No.2 July – December 2023 Chemicals Asia Co., Ltd. Aiyawee Pangpibool (Som-O) Production Administrative Officer Best Costume Award (Female) ZCA Year End Party 2023
Contents 01 New Year’s greetings form Managing Director. 02 What is your working plan to achieve target for ACL project. 04 ACL Introduction Article. 05 The problem during ACL Commissioning period and how to solve. 06 What are the differences between ACM&ACL quality testing. 07 Overview of ACM production and sales. 08 PSM external audit , ZC Audit, ISO:9001 Audit. 08 09 Happy Training 11 Company Activity Happy work place 13 CSR Activity 15 Which place in Thailand do you like to travel? 16 Introducing touristattractions during the late rainy and early winter season.
Y2023 I am so glad to tell everyone that Y2023 was so good year for ZCA to achieve successfully as below ; 1. Zero incident or accident all through the year. 2. Target of Sales quantity, Production quantity and Sales profits. 3. ISO 9001 Certification in February. 4. Start-up ACL commissioning production for November and December. It is amazing all ZCA team showing hard-work for the Company and working together with Japanese team to achieve our target. I sincerely appreciate for it and allow me to say “ Thank you,” to everyone. Y2024 ZCA have the new biggest target to start commercial production and sales of ACL from this year. I believe this is the very good opportunity for ZCA to develop our company for our bright future. At the beginning of new year Y2024, I would like to give 3 messages to everyone. 1. Safety First This is still most important, so I repeat to say it anytime. I like running Marathon. In case of Marathon, I cannot run Marathon, if I have injury by accident. Therefore I always pay attention to safety not having accident or injury for Marathon. 2. Self-Development What is most necessary for the Company development ? My answer is, the Employees’ development. If employees can develop yourself, ZCA can develop as well. Everyone should be better than last year. The Company can invest money for necessary training for the development of employees capability and experience. In case of Marathon, I need more training if I would like to run faster. If necessary, I join running training course or pay money for fitness or running gears for my improvement. 3. Enjoying Work Actually I like working with ZCA employees at ZCA, because everyone is so kind to support each other. I really feel happy and comfortable with everyone in ZCA, even though someone say I sometimes look serious. I would like all of ZCA employees to enjoy working at ZCA, because you can highly motivate yourself if you can enjoy your work. In case of Marathon, I can keep on developing myself with high motivation, because I like Marathon very much. I would like to keep on running to our successful target with all of ZCA team together. Build Together, Grow Together ! Go Anzen Ni & Safety First ! Enjoy working at ZCA. Shiro Mizukai Managing Director Zeon Chemicals Asia Co., Ltd. 1
The future work plan to achieve the goals of ACL-project is as follows. With the efforts of everyone at ZCA and support from ZEON, let's do our best to achieve these targets in terms of safety, quality, and delivery. Let everyone to learn more about ACL's production process and quality control, and let's make the ACL project a success and make ZCA's future brighter. Built together, Grow together ‼ Target and work plan to achieve the ACL-project plan 1. Obtain sample for customer evaluation during test production period. [Dec 2023] • Obtain sample which passed internal evaluation by ZC and ZCA within Lot-003 to 006. • During the test production period, process data will be obtained, and necessary improvement items will be extracted for future safe and stable production. 2. Commercial production will begin in April or late March 2024. [March-April 2024] • Pass the customer's quality assessment. • Obtain operation permission from IEAT. • Improve process problems before starting commercial production. 3. Achieve the budgeted production volume of approximately 2,000MT/year (wet) in 2024 under safe and stable operations. [December 2024] • Prepare operating conditions and SOPs for commercial productions. • Prepare documents for quality assurance to customers. • Determine how products will be stored and shipped. • Continue to make improvements to ensure safe and stable production • Perform ACL production and quality control under the quality management system (ISO9001:2015). Add ACL production to the QMS scope of ZCA within Y2024. TH2202-PJ Outline Schedule Step 2022 2023 2024 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr ZC decision making ZC 経営判断 ★ IEE report / Construction permit IEEレポート / 建築許可 ★ IEE ★ CP1 ★ CP2 ⇒ CP3 ★ CP3 Project detail design詳細設計 Pre-work (Test, Temporary)事前工事(地盤調査・試験杭、仮設) Construction建設工事 17- Sep ★ ⇒ ★ 21th ★ Water supply system works水運転 ★ ⇒ ★ 26th ★ Commissioning / Test production試運転 / 量産試作 ★ ⇒ ⇒ ★ 1st ★ Assessment評価 ZC★ ⇒ ★ ZC ★ Cus Plant start-up (Commercial)商業運転開始 ★ Outline schedule of the ACL-project Our ACL plant achieved mechanical completion in September 2023 and began commissioning. As of December 2023, we are continuing test production of BM900B. First, I would like to thank everyone involved for completing the one-year construction and commissioning period without any loss-time incidents and the commissioning is on process within the project's target delivery date. What is your working plan to achieve target for ACL project Kazuhiro Sato Plant Manager / Director 2
Feasibility Study Basic Design Quotation inquiry & Investment Judgement Detail Design Design & Construction Commissioning & Test Run 3 3 5 5 13 3 (Month) Hello, ZCA team krub. I get opportunity to introduce how to achieve target in ACL project. Our target of PJ is defined by 4 values as SQDC : Safety, Quality, Delivery, Cost. We must achieve all the values. However, it is not enough space to explain all in this column, thus I pick up how to achieve delivery (=keep project schedule). Generally, the scale of ACL plant Construction project takes 3 ~ 3.5 years of period from Feasibility study to Test production. We make short/middle and long-term schedule, then control each parties’ schedule. However, over the entire period, we would be faced to many many unexpected / uncontrolled situations which cause schedule delay since Hundreds of vender/contractors are involved. What is important to keep schedule is to make our requirement clear. PJ need to judge decision for these cases, If the judgement/ requirement is unclear, related parties will make misjudgments and causes rework. It wastes time. Even if the requirements by the parties are not clear, we have to investigate route cause and reply counter measure clearly. That is the point of schedule mitigation. To impose responsibility onto contractor/ other party doesn’t make good result. In other words, to communicate well with parties and find best solution for all parties is important to overcome unexpected situation and prevent delay of schedule. Actually this PJ faced to two of big difficult situation as China lock down due to Covid and Invasion in Ukraine. Both situations made problems for supply chain. Under these situations, having released product (almost) on schedule was evaluated as amazing result by other companies. We can be proud of this result. TH-2202 Project is the Polyacrylate Rubber Plant Expansion phase 1, Intention for increasing the double Production capacity. Project timeline fixed by 3-stream phases: 1. Up-stream is Design/Engineering & Procurement within 6 months, 2. Mid-stream is Construction & Machinery Installation within 12 months, and 3. Down-stream is Commissioning & Start-up within last 3 months. In order to these conditions, The most difficult phase is Construction & Machinery installation must be finish within 12 months under the Budget given. Furthermore, to secure the ZEON CORPORATION business strategy and maintain the Sale opportunity. Predecessor has to be managed is “Stakeholder management” Project need to know all departments or persons relevance in the project. Successor has to be managed is “Risk management” How many Risks must be identified and set up countermeasure. When we knew above important information, The next step going to be set up Quality management, Resource management, Communication management. In order to ensure all stakeholder stay in the same viewpoint of project direction. During Construction & Machinery Installation phase, There are 2 processes need to be carried out as well. Executing process, Monitoring & Controlling process both are the keys to ensure Project stay on plan and safely for Construction work & Plant Operation. When ensured that Project met objectives, Project closing phase has become. Then Expanded plant and new Fixed asset handover to Plant user on time and requirement. Completed ACL production facility. Hiroyuki SEKINE / Project Secretary, Mechanical Engineer Kongtisak Ruansa (Big) / Project Site Manager 3
ZCA has started construction to produce one more product “Polyacrylate latex” (ACL). The new line is targeted capacity at 5,000 ton/year. Company aims to start commercial product to customer in April 2024. Production process to produce ACL will be started with emulsion solution preparation, then polymerization, concentration to remove un-reacted monomers for good quality product, later transferring to latex storage with some adjustment to control quality, finally filling step and palletizing. Waste gas coming from process will be sent out RTO, waste water going to waste water treatment and solid waste to authorized company. Zeon provides materials for lithium ion battery; Anode/Cathode binder, binder for functional layer. ACL latex is used for binder of functional layer as property resistant to heat, good adhesive as well as safely in use resulting in battery shorter time in charging, longer time in use, durable, safe and friendly to environmental. Acrylate latex is mainly supplied to electric automobile industry which is rapidly growth in the market. Lithium-ion battery components extended barrier plate for safety charging into the battery in electric vehicles. ACL Introduction Article. 4
It's a good chance for ZCA that we implemented TH2202 or ACL project to built another successful for bright future. Project itself is not easy but not so difficult to achieve. Starting from manpower planning, training, learning new things and work cooperate with multi-levels of other people. Till now we are ongoing to produce ACL product to supply sample to customers within this year as planned. Every project has some issue or problem, so we need to continue some corrective action or further improvement. I believe that ACL team who has ownership, high responsibility, good team work, gain more knowledge, experiences, skill improvement and apply to routine work when going back to normal shift working. Next year we will start commercial product to customers, as expected that company will gain more profit, then returning to all employees happy working life finally. Last, I would say thank you to everyone who support for ACM production during ACL project construction. We did achievement of safety, product volume, yield, loss against to target in this year. In fact, ZCA employees can achieve any challenge work once we work as team, be positive, learning to give and take, understand the difference and synergize for success. Cheers!! The problem during ACL Commissioning period and how to solve. Be a part of TH2202 project since the construction phase is a good opportunity for me. learn more knowledge in term of technical data and learn how to work with many parties at the same time. Sometimes, we have argument and discussion between each party, but it is an ordinary thing in project work, because we all know that everyone has the same purpose which is to have the best thing for ZCA. Language barrier is also another point that make this project harder. We have Japanese, Indian, Malaysian, Indonesian, Thai, etc. work together. Therefore, I think one of the key points is to listen carefully and make sure we understand the same thing before starting daily work. Finally, we can start product testing as plan. Thank you, all member, to always support the activities and make it happen. Most of the problems encountered during commissioning project TH2202 will be characteristics of some devices that are working. The product's performance has to be adjusted to meet its target. The key issue is the quality of the product that customers can trust and trust. But these problems will be analyzed, summarized and solved by the team. The departments that have always shared the best ways to solve this problem demonstrate that a good team work can be achieved by a good team work. Organizations that work efficiently also achieve great results, and this creates endless development of organizations and personnel. Teamwork is very important. Thank you. Taweesan Jansom (San) / Production Manager Kitiphoom Shinwasusin (Ton) / Process Engineer Waroj Phutha(Pek) / Board Operator 5
What are the differences between ACM&ACL quality testing. There are differences in testing instruments and pre-test sample preparation methods because the chemical properties and physical characteristics differ, for example, testing for viscosity. ACM Products: Physical characteristics are rubber solid. Before testing, it needs to be crushed (Roll) into a sheet. And they can be tested using a measuring instrument that has a liquefaction system, which we call the Mooney viscometer. ACL Products : Physical characteristics are fluid, so we can measure viscosity using a tool called Viscometer (B-type). Although ACM products, Our ACL differ in quality testing methods, but the one thing QC is determined to do is test products so that customers can always get quality products that meet their needs. ACM takes quite a long time to test quality because it needs Control temp. Sample before test for 24 hours ACL are easier to test than ACM and take a quality test within one day, but difficulty is Lab equipment cleaning. ACM has several test procedures for Test 1 sample. The sample is dry rubber, sticky. If stored for a long time without plastic filter, the rubber sheet will be combined into one piece and difficult to separate. ACL have fewer procedures for testing because they are rubber liquid so they can be tested without being rolled like ACM, but the rubber has strong smell rubber liquid. And we have more careful in testing because there is just small sample. ACM, we have skills to use the quality analysis equipment and maintenance of for use and keep ACM, it's easy to cleaning. ACL, analysis tools, and relatively new equipment such as GCs are sensitive. We still lack the expertise to use and we still need a lot of learning. ACL, It's rubber liquid so it's quite important to be careful in the test, not to spill or contaminate because it’s difficult to clean. ACM ACL Nittaya Sukondhakehar (Tik) / QC Senior Technician Sujinan Choncharoen (Pear) / QC Technician Tidatip Wongsa (Jaa) / QC Technician Phatthananya Prangjan (Bee) / QC Technician 6
Production and Sales of ACM Production and Sales of ACM in Year 2023 From January to December 2023, our performance of both ACM Production and Sales are quite good, over budget. The production and sales data for all nine grades of ACM products are detailed in the table below. The most produced and sold grade is AR212HR, followed by H310X. Production and Sales Budget of ACM in Year 2024 And for the production and sales of ACM products in 2024, the company has estimated in advance according to the information in the table below. The grades that are planned to produce and sell the most are still the AR212HR and H310X grades, same as last year. “TEAMWORK MAKES OUR DREAM COME TRUE” 7 Budget Y2023 Actual Y2023 YTD (Year-to-Date) for 12 months % YTD (Year-to-Date) for 12 months +/- Production Quantity 2,798.0 MT 3,242.1 MT 115.8% +442.125 MT Sales Quantity 2,694.5 MT 2,856.6 MT 106.0% +162.1 MT ACM-ZCA Y2023 Actual KGS/Year ACM Production Quantity Sales Quantity AR12 107,400 3.3% 87,450 3.1% AR14 111,450 3.4% 144,300 5.1% AR71 147,425 4.5% 161,325 5.6% AR72LS 165,750 5.1% 58,875 2.1% AR74X 40,725 1.3% 38,600 1.4% AR212HR 1,715,399 52.9% 1,565,300 54.8% H310X 880,921 27.2% 744,850 26.1% H210X 0 0.0% 8,825 0.3% H570 74,055 2.3% 47,050 1.6% Actual 3,243,125 2,856,575 ACM-ZCA Y2024 Budget KGS/Year ACM Production Quantity Sales Quantity AR12 80,000 2.5% 92,000 3.2% AR14 180,000 5.6% 163,200 5.7% AR71 120,000 3.7% 175,604 6.1% AR72LS 0 0.0% 34,800 1.2% AR74X 0 0.0% 11,600 0.4% AR212HR 1,850,000 57.1% 1,815,900 63.6% H310X 940,000 29.0% 956,804 33.5% H210X 0 0.0% 0 0.0% H570 30,000 0.9% 66,800 2.3% Budget 3,200,000 3,316,708
Happy work place Happy Mind “Fit to Mind Fine to Work” Activity Happy Body Activity Internal Audit PSM Internal Audit ZC Audit ISO:9001 Audit 8
Happy Training Training The Health, Safety and Environment Department has conducted a refresher training on safety knowledge for employees. to understand the work processes related to safety before work, and to operate efficiently and with safety in the company. Refresh HSE Training : Refresh WI training, SDS Risk assessment and JSEA, Incident Investigation, Permit to work, Contractor safety management Training course: Work with Hazardous Chemical and Chemical Spill Control The Company conducted in-house training related of Work with Hazardous Chemical and Chemical Spill Control to ensure that employees understand the normal information properties of each type of hazardous substance used in their operations. Many hazardous substance accidents occur and increase the severity of losses because of incorrect storage and transportation methods in accordance with safety principles. Also, those who work related to hazardous substances. Must have knowledge in responding to emergency incidents effectively to ensure safety in the company. Training course : First Aid The Company conducted training course First Aid for employees to have knowledge and skills in basic first aid and resuscitation. Able to help those who are injured or sick to be out of danger correctly and be able to apply knowledge to daily life. English Business Course The Company supports and promotes English communication course knowledge to employees. It is necessary to communicate in English for smooth business dealings. Therefore, the Company has organized training courses for employees to learn the language to enhance communication skills in terms of good benefits for both the organization and the employees themselves. 9
Happy Training Technical Fire Fighting Production and maintenance staff attended public training course Technical Fire Fighting To have knowledge and expertise in fire extinguishing techniques with equipment effectively. Able to plan before an incident occurs. Situation assessment controls the fire and tactics and be able to respond safely to suppress the fire. Training Course: Safety Committee The company submitted employees to the Safety Committee (new set) attend external training. for the Safety Committee (new set) to learn the duties and roles of the Safety Committee. To use knowledge to develop and improve safety activity with comply in the laws. Training course : Accounting Practices and Adjustment of Transactions in accordance with Accounting Standard No. 2 on Inventories. The Accounting and Finance Department attended a training course Accounting Practices and Adjustment of Transactions in accordance with Accounting Standard No. 2 on Inventories. To understand the Preparation of Reports Recording and updating accounting transactions to be accurate and in accordance with the requirements of the Revenue Department. for the Company's tax benefits. 10 Training
Happy Activity ZCA Company Trip 5th anniversary of ZCA ZCA Loy Krathong 2023 Photo contest and paint the pictures for employee’ s children 11
Happy Activity Badminton Competition ZCA Year End Party 2023 12
CSR Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 13
1. Mr.Kazuhiro Sato and Company representative participated in the planting of 200 trees at WHA Map Ta Phut Industrial Estate. 2. Mr. Kazuhiro Sato and Company representative participated in tree planting and volunteer activity at Huai Pong Subdistrict Police Station. 3. Company representative participated in activity plant trees and create temporary water faucets at Baan Noen Samre Community Forest. 4. Company representative donated money to support the activity of raising monks and spread wild cloth to the Prachummitcommunity 5. Company representative donated bottles and cardboard boxes in amount of 132 kg. at the Wat ChakLuk Ya Waste Management Center Recycle. 6. WHA CSR CLUB (Education Support Group) has supported the money to repair the damaged water storage facilities at Rayong WittayakhomSchool. At this time, the water storage department has been repaired and the department has been officially delivered so that the school can use it further. 7. Mr.Kazuhiro Sato and Company representative participated in the International Coastal, develop, cultivate, and dispose of waste at Payun Beach. 8. Company representative donated money to the President of Wat Nong Fab Community to support the activity of Chaturthi the Great Celebration. 9. Company representative donated bottles and cardboard boxes in amount of 95 kg. at the Wat ChakLuk Ya Waste Management Center Recycle. 10. Company representative participated Bang Kraphon Canal Development and Rehabilitation Act, to maintain water supply in Map Ta Phut area. 11. Company representative install water springer for the Vegetable Planting Project for Children at Wat Kiripawanaram School. 12. Company representative donated money to the WHA Office (Map Ta Phut) for the provision of prizes at the 2023 Red Cross Fair. 13. Company representatives participated in cleaning activity around Wat MapChalood School to prepare for the opening of the school semester. 14. Company representative donated bottles and cardboard boxes in amount of 104 kg. at the Wat ChakLuk Ya Waste Management Center Recycle. 15. ZCA RUN For Kids 2023 "To bring income to help patients, children and youth affected by HIV/AIDS" 16. Company representative participated in blood donation activity at WHA Eastern Industrial Estate Office (Map Ta Phut). 17. Company representative donated money to Chontharam(Payun) temple to support Kathin Samakkhiand make merit. 18. Company representative donated money to MapChalood temple to support Kathin Samakkhiand make merit. 19. Company representative donated money to Nong Fab temple to support Kathin Samakkhiand make merit. 20. Company representative participated in cleaning activity and prepared for the Kathin SamakkhiFrying activity at Wat Nong Fab area. 21. Company representative donated money to support the Loy Krathong Day activity to the Prachummitcommunity. 22. Company representative donated money to support the activity of canal development, log vegetables for Father day for Prachummitcommunity. 23. Company representative donated money to support the Sepak Takraw Anti-Drug Competition Mapchalood-Chakklang community. 24. Company representative donated bottles and cardboard boxes in amount of 115 kg. at the Wat ChakLuk Ya Waste Management Center Recycle. CSR Activity 15 16 17 18 19 20 21 22 23 24 14
Which place in Thailand do you like to travel ? This is where I want to go in Thailand. ‘’Koh Samui’’ I have a scuba diving license. I love seeing the dynamic terrain, colorful fish, and big fish like whale sharks. The coral reefs are also beautiful. HidetakeISHII / Quality Assurance Manager I like nature, so I often walk to the beach near by my hotel now. When I was In Japan, I went to many waterfalls. I check some sightseeing web site, I want to go Erawan waterfalls. I see some photo, this is very beautiful spot. Yutaka MARUHASHI / Quality Control Manager There are currently two major wars going on in the world. Japan has also fought wars in the past, and many innocent people died. In Japan, scars from past wars remain in places such as Hiroshima. We live in an era where many things are easy to understand through the media and the Internet. However, unless you go to the scene yourself, see the actual situation, and know the facts, you will not know the truth.I want to see the scars of Thailand's past wars to understand the meaninglessness of wars. Hinodori ENDO / Packing Specialist The place I want to travel in Thailand is Wat Saman Rattanaram, known as the Pink Ganesha. It is famous in Japan as a statue that makes wishes come true. Since my birthday is on Tuesday, I believe it will be very effective, chai mai? Mizukai-san took me there once. At that time, I wished for three things: (1) my family's health, (2) get ACL products, and (3) win the lottery. Fortunately, the first and second wishes came true. However, the third wish has not come true... I want to go back again. Junichi IMAI / Project Leader Construction Wat Saman Rattanaram, Chachoengsao Province Koh Samui, Surat Thani Province ErawanWaterfall, Kanchanaburi Province Wat Mahathat, Phra Nakhon Si Ayutthaya Province Live & Travel 15
Huai Pla Kang Temple, Chiang Rai There are dragon sculptures stretching on both sides of the stairs inside the pagoda, enshrined Buddha images and various arhats. And it is enshrined Chao Mae Guan Yin carved from the largest fragrant moonwood in Thailand. It is believed that if anyone did,Let's make a wish about health, finance, work, and get that wish back. Point of view of Laem Phu Chao, Unseen corner of Sattahip with the beauty of the sea and abundant nature. It is another place that few have never visited. The view point is located at Krom Luang Chumphon Khet Udomsak Court, a place that holds the hearts of Sattahip sailors. It is truly a secret sight that few people know. The path up to the sights are very natural. People who like to exercise can go, walk, run or cycle for a nice view. The place I want to recommend is "Pha Ma Yidang: Khao Phra Viharn National Park" Sisaket Province. It is considered one of the South Isan charms with interesting sights. Who is it? Many people may not know much about the atmosphere and fin weather. It is a spot that can be seen both in the fog and the three sunsets (Thailand, Laos, Cambodia) and also has a view on the cliff overlooking Cambodia's Preah Vihear Temple. I would like to recommend you to visit it once and you won't be disappointed. When there is a few rest day, but would like to have nature experience, you must find a place that is convenient and an atmosphere similar to the North. Khao Juk Reservoir in Rayong Province is a completely natural place suitable for escaping urban chaos. There's a reservoir in the middle, surrounded by mountains. It's perfect for spreading tents and watching the sunset or kayaking. At sunset, you can have another atmosphere. Just brave out of the save zone and follow your heart once you're looking for happiness. I recommend Khao Kho/Phu Thapluekas I personally like to go on vacation with the cool weather and the drizzling rain, which is very foggy, and indeed, there are many places to visit in the North with a very fin atmosphere. I recommend "Doi Soi Malai", a place to visit in the early winter rain. Doi Soi Malai is a mountain in Tak Province, in northern Thailand. It is suitable for adventure travelers because the vehicle traveling up must be a 4x4 Fovil. Motorcycles or trekking only. There are no facilities. On the way up, tourists can enjoy a beautiful natural view. At the top of the mountain, you can pitch your tent and in the morning you can see the sunrise with a beautiful sea of fog around it. It's perfect for late-season trips from November to January. You have to go once in your life!! I recommend a trip to Tha Sung Temple. It is not very old but quite famous. Tha Sung Temple is a large temple and tourist attraction in many temples such as the 100-meter Viharn Kaew Temple, Golden Castle, Macha Palace. The temple also has amulets for rent. When there are important festivals or days, the temple will hold events and facilitate those who come to merit by having a shrine, offering sacrifices, offering sacrifices, And also a lot of other activities. Khao Yai National Park, I would like to introduce you to Khao Yai National Park in the late winter or any season. It's a place where the family takes me for New Year Countdown every year from childhood to the present. It is a national park which is rich in nature and wildlife. There are many places to pitch tents. There are many natural trails with beautiful waterfalls. On the way, you also have a chance to meet wild animals and greet them. I never get tired of it for years. Introducing touristattractions during the late rainy and early winter season. Sanong Khamjulla (Pui) / Production Supervisor ChattanongMachandang (Japan) / Board Operator Ladda Bunchan (Fon) / ACC&FIN Officer Toonyawat Kotcharin (Pack) / Field Operator Aakkapoj Aemsang (Mai) / Mechanical Technician Nisitra Boonnak (Fong) / HR&GA Officer Pinsukorn Threerapong (Tar) / SCM Officer Teera Blanchard (Toby) / HSE Officer 16 Live & Travel
Panuwat Bongkaew (Ar) Maintenance Supervisor Best Costume Award (Male) ZCA Year End Party 2023