pench
Capacity ( Mty) 0.84
Capital of Revised PR 382.1477
(` in crs ) 17.50
Reserve (M.Te) G-6 (5649)
Grade of the coal (GCV) ( Kcal/kg) 26
Life of the Project ( Yrs ) MPGCL/Miscellaneous
Linkage NA
Average Stripping ratio (cum/Te) 1 in 10
Gradient
No. of workable seams 3
Average Thickness (Mtr) 2.85,4.40,3.00
Total Overburden (MCum)
Method of Mining NA
Depth of Quarry: Min-Max (Mtr) Board & Pillar With Caving
Manpower (Continuous Miner Technology)
OMS
Land to be Acquired (Ha) 120-284
Nos. of Employments/MC to PAPs 530
Date of Opening 6.056

376.940
227

Aug-2015

17

18

DINESH OC

UMRER AREA

Location District Nagpur Maharashtra

Coal fields Umrer
Capacity ( Mty) 4.0
Capital of Revised PR
(` in crs ) 611.605
Reserve (M.Te) 87.36
Grade of the coal (GCV) ( Kcal/kg) G-8 (4937)
Life of the Project ( Yrs )
Linkage 25
Average Stripping ratio (cum/Te) MAHAGENCO/Miscellaneous
Gradient
No. of workable seams 7.56
Average Thickness (Mtr) 1 in 7 to 1 in 8
Total Overburden (MCum)
Method of Mining 5
Depth of Quarry: Min-Max (Mtr) 3.0 & 2.0
Manpower 660.32
OMS Inclined Slicing with Shovel Dumper
Land to be Acquired (Ha) Combination
Nos. of Employments/MC to PAPs 45-200
Date of Opening
189
82.345
1636.97
1234
Oct.-2015

18

19

AMALGAMATERD YEKONA-I & II OC

MAJRI AREA

Location District Chandrapur Maharashtra

Coal fields Wardha Valley
Capacity ( Mty) 2.75
Capital of Revised PR 745
(` in crs ) 57.85
Reserve (M.Te)
Grade of the coal (GCV) ( Kcal/kg) G-8 (4920)
Life of the Project ( Yrs ) 25
Linkage
Average Stripping ratio (cum/Te) MAHAGENCO/Miscellaneous
Gradient 7.82
No. of workable seams
Average Thickness (Mtr) 1 in 4.8 to 1 in 14
Total Overburden (MCum) 1
Method of Mining
Depth of Quarry: Min-Max (Mtr) 9.94
Manpower 452.49
OMS Inclined Slicing with Shovel Dumper
Land to be Acquired (Ha) Combination
Nos. of Employments/MC to PAPs 25-160
Date of Opening
257
40.532
1701.32
1477
Oct.-2015

19

20

KAMPTEE DEEP OC

NAGPUR AREA

Location District Nagpur, Maharashtra

Coalfield Kamptee Valley
2
Capacity ( Mty)
Capital of Revised PR 318.6516
(` in crs )
Reserve (M.Te) 24.086

Grade of the coal (GCV) ( Kcal/kg) G-9 (4745)
Life of the Project ( Yrs ) 14
Linkage
Average Stripping ratio (cum/Te) MAHAGENCO /Miscellaneous
Gradient 5.002
No. of workable seams
Average Thickness (Mtr) 1 in 3.5 to 1 in 4.5
Total Overburden (MCum) 10
Method of Mining
Depth of Quarry: Min-Max (Mtr) 11,5.5,7,3.5,3,2,4,2,1.5,1.5
Manpower 120.485
OMS
Land to be Acquired (Ha) Horizontal Slicing,Shovel Dumper combination
Nos. of Employments/MC to PAPs 50-200
Ant. Date of Opening 198
38.261
445.24

Acquisition under process
Nov-2015

20

21

AMALGAMATED PAUNI-II & PAUNI-III

BALLARPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley Coalfields
Sanctioned Capacity ( Mty) 3.25
Sanctioned Cost of Revised PR
(` in crs ) 499.0042 Crs
Reserve (M.Te) 30.63
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-9 (4876)
Linkage 14
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 6.19
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 6 to 1 in 7
Method of Mining 1 (Composite)
Depth of Quarry: Min-Max (Mtr)
Manpower Top section- 10
OMS Bottom section- 04
Land to be Acquired (Ha.)
Nos. of Employments/MC to PAPs 189.47
Ant. Date of Opening Shovel Dumper combination

27-200
242
50.87

1131.03
236

Dec-2015

21

22

UMRER EXPN. (AMB RIVER DIVERSION PH-IV)

UMRER AREA

Location District Nagpur Maharashtra
Umrer
Coal field 2
Capacity ( Mty) 64.1133
Capital of Revised PR 20.58
(` in crs )
Reserve (M.Te) G-8 (4900)
Grade of the coal (GCV) ( Kcal/kg) 13
Life of the Project (Yrs)
Linkage MAHAGENCO & Others
Average Stripping ratio (cum/Te) 2.15
Gradient 1 in 7
No. of workable seams 03
Average Thickness (Mtr) 4.68
Total Overburden (MCum) 44.12
Method of Mining
Depth of Mine:- Min-Max (Mtr) Shovel Dumper Combination
Manpower 100-130
OMS 450
Land to be Acquired (Ha.) 17.034
Nos. of Employments/MC to PAPs Nil
Ant. Date of Opening Nil
Jan-2016

22

23

MUNGOLI-NIRGUDA EXTN DEEP OC

WANI AREA

Location District Yavatmal, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 3.5
Capital of Revised PR
(` in crs ) 695.9854
Reserve (M.Te) 45.85
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-9 (4674)
Linkage 15
Average Stripping ratio (cum/Te)
Gradient Miscellaneous
No. of workable seams 5.88
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 10
Method of Mining 04
Depth of Quarry: Min-Max (Mtr)
Manpower 2,2,2,9
OMS 272.63
Land to be Acquired (Ha.) Inclined Slicing, Dragline, surface Miner &
Nos. of Employments/MC to PAPs Shovel Dumper combination
Ant. Date of Opening 100-150

550
24.105
529.18
Acquisition under Process
Feb-2016

23

24

SHARDA UG

Kanhan AREA

Location District Chhindwara, Madhya Pradesh

Coal field Pench-Kanhan
Capacity ( Mty) 0.32
Capital of Revised PR
(` in crs ) 140.0949
Reserve (M.Te) 6.88
Grade of the coal (GCV) (Kcal/kg)
Life of the Project ( Yrs ) G-10 (4311)
Linkage 20
Average Stripping ratio (cum/Te)
Gradient MPGCL/Miscellaneous
No. of workable seams NA
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 7 to 1 in 10
Method of Mining 2
Depth of Quarry: Min-Max (Mtr) 3.5
Manpower NA
OMS
Land to be Acquired (Ha.) Bord & pillar with caving, ( LHD / CM
Nos. of Employments/MC to PAPs Technology)
Ant. Date of Opening 98-360
298
5.377

Forest -9.50,Tenancy- 01
NA

Mar-2016

24

25

SINGHORI OC

NAGPUR AREA

Location District Nagpur, Maharashtra

Coal field Kamptee Coalfields
Sanctioned Capacity ( Mty) 0.85
Sanctioned Cost of Revised PR
(` in crs ) 205.4914 Crs
Reserve (M.Te) 12.30
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-8 (5049)
Linkage 18
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 5.43
Average Thickness (Mtr) 1 in 4
Total Overburden (MCum) 07
Method of Mining
Depth of Quarry: Min-Max (Mtr) 6.65,3.12,2.51,1.73,1.02,4.03,2.12
Manpower 66.73
OMS
Land to be Acquired (Ha.) Horizontal Slicing, Shovel Dumper combination
Nos. of Employments/MC to PAPs 52-150
Ant.Date of Opening 136
23.674
426
290
Apr-2016

25

26

ADASA UG TO OC

NAGPUR AREA

Location District Nagpur, Maharashtra

Coal field Kamptee Coalfields
Sanctioned Capacity ( Mty) 1.5
Sanctioned Cost of Revised PR
(` in crs ) 300.6908 Crs
Reserve (M.Te) 22.08
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-8 (5020)
Linkage 20
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Misc.
No. of workable seams 6.63
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 6.5
Method of Mining 5
Depth of Quarry: Min-Max (Mtr)
Manpower 3.51,1.35,1.47,4.42,1.54
OMS 146.36
Land to be Acquired (Ha.)
Nos. of Employments/MC to PAPs Inclined Slicing, Shovel Dumper combination
Ant.Date of Opening 35-115
128
44.39
596.27
650

May.-2016

26

27

HINDUSTAN LALPETH EXPN. OC

CHANDRAPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity (Mty) 1.0
Cost of Revised PR
(` in crs) 57.6626
Reserve (M.Te) 5.87
Grade of the coal (GCV) (Kcal/kg)
Life of the Project (Yrs ) G-10 (4328)
Linkage 8
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 7.522 (without RH)
Average Thickness (Mtr)
Total Overburden (MCum) 9.881 ( With RH)
Method of Mining 1 in 4 to 1 in 6
Depth of Quarry: Min-Max (Mtr) 1
Manpower 16
OMS 58.003
Land to be Acquired (Ha)
Nos. of Employments /MC to PAPs Inclined Slicing,Shovel Dumper combination
Ant. Date of Opening 40-175
518
7.313

36.98 (diversion of forest land)
NA

Jun-2016

27

28

NILJAI EXPANSION DEEP OC

WANI AREA

Location District Yavatmal Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 3.00
Capital of Revised PR
(` in crs ) 414.1063
Reserve (M.Te) 45.30
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-11 (3935)
Linkage 20
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 8.47
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 5 to 1 in 6
Method of Mining 1
Depth of Quarry: Min-Max (Mtr)
Manpower 17.2
OMS 383.51
Land to be Acquired (Ha) Inclined slicing with Shovel Dumper
Nos. of Employments/MC to PAPs Combination
Ant. Date of Opening 105 to 200

873
13.02
588.64
445
Jul- 2016

28

29

TAWA-III UG

PATHERKHERA AREA

Location District Betul, Madhya Pradesh

Coal field Patherkhera
Capacity ( Mty) 0.48(PR)
Capital of Revised PR 135.1735
(` in crs ) 12.599
Reserve (M.Te) G-6 (5615)
Grade of the coal (GCV) ( Kcal/kg) 22
Life of the Project ( Yrs )
Linkage MPPGCL/Miscellaneous
Average Stripping ratio (cum/Te) NA
Gradient
No. of workable seams 1 in 7.5 to 1 in 10
Average Thickness (Mtr) 3
Total Overburden (MCum)
Method of Mining 2.25,1.85,1.80
Depth of Quarry: Min-Max (Mtr) NA
Manpower
OMS Board & Pillar with caving loading with LHDs on
Land to be Acquired (Ha) Belt conveyor
Nos. of Employments /MC to PAPs 79-441
Ant. Date of Opening 845
2.173
207.47
75
Aug-2016

29

30

BELLORA-NAIGAON DEEP OC

WANI AREA

Location District Yavatmal , Maharashtra

Coal field Wardha Valley
Capacity (Mty) 1.00
Capital of Revised PR
(` in crs) 230.4714
Reserve (M.Te) 16.68
Grade of the coal (GCV) (Kcal/kg)
Life of the Project (Yrs ) G-10 (4420)
Linkage 18
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 6.34
Average Thickness (Mtr)
Total Overburden (MCum) 1in 6.5 to 1 in 5
Method of Mining Two
Depth of Quarry: Min-Max (Mtr)
Manpower Top 10.09
OMS Bottom 8.56
Land to be Acquired (Ha)
Nos. of Employments/MC to PAPs 105.80
Ant. Date of Opening Inclined Slicing,Shovel Dumper combination

80-170
538
7.041

317.43
345

Sept- 2016

30

31

DHUPTALA OC MINE(SASTI UG TO OC)

BALLARPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 1.70
Capital of Revised PR
(` in crs ) 727.28
Reserve (M.Te) 53.73
Grade of the coal (GCV) ( Kcal/kg) G-11 (4210)
Life of the Project ( Yrs )
Linkage 33
Average Stripping ratio (cum/Te) MAHAGENCO/Miscellaneous
Gradient
No. of workable seams 5.2
Average Thickness (Mtr) 1in 10 to 1 in 18
Total Overburden (MCum)
Method of Mining 1
Depth of Quarry: Min-Max (Mtr) 15.68
Manpower 279.5
OMS Inclined slicing with Shovel Dumper
Land to be Acquired (Ha) Combination
Nos. of Employments /MC to PAPs 25-150
Ant. Date of Opening 296
21.76
915.74
738
Oct- 2016

31

32

DHANKASA UG

PENCH AREA

Location District Chhindwara Madhya Pradesh
Pench-Kanhan
Coal field 1.0
Capacity ( Mty) 426.27
Capital of Revised PR 17.714
(` in crs ) G-8 (5154)
Reserve (M.Te) 26
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) MPGCL/Miscellaneous
Linkage NA
Average Stripping ratio (cum/Te)
Gradient 1 in 10
No. of workable seams 2
Average Thickness (Mtr) 4,4
Total Overburden (MCum) NA
Method of Mining
Depth of Mine:- Min-Max (Mtr) Board & Pillar (CM/ LHD)
Manpower 110-250
Land to be Acquired (Ha.) 694
Nos. of Employments/MC to PAPs 549.131
OMS 138
Ant. Date of Opening 5.509
Nov-2016

32

33

GAURI CENTRAL OC

BALLARPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 3.00 to 5.00
Capital of PR
(`` in crs ) Under preparation
Reserve (M.Te) 90.21
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G 10(4320)
Linkage 27
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 9.19
Average Thickness (Mtr)
Total Overburden (MCum) 1in3.5 to 1in14.5
Method of Mining 2
Depth of Quarry: Min-Max (Mtr)
Manpower 9,3.5
OMS 829.30
Date of Opening Inclined slicing/shovel dumper/surface miner
52-220
Details as per GR
450
42.49
Dec-2016

33

34

SAONER UG TO OC

NAGPUR AREA

Location District Nagpur, Maharashtra
Kamptee
Coal field 2.0
Capacity ( Mty) 442.1587
Capital of Revised PR 57.723
(` in crs )
Reserve (M.Te) G-10 (4454)
Grade of the coal (GCV) ( Kcal/kg) 34
Life of the Project ( Yrs )
Linkage MAHAGENCO/Miscellaneous
Average Stripping ratio (cum/Te) 10.266
Gradient
No. of workable seams 1 in 7 to 1 in 15
Average Thickness (Mtr) 09
Total Overburden (MCum)
Method of Mining 4,2,1.75,3.5,1.25,1.2,1.05,1.10,1
Depth of Quarry: Min-Max (Mtr) 592.558
Manpower
OMS Inclined Slicing,Shovel Dumper combination
Land to Acquired (Ha) 25-240
Nos. of Employments/MC to PAPs 214
Ant. Date of Opening 35.401
666.60
416

Jan-2017

34

35

DURGAPUR EXTN DEEP OC

CHANDRAPUR AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 3.00
Capital of Revised PR
(` in crs ) 279.4647
Reserve (M.Te) 48.81
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-10 (4581)
Linkage 18
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Power Industry
No. of workable seams 6.61
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 8 to 1 in 10
Method of Mining 1
Depth of Quarry: Min-Max (Mtr)
Manpower 15.50-16.35
OMS 322.8
Land to Acquired (Ha)
Nos. of Employments/MC to PAPs Inclined slicing with Shovel Dumper
Date of Opening Combination
95-205
594
19.13

Forest Land -121.58
NA

Feb- 2017

35

36

KONDA HARDOLA OC

MAJRI AREA

Location District Chandrapur, Maharashtra

Coal field Wardha Valley
Capacity ( Mty) -
Capital of Revised PR -
(` in crs )
Reserve (M.Te) 640 (Gross)
Grade of the coal (GCV) ( Kcal/kg) G-9(Tentative)
Life of the Project ( Yrs )
Linkage -
Average Stripping ratio (cum/Te) -
Gradient -
No. of workable seams -
Average Thickness (Mtr) 1(Composite)
Total Overburden (MCum) 15
Method of Mining -
Depth of Quarry: Min-Max (Mtr) -
Manpower -
OMS -
Land to Acquired (Ha) -
Nos. of Employments/MC to PAPs -
Date of Opening -
March- 2017

36

37

PIMPALGAON DEEP OC

WANI NORTH AREA

Location District Yavatmal Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 1.2
Capital of Revised PR
(` in crs ) 223.3083
Reserve (M.Te) 13.92
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-9 (4659)
Linkage 16
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 11.20
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 4.5 to 1 in 5
Method of Mining 1
Depth of Quarry: Min-Max (Mtr) 17
Manpower
OMS 156.00
Land to be Acquired (Ha.) Inclined slicing with Shovel Dumper
Nos. of Employments/MC to PAPs
Ant. Date of Opening Combination
125 to 205

631
7.204
374
Acquisition to be started
Apr -2017

37

38

BHATADI NW EXPN. OC

CHANDRAPUR AREA

Location District Chandrapur Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 1.5
Capital of Revised PR
(` in crs ) 514.4718
Reserve (M.Te) 55.29
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-9 (4798)
Linkage 42
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 8.01
Average Thickness (Mtr) 1 in 6
Total Overburden (MCum) 1
Method of Mining 12-18
Depth of Mine:- Min-Max (Mtr)
Manpower 442.90
OMS Inclined Slicing Shovel Dumper combination
Land to be Acquired (Ha.)
Nos. of Employments/MC to PAPs 30-186
Date of commissioning 473
12.04

779.18
Acquisition to be started

May-2017

38

39

KHUMBHARKHANI UG to OC

WANI-NORTH AREA

Location District Yavatmal Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 1
Capital of Revised PR
(` in crs ) 166.2861
Reserve (M.Te) 10.55
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-8 (4907)
Linkage 15
Average Stripping ratio (cum/Te)
Gradient Power/Non Power
No. of workable seams 8.60
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 10
Method of Mining 2
Depth of Mine:- Min-Max (Mtr)
Manpower 3.27-5.28,1.7-2.54
OMS 90.76
Land to be acquired (Ha)
Nos. of Employments/MC to PAPs Shovel Dumper Combination
Ant. Date of Opening 100-200
209
18.124
260.11

Acquisition to be started
Jun-2017

39

40

BORDA UG

WANI NORTH AREA

Location District Yavatmal Maharashtra

Coal field Wardha Valley
Capacity ( Mty) 0.96
Capital of Revised PR (` in crs )
Reserve (M.Te) 221.61
Grade of the coal (GCV) ( Kcal/kg) 30.34
Life of the Project ( Yrs ) G-9 (5170)
Linkage
Average Stripping ratio (cum/Te) 36
Gradient MAHAGENCO / Miscellaneous
No. of workable seams
Average Thickness (Mtr) NA
Total Overburden (MCum) 1 in 9

Method of Mining 2

5 ,3.5

NA
1. Long wall Mining with Power Support
2.C M on Board & Pillar or Split & Fender

Method

Depth of Mine:- Min-Max (Mtr) 58-321.62
Manpower 561
OMS 6.538
Land to be acquired (Ha.) 65.69
Nos. of Employments/MC to PAPs
Ant. Date of Opening Acquisition to be started
Jul- 2017

40

41

DHAU NORTH UG

KANHAN AREA

Location District Chhindwara Madhya Pradesh

Coal field Pench-Kanhan
Capacity ( Mty) 0.36
Capital of Revised PR 41.70
(` in crs ) 2.074
Reserve (M.Te)
Grade of the coal (GCV) ( Kcal/kg) Washery – Grade-II
Life of the Project ( Yrs ) 7
Linkage
Average Stripping ratio (cum/Te) MPGCL/Miscellaneous
Gradient NA
No. of workable seams
Average Thickness (Mtr) 1 in 5 to 1 in 7
Total Overburden (MCum) 1
Method of Mining
Depth of Mine:- Min-Max (Mtr) 5.71-6.61
Manpower NA
OMS
Land to be Acquired (Ha) Continuous Miner
Nos. of Employments/MC to PAPs 200-400
Ant. Date of Opening 340
4.040
Nil
Nil
Aug-2017

41

42

SILORI OC

NAGPUR AREA

Location District Nagpur Maharashtra

Coal field Kamptee
Capacity ( Mty) 2
Capital of Revised PR
(` in crs ) 952.4435
Reserve (M.Te) 65.71
Grade of the coal (GCV) ( Kcal/kg)
Life of the Project ( Yrs ) G-7 (5274)
Linkage 38
Average Stripping ratio (cum/Te)
Gradient MAHAGENCO/Miscellaneous
No. of workable seams 10.24
Average Thickness (Mtr)
Total Overburden (MCum) 1 in 5.5 to 1 in 16
Method of Mining 5
Depth of Mine:- Min-Max (Mtr)
Manpower 1.6-4.4
OMS 673.02
Land to be Acquired (Ha.) Inclined Slicing with Shovel Dumper
Nos. of Employments/MC to PAPs 28.95-200.5
Ant. Date of Opening
244
31.05
1519.90
Acquisition to be started
Sept-2017

42