CATEGORIES OF HAZARDOUS CHEMICALS
Corrosive
Flammable
Toxic
Reactive
Biological (infectious)
Carcinogen (cancer-causing)
Radioactive
HOW DO I KNOW WHAT THE RISKS ARE
✓By reading the container labels and SDS (Safety
Data Sheets)
✓Never remove labels from containers
✓If you can’t find or read a label, tell your
supervisor
✓If you suspect that the label is incorrect for the
contents of the container, tell your supervisor.
ROUTES OF EXPOSURE
INHALATION
INGESTION
ABSORPTION
INJECTION
HANDLING FLAMMABLE CHEMICALS
01 02 03 04 05 06
Keep containers Keep away from Avoid contact Only transfer to Bond all receiving Clean up spills
closed when not ignition sources with approved containers and dispose of
in use incompatible containers waste properly
materials
TYPE OF PPE TO BE WORN WHEN HANDLING CHEMICALS AS BELOW:
Internal
FIRST AID SPLASH ON THE EYES
Don’t rub the eyes Hold eyelids open and Be careful not to Seek additional
flush with water for contaminate the other medical attention
15 minutes
eye
FIRST AID ON THE SKIN CONTACT
FLUSH AREA WITH LUKEWARM REMOVE CLOTHING AND SEEK ADDITIONAL MEDICAL
WATER FOR JEWELRY FROM ATTENTION
15 MINUTES BURN AREA
FIRST AID INHALLATION OF CHEMICALS
✓Remove to fresh air, if patient is not breathing ensure airways
are clear and apply artificial resuscitation.
✓Seek urgent medical attention
SAFE WORK PRACTICES
✓Know what you are handling
✓Always wear your Personal Protective Equipment
✓Have adequate ventilation
✓NEVER MIX CHEMICALS
✓If unsure or concerned, consult your supervisor
✓Don’t rely on your sense or smell
✓Store, Dispense and Dispose of chemicals safely and correctly
✓Know emergency procedures for:
• Chemical spills and fire
• If you are exposed to chemicals
• First Aid Kits/Eye Wash Bath
WELDING HAZARDS & EFFECT
HAZARDS EFFECTS
GAS CYLINDER FIRE & EXPLOSION
ARCH AND FIRE FROM WELDING EQUIPMENT FIRE & EXPLOISION
CONTACT WITH HOT WORK MATERIALS SKIN BURNS
METAL SPARKS SKIN BURNS
CONTINUOUS EXPOSURE TO WELDING HEAT SKIN BURNS & REDNESS
EXPOSURE TO EXCESSIVE HEAT FROM WELDING PROCESS HEAT STRESS
RESPIRATORY DISEASE
INHALATION OF GENERATED GAS AND FUMES I.E. GAS-CO,
FUME-FERUM OXIDE, NITROUS SYSTEMIC POISIONING
INHALATION OF FUMES FROM GALVANISED METAL (LEAD OR
TOXIC METAL) ELECTRIC SHOCK
CONTACT WITH ARCH WELDING EQUIPMENT I.E. DC OR AC,
VOLTAGE UP TO 100V CONJUCTIVITIS & DAMAGE TO RETINA
ULTRAVIOLET AND OZONE DRYNESS & IRRITANT TO EYES
INFRA-RED AND BRIGHT LIGHTS
SAFETY MEASURES OF EQUIPMENT
GENERAL
1. STORAGE OF GAS CYLINDER
2. HANDLING OF GAS CYLINDER
3. GAS LEAKAGE FROM REGULATOR
4. DAMAGE TO HOSE
5. MIXTURE OF OXYGEN AND FLAMMABLE GAS IN THE HOSE
6. OBSTRUCTION AT MOUTH OF NOZZLE AND BLOWPIPE
ELECTRIC ARC AND RESISTANCE WELDING
1. INSPECT GENERATOR, TRANSFORMER CABLE AND ELECTRODE HOLDER
2. MAINTENANCE OF WELDING EQUIPMENT
3. EARTHING OF EQUIPMENT / ELECTRIC CABLES
4. SELECTION OF SUITABLE EQUIPMENT TO JOB TASK
SAFETY MEASURES OF EQUIPMENT
GAS WELDING
1. ISOLATE OXYGEN CYLINDER AND ACETYLENE OR LPG CYLINDER
(AT LEAST 3M DISTANCE).
2. INSPECT HOSE, REGULATOR AND NOZZLE.
3. INSTALL NON-RETURN VALVE AND FLASHBACK ARRESTOR AT
BLOWPIPE
4. CLEAN NOZZLE
5. PROPER STORAGE PROCEDURES FOR CYLINDERS
6. PROPER HANDLING PROCEDURES FOR CYLINDERS
SAFETY MEASURES OF EQUIPMENT
DURING WELDING WORKS
1. FENCING WELDING WORK AREA
2. PROVISION OF FIRE PREVENTION AND CONTROL EQUIPMENT IN
WELDING AREA
3. ISOLATE FLAMMABLES FROM WORK AREA
4. PROVISION AND PROPER USE OF SUITABLE PERSONAL PROTECTIVE
EQUIPMENT AND CLOTHING FOR WELDERS
5. LOCAL EXHAUST VENTILATION SYSTEM FOR WELDING PROCESS
6. PREPARE SAFE OPERATING PROCEDURES FOR WELDING ACTIVITIES
7. PROPER SELECTION OF WORKERS
8. SUPERVISION OF WELDING WORKS
LIFTING GEARS / ASSESSORIES
COLOR CODING
COLOR CODE
YEAR
JAN - JUN JUL - DEC
2019 YELLOW GREEN
2020 BLUE YELLOW
2021 GREEN BLUE
2022 YELLOW GREEN
2023 BLUE YELLOW
LIFTING OPERATION
MANUAL HANDLING
Carrying excess load and wrong body posture can hurt
WORKING AT HEIGHT
RESTING AREA & PORTABLE TOILET
HEALTH HAZARDS – HEAT STROKE
HOUSEKEEPING
WORKFLOW REQUIREMENT
ENGINEERING PROCUREMENT, CONSTRUCTION & COMMISSIONING (EPCC) OF
PGU-I GAS PIPELINE REPLACEMENT (GRAPHITE) PROJECT
GREENFIELD WORKFLOW REQUIREMENT GREENFIELD PTW
APPROVAL
PERSONNEL
REQUIREMENT
❑ IC / PASSPORT JOB PACK REQUEST PERMIT ❑ REGISTER & ISSUED BY
❑ OGSP / CIDB REQUIREMENT MMSJV PTW COORDINATOR
❑ MEDICAL AME OHD
❑ HSE INDUCTION PGB / MMSJV ❑ MANUAL PTW FORM
❑ PASS MMSJV WL/RA
❑ 1 PASSPORT SIZE PHOTOGRAPH
TRAINING
❑ RELEVENT CERTIFICATES - COMPENTENCE
PTW VALIDITY
VEHICLE & EQUIPMENT
REQUIREMENT ❑ HW/CW – 7 DAYS/SHIFT
❑ VEHICLE INSPECTION PASS/STICKER ❑ JOB METHOD STATEMENT (JMS) ❑ APPLY PTW 24HRS ❑ SUSPENSION– END OF EVERY
(Reg Card, Insurance, Road tax, SHIFT
driver’s license) ❑ JOB HAZARD ANALYSIS (JHA) PRIOR START WORK
❑ REVALIDATION – EVERY SHIFT
❑ EQPMT INSPECTION PASS/STICKER ❑ WORK SCHEDULE ❑ REQUEST FOR
(Reg Card, Insurance, Road tax, INSPECTION (RFI) ❑ SUSPENSION MORE THAN
driver’s license) ❑ LIST OF EQUIPMENT 24HRS – RE APPLY
❑ CONDUCT
❑ LIST OF MANPOWER ❑ SUSPENSION IN THE EVENT OF
TOOLBOX EMERGENCY ALARM –
HANDOVER TO AA
❑ HANDOVER TO RA/AA –
CLOSED PTW SYSTEM
❑ TERMINATION – VIOLATE ZETO/
HSE RULES
PREPARED BY: NFAM
BROWNFIELD WORKFLOW REQUIREMENT BROWNFIELD
PTW APPROVAL
PERSONNEL
REQUIREMENT
❑ IC / PASSPORT JOB PACK REQUEST PERMIT ❑ ISSUED BY GTR RO
❑ OGSP / CIDB REQUIREMENT ❑ PASS GTR WL/RA TRAINING
❑ PGB HSE INDUCTION ❑ REGISTER GTR e-PTW SYSTEM
❑ E-VETTING (INSIDE PLANT)
❑ COVID-19 DECLARATION FORM AT R.O
❑ REGISTER ESSENTIAL & NON-ESSENTIAL
PTW VALIDITY
WORKER LIST FORM
❑ VISITORS – NOTIFY GTR/PMT & HOST ❑ HW/CW – 7 DAYS/SHIFT
GUIDANCE ❑ JOB METHOD STATEMENT (JMS) ❑ APPLY PTW 24HRS ❑ SUSPENSION– END OF EVERY
VEHICLE & EQUIPMENT ❑ JOB HAZARD ANALYSIS (JHA) SHIFT
REQUIREMENT PRIOR START WORK ❑ REVALIDATION – EVERY SHIFT
❑ WORK SCHEDULE ❑ CONDUCT
❑ VEHICLE INSPECTION PASS/STICKER ❑ SUSPENSION MORE THAN
(Reg Card, Insurance, Road tax, ❑ LIST OF EQUIPMENT TOOLBOX &
driver’s license) 24HRS – RE APPLY
❑ LIST OF MANPOWER – RECORD
❑ EQPMT INSPECTION PASS/STICKER ❑ SUSPENSION IN THE EVENT OF
(Reg Card, Insurance, Road tax,
driver’s license) RELEVANT CERTIFICATES EMERGENCY ALARM –
HANDOVER TO CCR/AA
❑ HANDOVER TO GTR RA/AA –
CLOSED E-PTW SYSTEM
❑ TERMINATION – VIOLATE ZETO/
HSE RULES
PREPARED BY: NFAM
FABRICATION YARD/SITE OFFICE WORKFLOW REQUIREMENT MMSJV YARD
PTW APPROVAL
PERSONNEL
REQUIREMENT
❑ IC / PASSPORT JOB PACK REQUEST PERMIT ❑ REGISTER & ISSUED BY
❑ OGSP / CIDB REQUIREMENT
❑ MEDICAL AME OHD MMSJV PTW COORDINATOR
❑ HSE INDUCTION PGB / MMSJV ❑ MANUAL PTW FORM
❑ PASS MMSJV WL/RA
❑ 1 PASSPORT SIZE PHOTOGRAPH
TRAINING
❑ RELEVENT CERTIFICATES - COMPENTENCE
PTW VALIDITY
VEHICLE & EQUIPMENT
REQUIREMENT ❑ JOB METHOD STATEMENT (JMS) ❑ APPLY PTW 24HRS ❑ HW/CW – 7 DAYS/SHIFT
❑ JOB HAZARD ANALYSIS (JHA) ❑ PRIOR START WORK ❑ REVALIDATION – IN MORNING
❑ VEHICLE INSPECTION PASS/STICKER ❑ WORK SCHEDULE CONDUCT PRIOR START WORK
(Reg Card, Insurance, Road tax, ❑ LIST OF EQUIPMENT TOOLBOX ❑ SUSPENSION – IN THE EVENT OF
driver’s license) ❑ LIST OF MANPOWER EMERGENCY / END OF DAY SHIFT
❑ TERMINATION – VIOLATE
❑ EQPMT INSPECTION PASS/STICKER
(Reg Card, Insurance, Road tax, ZETO/HSE RULES
driver’s license)
❑ REVOKED – NON-COMPLIANCE
REPORT
❑ PTW CLOSED – ALL SIGNATORIES
SIGN AND HANDOVER TO PTWC
FOR LOG-CLOSED RECORD
PREPARED BY: NFAM
COMPETENCIES
❑WORK LEADER
❑EXCAVATION SUPERVISOR
❑AESP & AGTES
❑LIFTING SUPERVISOR
❑SITE SAFETY SUPERVISOR
❑FIRST AIDER
❑WELDER
❑BENDING SUPERVISOR
❑MACHINE OPERATOR
❑SCAFFOLDER
❑Etc…..
HOT WORK PTW REQUIREMENT
TOOL BOX MEETING
1 TIME & PLACE?
2 TOPIC TO DISCUSS?
3 ✓ COMPLETE TOOLBOX MEETING FORM.
✓ ATTACH 1 COPY WITH PTW
✓ SUBMIT 1 COPY TO MMSJV HSE DEPARTMENT
GREENFIELD HSE INDUCTION – ID PASS & STICKER
FIXED ON LEFT SIDE OF YOUR SAFETY HELMET
VALID 1 YEAR
SAFE KEEPING INSIDE YOUR WALLET
GRAPHITE PASS STICKER
VEHICLE REQUIREMENT
✓ JPJ COMPLIANCE
✓ VEHICLE INSPECTION FORM
✓ VEHICLE PASS (6MONTHS)
MACHINERY & EQPMT REQUIREMENT
✓ FMA COMPLIANCE
✓ MACHINERY & EQPMT INSPECTION FORM
✓ MACHINERY & EQPMT PASS (6MONTHS)
PORTABLE ELECTRICAL & TOOLS (PETI) REQ
✓ SIRIM COMPLIANCE
✓ PETI INSPECTION FORM
✓ PETI PASS (6MONTHS)
STOP WORK AUTHORITY
It is MMSJV policy to empower staff and workers who work at the site to stop work or
ongoing task or the right not to continue working if he/she observe any condition following:
Unsafe or pose threat Unsafe or cause adverse Violation of PTW
which can endanger impact to property or the requirements.
oneself and/or others
environment
Stop Work when the working Stop Work when the Encourage every Manage Stop Work with
1 environment is unsafe 2 worker feels unsafe to work 3 4personnel to raise Stop transparency and integrity
Hentikan Kerja apabila Hentikan Kerja apabila Work when unsafe Urus Hentikan Kerja dengan
persekitaran kerja tidak Galakkan setiap pekerja ketelusan dan integriti
selamat pekerja berasa tidak
untuk Hentikan Kerja
selamat untuk bekerja
apabila keadaan tidak
selamat
Stop Work
Stop Work & Action Taken (SWAT) Process
Action Taken SW AT PREVENT INCIDENT through
proactive hazard recognition
& GENERATIVE HSE CULTURE
1 2 3 4 5
UA & UC GOOD CATCH PAUSE! STEP IN SWAT DATABASE
Unsafe act or unsafe On the spot unsafe A mini Stop Work via Jom Corrective intervention to Record of SWAT
condition finding that is observation during Patuh & Tegur concept: address issue from PAUSE! performed as a HSE
walkabout that might • Pause the work leading indicator as well as
localized and can be lead to Rating 3 and • Rectify the issue • Counselling a measure of Generative
quickly rectified above incident, but is • Resume work • Coaching
localized and can be • Stand Down HSE Culture
(Note: However not all UAUC • Video Show
need to be captured under SWAT quickly rectified
database)
START
SWA Categories
How to report SASC,UAUC & GRIEVANCE
• Notify to HSE MMSJV or notify PGB
• Scan to the QR code
QR CODE ONLINE SASC, UAUC & GRIEVANCE
Identify Unsafe Acts & Unsafe Conditions from this pictures
EMERGENCY RESPONSE PLAN (ERP)
ENGINEERING PROCUREMENT, CONSTRUCTION & COMMISSIONING (EPCC) OF
PGU-I GAS PIPELINE REPLACEMENT (GRAPHITE) PROJECT
INCIDENT REPORTING PROCEDURE
ENGINEERING PROCUREMENT, CONSTRUCTION & COMMISSIONING (EPCC) OF
PGU-I GAS PIPELINE REPLACEMENT (GRAPHITE) PROJECT
REPORT ALL
FATALITY, SERIOUS INJURY, PROPERTY
DAMAGE, NEAR MISS, FAC, MTC, LTI,
DANGEROUS OCCURANCE
OR
ENVIRONMENTAL ACCIDENT
OR
SECURITY INCIDENT
Report any injury or incident immediately to:
• Your immediate supervisor, First Aider, HSE, CM & PM
• Assess / treatment the Injured Person by First Aider
• Send the IP to Hospital Kemaman – Dial 999. Ensure that there is always
an accompanying Supervisor with the IP, to assist in registration and
keep relevant parties updated on the status.
• If DEATH – Report to POLICE & JKKP immediately and don’t try to
remove the victim / evident
WHAT IS ENVIRONMENT?
The physical factors of the surroundings of the human beings including land,
water, atmosphere, climate, sound, odor, taste, the biological factors of animals
and plants and the social factor of aesthetics.” Environmental Quality Act, 1974
Environmental Requirements for GRAPHITE
Environmental Quality Act, 1974
main legislation to control and abate
pollution issues
EQ (EIA-Prescribed activities –
Construction of on-shore
Pipeline)
• Project was subject to Environmental
Impacts Assessment
• EIA was submitted on 11 June 2019 and
approved by DOE Terengganu on 18
June 2019
Other Relevant Environmental Requirements
• Environmental Management Plan
• Local Government Act, 1976
• Street, Drainage and Building Act, 1974
• Town and Country Planning Act, 1976
• The Planning Guidelines For Environmental Noise Limits
and Control
• The Planning Guidelines For Vibration Limits and
Control in the Environmental
• Guidelines for Prevention and Control of Soil Erosion
and Siltation in Malaysia – LDP2M2
• Guideline for Erosion and Sediment Control in
Malaysia
• EIA Guideline in Malaysia
Integrated HSSE Policy