Penetrations and Closures n GIB ® Fire Rated Systems Penetrations in GIB ® Fire Rated Systems www.gib.co.nz CBI 5113 August 2003

Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by , 2016-02-14 23:51:02

CBI 5113 Penetrations August 2003 and Closures ...

Penetrations and Closures n GIB ® Fire Rated Systems Penetrations in GIB ® Fire Rated Systems www.gib.co.nz CBI 5113 August 2003

Penetrations CBI 5113
and CloPseunreetrsations August 2003
RnatGeIdBS® FiSyniysrsGetteeIBmm® sFsire Rated

www.gib.co.nz



Penetrations in fire rated construction can allow spread of fire
from one firecell to another if they are not correctly fire
rated. Poorly installed penetrations can compromise the
fire resistance rating and in turn could compromise the
health and life safety of building occupants.

This book offers systems to fire rate penetrations
through GIB® Fire Rated Systems. At the rear of the
book there are pages outlining non GIB® proprietary

solutions covering a range of suppliers, products
and/or systems.

Winstone Wallboards Ltd accepts no liability if
the systems are not used in accordance with
instructions contained in this book. Substitution of
specified or recommended components with alter-
native brands can compromise the performance of
the system dramatically.

Winstone Wallboards Ltd accepts no liability for the
Proprietary System listings. It has listed these
products solely on the basis of information provided
by the manufacturer at the time of publication
about their suitability for installation in specific GIB®
Fire Rated systems. Winstone Wallboards has not
independently verified this information and accepts
no responsibility for its accuracy.

This publication may be superseded by a new publication.
Winstone Wallboards Ltd accepts no liability for reliance
upon publications that have been superseded. Check the
current index of publications contained in your GIB®
Technical Manual before using this publication. If you are
unsure whether this is the current publication, simply call the
GIB® Helpline on 0800 100 442.

TABLE OF CONTENTS

PAGE No.

Introduction 3

Cable Penetrations for Lighting Fixtures in Ceilings 4

Electrical Cable Penetrations in Walls 4

Sprinkler Penetrations in Ceilings 5

Flush Boxes in Walls 6

Larger Recesses in Walls 7

Recessed Light Fittings 8

Plastic Pipes in Walls and Floor/Ceiling Systems 10

Metal Pipes in Walls – Pipe Penetrates One Side of Fire Separation Only 11

Fire Stopping of Metal Pipes Through GIB® FRR Walls 12

GIB® Tile Access Hatch for Suspended Ceilings 15

Proprietary Products and Systems 16

List of Figures and Tables

Figure 1. Cable Penetrations – Ceilings 4

Figure 2. Cable Penetrations – Walls 4

Figure 3. Sprinkler Penetration – Ceilings 5

Figure 4. Construction of the switch box baffle fire stops for symmetrical

(two-way) timber framed fire separations or universal (one-way) walls 6

Figure 5. Construction of the switch box baffle fire stops for symmetrical

(two-way) steel framed fire separations or universal (one-way) walls 7

Figure 6. Construction of fire rated larger recesses in walls for symmetrical

(two-way) timber framed fire separations or universal (one-way) walls. 7

Figure 7. Construction of fire rated larger recesses in walls for symmetrical

(two-way) steel framed fire separations or universal (one-way) walls. 7

Figure 8. Installation of Recessed Light Fittings in any Ceiling Suspended from

GIB® Fire Rated Floor/Ceiling or Ceiling System 8

Figure 9. Installation of Recessed Light Fittings in type GBSC Fire Rated

Suspended Grid Systems (Sect A-A). 9

Figure 10. Installation of Recessed Light Fittings in type GBSC Fire Rated

Suspended Grid Systems (Sect B-B). 9

Figure 11. Installation of Recessed Light Fittings in type GBFC and GBTP

Fire Rated Floor Ceilings (Recessed Model Shown as Example) 10

Figure 12. Metal Pipes in Timber Framed Walls 11

Figure 13. Metal Pipes in Steel Framed Walls 11

Figure 14. Metal Pipes through GIB® Fire Rated Walls 12

Figure 15. Lagging for Metal Pipes 13

Figure 16. Radiation Guards Option 1 (Both sides of wall) 14

Figure 17. Radiation Guards Option 2 (Both sides of wall) 14

Figure 18. Tile Hatch Construction 15

Table 1. Additional Requirements of Metal Pipes through GIB® Fire Rated Walls 12

Table 2. Ceramic Fibre Insulation Details 13

2

Introduction

The New Zealand Building Code
Service penetrations through fire rated construction covered by Building Consent must be fire
stopped by validated methods in accordance with the requirements of the NZBC. A method
of compliance with the NZBC is given in the Approved Documents for fire, Acceptable Solution
C/AS1.
In order to meet the provisions of the NZBC, certain construction elements are required to
provide a Fire Resistance Rating (FRR). This includes walls, floor/ceilings, columns, beams,
doors and windows. The FRR can arise out of a need to prevent internal fire spread (F rating),
or to prevent structural collapse close to a relevant boundary and fire spread through external
walls (S rating).
General Notes
This publication gives details of the installation of penetrations through GIB® Fire Rated Systems.

• The continuity and effectiveness of fire separations must be maintained around
penetrations. Where a difference exists between the FRR of the penetration seal or closure
and the FRR of the GIB® Fire Rated system, the lower FRR governs.

• All the products or systems listed are suitable for installation into GIB® Fire Rated Systems.
They have been tested or assessed by the Building Research Association of New Zealand
(BRANZ), or other registered testing laboratory.

• Penetration options (pages 4-15) have been illustrated and specified in detail. Testing of
these systems has been carried out by Winstone Wallboards Limited.

• Proprietary systems (pages 16-24) are presented as general descriptions covering ranges
of products or systems. Testing of the systems has been carried out by the systems
supplier. Specific details of systems and required installation details, must be
obtained from the listed supplier. The list does not exclude other proprietary
systems and is a list of systems available at the time of publication that provided
evidence that they were suitable for installation in specific GIB® Fire Rated Systems.

• The proprietary products and systems listed have been examined for installation only with
the GIB® Fire Rated System listed, and are not necessarily suitable for installation in other
systems of higher FRR.

• Suppliers of penetration seals are continually extending their product and systems range
and should be contacted directly for details of new products since date of this publication.

• Where products or systems are listed as suitable for installation into loadbearing elements,
they must be installed so that all loads are carried by the loadbearing element, and no load
is imposed on the penetration or closure.

• The specifications for the GIB® Systems referred to are as given in Winstone Wallboard’s
literature “GIB® Fire Rated Systems,” 2001.

3

Cable Penetrations for Lighting Fixtures in Ceilings

Suitable for all GIB® floor/ceiling or universal ceiling systems with a
(120)/120/120 FRR or less.

• Surface mounted fixtures are permitted provided the penetration for the electric cable is fire
stopped as shown below.

Electrical cable

GIB® Plasterboard Ceiling Linings Fire rated sealant
Either:
Figure 1 • Flamex One (Fosroc)
Cable Penetrations – Ceilings • Pyropanel Multiflex

(Forman Building Systems Ltd)

15mm maximum
diameter hole

Electrical Cable Penetrations in Walls
Suitable for all GIB® Fire Rated Walls with a (120)/120/120 FRR or less.

GIB® Plasterboard

Fire Rated Sealant Electrical cable
Either:
• Flamex One (FOSROC)
• Pyropanel Multiflex

(Forman Building Systems Ltd)

15mm maximum
diameter hole

Figure 2
Cable Penetrations – Walls

4

Sprinkler Penetrations in Ceilings

Suitable for installation in all GIB® floor/ceiling or universal ceiling
systems with a (120)/120/120 FRR or less.

• Keep penetration hole to minimum.
• Do not damage GIB® Plasterboard.
• Fill gap with a Fire rated sealant, this may be:-

Flamex One (FOSROC)
Pyropanel Multiflex (Forman Building Systems Ltd)
• Support sprinkler pipework independently from GIB® Plasterboard ceiling.

Pipework may be
metal or CPVC

Support sprinkler pipework
independently from
GIB® Plasterboard

No more Keep penetration hole to minimum
than 5mm

Fire Rated Sealant Do not damage GIB® Plasterboard ceiling
Either:
• Flamex One (FOSROC)
• Pyropanel Multiflex

(Forman Building Systems Ltd)

Figure 3
Sprinkler Penetrations – Ceilings

5

Flush Boxes in Walls

Suitable for all GIB® Fire Rated Walls with a (120)/120/120 FRR or less.

Flush boxes may be installed into vertical fire separations using fire stop baffles constructed as
illustrated below. The following other conditions apply:
• Back to back flush boxes are not permitted in the same stud cavity.
• Either steel or plastic flush or surface mounted flush boxes may be used.
• Up to two single width flush boxes or one double width flush box is permitted per

stud cavity.
• Wall linings are not fixed to the framing which supports the baffle boards.
Alternatively, fire rated flush boxes can be used.

GIB® Plasterboard
wall linings

Timber nog

Plastic or steel GIB®
flush boxes, to one Plasterboard
side only within wall linings
same stud cavity
Protect bottom plate or nog
GIB® Plasterboard baffle of below flush box
same thickness and type as
wall linings

Figure 4.
Construction of the flush box baffle fire stop for symmetrical (two-way)
timber framed fire separations or universal (one-way) walls.

GIB® Plasterboard Timber Nog
wall linings

Solid timber from floor to
underside of nog

Steel stud

Plastic or GIB® Plasterboard
steel flush boxes wall linings
to one side only
within the same stud cavity Protect bottom plate or nog
below flush box
GIB® Plasterboard
baffle same thickness and
type as linings

Figure 5.
Construction of the flush box baffle fire stop for symmetrical (two-way)
steel framed fire separations or universal (one-way) walls.

6

Larger Recesses in Walls

Suitable for all GIB® Fire Rated Walls with a (120)/120/120 FRR or less.

• This solution is for larger recessed fixtures such as meter boxes, fire hose reels, etc.

GIB® Plasterboard GIB® Plasterboard baffle of
wall linings same thickness and type
as wall linings.
GIB® Plasterboard baffle
of same thickness and Timber nog
type as wall linings.

600mm max.

500mm
max.

Metal box Timber nog
eg, meter box, FHR
cabinet

Figure 6.
Construction of fire rated larger recesses in walls for symmetrical (two-way) timber
framed fire separations or universal (one-way) walls.

GIB® Plasterboard baffle GIB® Plasterboard baffle
of same thickness and of same thickness and
type as wall linings. type as wall linings.

GIB® Plasterboard Timber nog
wall linings

600mm max. 500mm
max.
Metal box
eg, meter box, Timber
FHR cabinet Packer to
suit box

Timber nog

Figure 7.
Construction of fire rated larger recesses in walls for symmetrical (two-way) steel
framed fire separations or universal (one-way) walls.

7

Recessed Light Fittings

Suitable for all GIB® Floor/Ceiling or Universal Ceilings with a
(120)/120/120 FRR or less.

General Installation of Recessed Light Fittings
Installation methods vary in detail but in general there are 4 basic options:

Option A Light fitting module is designed to fit inside a suspended metal grid which is also
used to support ceiling tiles (which may be interchangeable with the lighting
Option B module).
Option C Light fitting fits into a neat hole in the ceiling lining and is supported by fittings
Option D which rest on the linings.
Light fitting fits into a neat hole in the ceiling lining and is supported by spring
fittings which press against the edge of the hole.
Light fitting fits into an aperture which is framed out and the light fitting module is
fixed to solid framing.

Construction Methods

Method 1 is shown in Figure 8, and is suitable for light fittings installed according to installation
Option A.
The method involves the suspension of a non-fire rated suspension ceiling (into which the light
fittings are installed) below an approved GIB® fire rated ceiling or floor/ceiling. This method may
suit situations where the ceiling has numerous light fittings or where the ceiling void requires
adequate ventilation due to the heat output of the light fittings within the void.
Method 2 is shown in Figures 9 and 10 and is suitable for light fittings installed according to
installation Options B and C.
The method involves construction of a fire rated recess between the joists to which a fire rated
suspended ceiling is fixed.
The method may suit installations where there are isolated light fittings. The width of the void
(and therefore of the light fitting) is restricted due to the 600mm maximum joist spacing.
Method 3 is shown in Figure 11, and suits installation Option D. This differs from Method 2 in
that the light fitting module is securely fixed to the timber framing.
The method involves construction of a fire rated recess between joists which directly support
the ceiling linings.

Ventilation

Adequacy of air movement or ventilation is important for the correct functioning of certain
lamps or light fittings. The supplier/manufacturer of the light fittings must be consulted to
determine appropriate ventilation requirements.

Floor

GIB® Fire
Rated System
Types GBFC,
GBCJ or GBUC

75mm x 50mm Suspension
min batten Tie with
T-Section Grid

Lighting Module

Diffuser

GIB® Plasterboard

Any suspended ceiling system with ties fixed to battens.
Recessed light fittings may be installed conventionally including troffer pack
modules (shown), recessed downlights or other light fittings as required.

Figure 8.
Installation of Recessed Light Fittings in any Ceiling Suspended from
GIB® Fire Rated Floor/Ceiling or Ceiling Systems.

8

Floor/Ceiling Systems require one extra layer of GIB® Plasterboard Board Fixing Centres:
of the same type and thickness as the ceiling lining. Vertical sheets – 300mm centres
Universal Systems are lined as per ceiling. Horizontal sheets – 150mm centres

Floor

Steel stud
65mm x 34mm

Twinaplate or
timber joists fixed
@ 600mm centres

Steel stud dropper
65mm x 34mm

Strongback fixed
to dropper

Nogs ex steel stud
fixed to dropper

GIB® Plasterboard Linings as per ceiling

Sect A-A

Figure 9.
Installation of Recessed Light Fittings in type GBSC Fire Rated Suspended Grid
Systems (Sect A-A).

Floor/Ceiling Systems require one extra layer of GIB® Plasterboard Board Fixing Centres:
of the same type and thickness as the ceiling lining. Vertical sheets – 300mm centres
Universal Systems are lined as per ceiling. Horizontal sheets – 150mm centres

Timber bearer Floor
ex 100mm x 50mm
Alternative batten
GIB® Plasterboard Linings as per ceiling support via steel
Sect B-B runner fixed to joist

Blocking

Steel stud dropper
65mm x 34mm
fixed to bearer

Strongback fixed
to dropper

Intermediate nogs
ex steel stud, length
350mm, board fixing
@ 150mm centres

A

BB

Figure 10. A

Installation of Recessed Light Fittings in type GBSC Fire Rated Floor/Suspended

Grid Systems (Sect B-B).

9

Floor/Ceiling Systems require one extra layer of GIB® Plasterboard
of the same type and thickness as the ceiling lining.
Universal Systems are lined as per ceiling.

Floor

Linings as per ceiling Light fitting
module
Sect A-A
Cable
Floor/Ceiling Systems require one extra layer of GIB® Plasterboard penetration
of the same type and thickness as the ceiling lining. fire stopped
Universal Systems are lined as per ceiling. (see Fig 2)

Light fitting
module

GIB® Plasterboard as per the ceiling A

Sect B-B B B

A

Figure 11.
Installation of Recessed Light Fittings in type GBFC and GBCJ Fire Rated Floor
Ceilings (Recessed Model Shown as Example).

Plastic Pipes in Walls and Floor/Ceiling Systems

Plastic pipes melt at high temperatures and penetrations must be carefully detailed at the
building design stage.
There are no generic options available for plastic pipe penetrations through GIB® Fire Rated
Systems. For proprietary products and systems refer to page 16-19 of this publication.

10

Metal Pipes in Walls - Pipe Penetrates One Side of Fire
Separation Only

Suitable for all GIB® Fire Rated Walls with a (120)/120/120 FRR or less.

Metal pipes may penetrate one side only of vertical fire separations provided fire stop baffles
are constructed as detailed below. The following other conditions apply:
• Maximum pipe diameter is 80mm.
• Penetrations on opposite sides of the wall within the same stud cavity are not permitted.
• Only one pipe penetration per stud cavity is permitted.
• Copper and Brass pipe penetrations in walls rated (60)/60/60 require a minimum 16mm

baffle thickness. For all other ratings and materials baffle thickness may equal lining thickness.

Neat hole minimal 100mm min.
clearance
Minimal clearance.
GIB® Plasterboard baffle of same Hole plaster stopped
type and thickness as wall linings Metal pipe penetrates
fix to nogs (see notes above one side only
re copper and brass pipes) Neat hole minimal
clearance
Figure 12.
Metal Pipes in Timber Framed Walls Timber Nogs

Neat hole minimal 100mm min.
clearance
Minimal clearance.
GIB® Plasterboard baffle of same Hole plaster stopped
type and thickness as wall linings
fix to nogs (see notes above
re copper and brass pipes)

Timber Nogs Metal pipe penetrates
one side only
Figure 13.
Metal Pipes in Steel Framed Walls Neat hole minimum
clearance

11

Fire Stopping of Metal Pipes Through GIB® Fire Rated Walls

General Requirements

Metal pipe penetrations can be formed through 2-way symmetrical GIB® Fire Rated Walls using
the system described below.

The following conditions apply:
• The GIB® Fire Rated Wall must be a symmetrical two-way system
• One-way universal walls are excluded
• The pipe material must be steel, copper or brass
• The pipe diameter must not exceed 150mm
• The pipe wall thickness must not be less than 1.5mm

Fire stopping at the wall junction

Metal pipe penetrations must be fire stopped at the wall junction using the method (cavity
insulation) as described below.

GIB® Plasterboard

30mm Sealant Flamex One or
min. Pyropanel Multiflex Sealant
gunned into annular
opening depth at equals
at least depth of lining

20mm max.

150mm max

20mm max.

Metal pipe 50mm Kaowool Firemaster bound
wall thickness 1.5mm min. min. with steel tie wire
diameter 150mm max.

Figure 14. Metal pipes through GIB® Fire Rated Walls

Additional requirements

Additional requirements apply depending on the required FRR and the pipe material. The
requirement for ceramic fibre lagging or a radiation guard is to ensure that the pipe does not
conduct heat to the unexposed side of the wall which could ignite combustibles and cause fire
spread (insulation criterion).

Additional requirements FRR of timber or steel framed wall
Time up to and including
Pipe material Steel (minutes)
Copper
Brass 30 60 120

Ceramic fibre lagging OK OK OK
Radiation guard OK OK OK
OK OK No
No Required No
No No Required

Table 1. Additional requirements of metal pipes through GIB® Fire Rated Walls

12

Installation of Ceramic Fibre Lagging for Metal Pipe Fire Stops

The following system applies only to metal pipe penetrations of 60 minutes FRR where lagging
is required in accordance with Table 1.

Length (mm) Length (mm)
Fire Stopping as per Fig. 14

Thickness mm

Wall Metal pipe
Diameter 150mm max
GIB® Plasterboard
Ceramic Fibre
Figure 15. Kaowool Firemaster
Lagging for Metal Pipes bound with steel tie wire

The following table is used to determine the length and thickness of ceramic fibre to be used.

Pipe Diameter Metal Insulation Length mm (min)
Thickness mm (min)
Up to 50mm Steel 600
Copper/Brass 25 1200
Greater than 50mm 25 600
& Up to 150mm Steel 50 1200
Copper/Brass 50

Table 2. Ceramic Fibre Insulation Details

13

Installation of Radiation Guards for Metal Pipe Fire Stops

The following system applies only to metal pipe penetrations of up to and including 120 minute
FRR where radiation guards are required in accordance with Table 1.

Fire stopping as per Fig. 14 Hanger rod to ceiling
bolted to guard

Guard

450mm min. 50 50 Pipe
min. min.
GIB® Plasterboard Threaded rod
adjusters bolted
Figure 16. to guard
Option 1 – (Both sides of wall)

Fire stops as per Fig. 14 Hanger rod to ceiling GIB® Plasterboard spacers
bolted to guard Guard

450mm min. Pipe

GIB® Plasterboard
GIB® Plasterboard spacers

Figure 17.
Option 2 – (Both sides of wall)

14

GIB® Tile Access Hatch

Description: A tile laminated from GIB® Plasterboard which rests in the access opening and is
supported by the steel channels to which the suspended ceiling is fixed. This hatch may be
manufactured from available materials on site by the ceiling installer. When installed in the
systems as listed, the FRR of the system will be maintained

FRR: -/60/60 maximum

Hatch sizes permitted: Rough opening 575mm x 575mm or less

Suitable for Installation in: GBFC 15, GBFC 30, GBCJ 30, GBFC 60, GBCJ 60, GBSC 30,
GBSC 60, GBUC 15, GBUC 30, GBUC 60.

Furring channels
500mm long
at 330mm centres

Strong backs 930mm 13mm GIB® Plasterboard
long at 300mm centres strips 550mm x 75mm screw
fixed and laminated using
GIB® Cove Adhesive

TILE ACCESS HATCH
575mm x 575mm square opening

Tile rests on additional furring GIB® Plasterboard tile External angle trim
channels 4 sides @ 660 centres (same as ceiling linings) 4 edges
575mm x 575mm laminated
using GIB® Cove Adhesive GIB® Plasterboard ceiling linings

Figure 18.
Tile Hatch Construction – (for 575mm x 575mm approx rough opening)

15

Proprietary Products and Systems

Fire Sealants and Ceramic Fibre Blanket

Supplier Product

Forman Building Any branch: 0800 45 4000 Pyropanel Multiflex
Systems Ltd Auckland Ph. 09-276 4000 Sealant
Hamilton Ph. 07-847 8007
Rotorua Ph. 07-348 0951 Kaowool Firemaster
Wellington Ph. 04-568 7132 Ceramic Fibre
Christchurch Ph. 03-379 9329
Dunedin Ph. 03-474 1800

Fosroc Any branch: Flamex One Sealant
Auckland Ph. 09-273 9292
Wellington Ph. 04-568 7965
Christchurch Ph. 03-366 8194
or building supply merchants nationwide
www.fosroc.co.nz

Hilti PO Box 112-030, Penrose, Auckland Hilti CP606 fire resistant joint filler

Ph. 0800 444 585 Fax 0800 329 445 Hilti CP620 expanding fire seal

www.hilti.com Hilti CP611A Intumescent fire stop sealant

North Island Promaseal Mastic
PBS Distributors Ltd PO Box 302-202, North Shore City 1330

Ph. 09-415 4399 Fax 09-415 4398
[email protected]
South Island
Progressive Building PO Box 38 021, Christchurch
Systems (S.I.) Ltd Ph. 03-377 7406 Fax 03-377 7407
[email protected]

All Areas 0800 Call PBS, 0800 2255 727

Service Penetrations

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Pyrosleeve GV40, GV50, GV65, GV80, Penetration Suitable For Assessed By
GV100 and GV150 intumescent collars,
Forman Building Pyrosleeve for plastic pipe penetrations ranging from -/15/15 GBT15, GBTL15 BRANZ
Systems Ltd Intumescent 40mm - 150mm diameter GBSL15 Assessment
PO Box 12-349, Collar for 97/1006
Penrose, Auckland plastic pipes Pyropanel Pyrosleeve RF40, RF50, RF50,
Ph (09) 276 4000 RF65, RF80, RF100 surface mounted or -/30/30 GBT30a, GBTL30,
Fax (09) 276 4141 recess mounted both sides for pipes GBT30b, GBS30,
Freephone passing through wall GBSL30a, GBSL30b
0800 45 4000
-/60/60 GBT60a, GBTL60,
GBT60b, GBTLA60,
GBS60, GBSL60a
GBSL60b

-/90/90 GBT90, GBTL90,
GBS90, GBSL90

-/120/120 GBT120a, GBT120b,
GBTL120, GBS120

-/180/180 GBT180

Pyropanel -/120/120 GBT15, GBTL15, BRANZ
Pyrosleeve GBT30a, GBTL30, Assessment
Intumescent GBT30b, GBT60a, 99/1427
Collar for GBTL60, GBT60b,
uPVC Pipe GBT90, GBTL90,
GBTL120, GBT120a,
GBT120b, GBSL15,
GBS30, GBSL30a,
GBSL30b, GBS60,
GBSL60a, GBSL60b,
GBS90, GBSL90,
GBS120

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

16

Service Penetrations

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By

Forman Building Electrical Outlets Fire protected electrical outlets containing -/15/15 GBT15, GBTL15, BRANZ
Systems Ltd using Intumex L four layers of 2.5mm thick Intumex L -/30/30
PO Box 12-349 GBSL15 Assessment
Penrose, Auckland intumescent material -/60/60
Ph. (09) 276 4000 GBT30a, GBTL30, 96/971 &
Fax (09) 276 4141 Electrical Cables Fire protection to multi-core or bundles -/90/90 GBT30b, GBS30, 96/832
Freephone using Pyropanel bundles of electrical cables up to 65mm -/120/120
0800 45 4000 Multiflex Sealant cables up to 65mm over diameter using GBSL30a, GBSL30b
-/15/15
Pyropanel Multiflex Sealant -/30/30 GBT60a, GBTL60,
GBT60b, GBTLA60,
Fire protection to multi-core or bundles -/60/60 GBS60, GBSL60a,
of electrical cables up to 65mm overall GBSL60b
diameter using Pyropanel Multiflex Sealant -/90/90*
and fitted with a radiation shield -/120/120* GBSL90
* Insulation limited to 60 minutes if
GBT120a, GBT120b,
radiation shield not fitted GBTL120, GBS120

GBT15, GBTL15, BRANZ

GBSL15 Assessment

GBT30a, GBTL30, 96/971 &
GBT30b, GBS30, 96/823

GBSL30a, GBSL30b

GBT60a, GBTL60,
GBT60b, GBTLA60,
GBS60, GBSL60a,
GBSL60b

GBT90, GBTL90, BRANZ

GBSL90 Assessment

GBT120a, GBT120b, 96/971 &
GBTL120, GBS120 96/823

Steel and Steel pipe penetrations up to 100mm -/15/15* GBT15, GBTL15, BRANZ
-/30/30*
Copper Pipes diameter and copper pipe penetrations -/60/60* GBSL15 Assessment

using Pyropanel up to 75mm diameter sealed with -/90/90* GBT30a, GBTL30, 96/971 &
GBT30b, GBS30, 96/823
Multiflex Sealant Pyropanel Multiflex Sealant, and fitted

with a radiation shield GBSL30a, GBSL30b

* Insulation limited to 0 minutes if GBT60a, GBTL60,
radiation shield not fitted GBT60b, GBTLA60,
GBS60, GBSL60a,
GBSL60b

GBT90, GBTL90,
GBSL90

-/120/120* GBT120a, GBT120b,
GBTL120,
GBS120

Copper Pipe Copper pipe up to 50mm diameter -/60/30 GBT60a BRANZ
using Armaflex, insulated with Armaflex up to 19mm with Test
Intumex L and two layers of 2.5mm thick Intumex L Certificate
Pyropanel 35mm wide inside steel sleeve. Both #216
Multiflex faces sealed with Pyropanel Multiflex
-/60/30 Not Applicable can BRANZ
Firefly Firefly Cavity Fire and Smoke Barriers -/30/- be used as a Assessment
Passive Firefly Plus60 (up to 6.3m height) -/60/- stand-alone passive FAR1628
Fire Protection fire barrier
BRANZ
Firefly30 (up to 7m height) Assessment
FAR1726
Firefly1 (up to 7m height)
BRANZ
Assessment
FAR1626

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

17

Service Penetrations

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By
Hilti CP606
Hilti fire resistant Single pipes of cast iron, steel or copper -/15/0* GBT15, GBTL15, BRANZ
PO Box 112-030 joint filler of nominal sizes equal or less than 150mm -/30/0* GBSL15 Assessment
Penrose, Auckland Hilti CP620 and pipe wall thicknesses equal or greater FAR2051
Ph. 0800 444 584 expanding than 1.6mm sealed with Hilti CP606 fire -/60/0* GBT30a, GBTL30,
Fax 0800 329 445 fire seal resistant joint filler or Hilti CP620 expanding GBT30b, GBTL30b,
www.hilti.com Hilti CP611A fire seal, or up to 100mm diameter sealed GBS30, GBSL30a
intumescent fire with Hilti CP611A intumescent fire stop GBSL30b
stop sealant sealant applied to the full depth of the
For metal pipes plasterboard lining and of width in the GBT60a, GBTL60,
range 10 to 20mm. GBT60b, GBTLA60,
Hilti CP606 GBS60, GBSL60a,
fire resistant * For wall linings less than 26mm thick GBSL60b
joint filler the wall lining must be locally increased in
Hilti CP620 thickness to at least 26mm within 75mm -/90/0* GBT90, GBTL90,
expanding of the seals as per Figure 1 of BRANZ -/120/0 GBS90, GBSL90
fire seal Assessment FAR2051.
Hilti CP611A GBT120a,
intumescent fire GBT120b*,
stop sealant GBTL120, GBS120*
For electrical
cables Bundles of power cables up to 30mm -/15/15* GBT15, GBTL15, BRANZ
overall sealed with CP611A intumescent -/30/30* GBSL15 Assessment
Hilti CP606 fire stopping mastic applied to the full FAR2051
fire resistant depth of the plasterboard lining and to a -/60/30* GBT30a, GBTL30,
joint filler width in the range of 5 to 22mm. GBT30b, GBTL30b,
Hilti CP649 -/90/30* GBS30, GBSL30a,
Pipe Wraps * For wall linings less than 26mm thick GBSL30b
For plastic the wall lining must be locally increased in
pipes thickness to at least 26mm with 75mm GBT60a, GBTL60,
of the seals as per Figure 1 of BRANZ GBT60b, GBTLA60,
Assessment FAR2051. GBS60, GBSL60a,
GBSL60b

GBT90, GBTL90,
GBS90, GBSL90

-/120/30 GBT120a,
GBT120b*,
GBTL120, GBS120*

Bundles of communication cables up to -/15/15* GBT15, GBTL15, BRANZ
60 x 50 pair or single power cables up to -/30/30* GBSL15 Assessment
54mm diameter or bundles of power cables FAR2051
up to 80mm x 40mm overall on steel cable -/60/60* GBT30a, GBTL30,
trays sealed with Hilti CP606 fire resistant GBT30b, GBTL30b,
joint filler or Hilti CP620 expanding fire seal -/90/60* GBS30, GBSL30a,
applied to the full depth of the plasterboard -/120/60 GBSL30b
lining and to a width in the range 5 to 55mm.
GBT60a, GBTL60,
* For wall linings less than 26mm thick GBT60b, GBTLA60,
the wall lining must be locally increased in GBS60, GBSL60a,
thickness to at least 26mm with 75mm GBSL60b
of the seals as per Figure 1 of BRANZ
Assessment FAR2051. GBT90, GBTL90,
GBS90, GBSL90

GBT120a,
GBT120b*,
GBTL120, GBS120*

Single unplasticised polyvinyl chloride -/15/15* GBT, GBTL15, BRANZ
(uPVC) pipes up to nominal 100m diameter -/30/15* GBSL15 Assessment
sealed with Hilti CP649/110 pipe wrap or FAR2051
up to 50mm sealed with CP649/50 pipe -/60/60* GBT30a, GBTL30
wrap centrally placed in a steel sleeve GBT30b, GBTL30b,
spanning the wall linings and any annular -/90/90* GBS30, GBSL30a,
gaps sealed with CP606 sealant. -/120/90 GBSL30b
-/120/120
* For wall linings less than 19mm thick GBT60a, GBTL60,
the wall must be locally increased in GBT60b, GBTLA60,
thickness to at least 19mm within 75mm GBS60, GBSL60a,
of the seals as per Figure 1 of BRANZ GBSL60b
Assessment FAR2051.
GBT90, GBTL90,
# For wall linings less than 26mm thick GBS90, GBSL90
the wall must be locally increased in
thickness to at least 26mm within 75mm GBT120b, GBS120
of the seals as per Figure 1 of BRANZ
Assessment FAR2051. GBT120a,
GBT120b#,
GBFT120, GBS120#

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

18

Service Penetrations

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By

North Island: Intumescent Intumescent pipe wraps with -/60/30 GBT60a BRANZ
PBS Distributors Ltd Pipe Wraps for Promafoam-C with Promaseal mastic for (100 x 50mm Test Report
PO Box 302-202 steel pipes sealing around insulated steel pipes -/60/30 nominal studs) FR2182
North Shore City 1330 Promafoam-C Promafoam-C with Promaseal mastic for
Ph. (09) 415 4399 for steel pipes sealing around steel pipes -/15/15 up to GBT60a BRANZ
Fax (09) 415 4398 -/180/15 (100 x 50mm Test Report
[email protected] Promaseal IBS Copper pipe up to 100mm diameter. (note nominal studs) FR2284
Foam Strip Annular gap around copper pipe filled insulation
South Island: for copper with suitably sized Promaseal IBS foam GBT15, GBT30a, CSIRO
Progressive Building pipes strip and covered with Promaseal rating only to GBS30, GBT30b, Assessment
Systems (S.I.) Ltd Acrylic Sealant 15 minutes) GBT60a, GBS60, FCO2191
PO Box 38-021 Promaseal GBT60b, GBT90, CSIRO
Christchurch Mastic for uPVC uPVC conduit, filled around cables, and -/60/30 GBS90, GBT120a,
Ph. (03) 377 7406 conduit and externally sealed with Promaseal mastic GBT120b, GBS120, Test Report
Fax (03) 415 4398 cables -/60/60 GBT180 FSP0097
[email protected] Promaseal Promaseal mastic around electrical cables
Mastic for GBT60a (100 x BRANZ
All Areas electric cables (100 x 50mm Test Report
Call PBS, nominal studs) FR2284
0800 2255 727
GBT60a BRANZ
(100 x 50mm Test Report
nominal studs) FR2284

Promafoam-C Promafoam-C to seal around electrical -/60/30 GBT60a BRANZ
for electrical cables on cable trays, surface sealed with (100 x 50mm Test Report
cables on Promaseal mastic nominal studs) FR2284
cable trays

Promaseal IBS Cable trays. Annular gap at perimeter -/15/15 up to GBT15, GBT30a, CSIRO
Foam Strip Assessment
for cable trays of cable tray penetration filled with layers of /120/120 GBS30, GBT30b, FCO2191
CSIRO
Promaseal IBS 50x20 and covered with GBT60a, GBS60, Test Report
FSV0100
Promaseal Acrylic Sealant. GBT60b, GBT90,

GBS90, GBT120a,

GBT120b, GBS120

Promaseal IBS Single or bunches of electrical cables. -/15/15 up to GBT15, GBT30a, CSIRO
Foam Strip Maximum opening size 110mm x 30mm.
for electrical Annular gap around perimeter of cable -/180/180 GBS30, GBT30b, Assessment
cables should be filled with Promaseal IBS and
coated with Promaseal Acrylic Sealant. GBT60a, GBS60, FCO2191

GBT60b, GBT90, and

GBS90, GBT120a, CSIRO

GBT120b, GBS120, Test Report

GBT180 FSP0087

PBS PBS intumescent lining and ceramic fibre -/60/30 GBT60a BRANZ
Intumescent insulation for lift control boxes (100 x 50mm Test Report
Lining for lift nominal studs) 2182
control boxes

PBS PBS intumescent blocks for protection of -/60/30 GBT60a BRANZ
Intumescent steel electrical outlet boxes (100 x 50mm Test Report
Blocks for nominal studs) 2182
electrical outlets

PBS PBS intumescent blocks for protection of -/60/60 GBS60 BRANZ
Intumescent steel electrical outlet boxes Assessment
Blocks for 95/808
electrical outlets

Vicubrick Vicubrick bulkhead in Promatect sleeve, -/60/60 GBS60 BRANZ
Bulkhead in penetrated by electrical cables with Test Report
Promatect optional cable trays, sealed with FP2117
Sleeve for Promaseal mastic
electrical cables
and cable trays

Intumescent Intumescent pipe wraps and Promaseal -/60/60 GBT60a (100 x BRANZ

Pipe Wraps mastic to seal uPVC pipes through walls 50mm nominal studs) Test Report

for uPVC pipes and ceilings GBFC60 FR2284

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

19

Fire Rated Doors

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By

Adams Steelguard Steel framed Steel framed fully glazed double leaf door -/60/- GBT60a, GBT60b, Not available
Ltd fire rated doors in a glazed screen, available with a range -/60/- GBTL60, GBT120a,
PO Box 100 555, of glass types. GBT120b,
NSMC, Auckland GBTL120, GBT180
Ph. (09) 443 2722 Single leaf door in steel framed fully glazed
Fax (09 443 7877 screen with optional opening vents, GBT60a, GBT60b, Not available
[email protected] available with a range of glass types and GBTL60, GBT120a,
www.steelguard.co.nz pane sizes. GBT120b,
GBTL120, GBT180

Steel framed fully glazed double acting -/60/- GBT60a, GBT60b, Not available
double leaf door available in a range GBTL60, GBT120a,
of sizes and configurations. GBT120b,
GBTL120, GBT180,
GBS60, GBSL60a,
GBSL60b, GBS90,
GBSL90, GBS120

Associated Fire Door Single or double Single or double leaf doors with optional -/30/30 GBT30a, GBT30b, Not available
with vision GBTL30 (all with Not available
Manufacturers Ltd leaf fire doors vision panels, side or over lights, available panel or side nominal 100mm x
or over light 50mm studs)
c/- PO Box 27-061, with a range of hardware.
-/60/60 GBT60a, GBT60b,
Mt Roskill, Auckland (single leaf), GBTL60

Ph. (09) 620 9059 Single or double leaf doors with optional -/60/30
Fax (09) 620 7585 vision panels, over lights or over panels, (double leaf)

available with a range of hardware

and facings.

Insulation 0 minutes if vision panel, side

or over light fitted.

Metalbilt Timber fire Fyrecore timber fire doors in timber frames -/30/30, GBT30a, GBTL30, Not available
PO Box 71-169, rated doors
Rosebank, Auckland with optional sidelight, glazed overlight, or or -/30/- if GBT30b*, GBT60a*,
Ph. (09) 828 1167
Fax (09) 828 6358 solid transom panels . glazed with GBS30, GBS60

non-insulating *Minimum stud size

glass nominal 100 x 50mm

PO Box 38-933 Fyresafe timber clad fire doors in -/60/30, GBT30a, GBT60a, Not available
Wellington Mail Centre timber frames. or -/30/30 in GBT60b, GBTL60,
Ph. (04) 568 2933 a 30 minute GBS30, GBSL30
Fax (04) 568 7337 GBS60, GBSL60
rated wall

PO Box 6033 Timber and Fyresafe timber or steel clad fire doors -/wall integrity GBT60a, GBT60b, Not available
Riccarton steel fire in steel frames with optional solid rating/30 GBTL60, GBT120a,
Christchurch rated doors transom panels. GBT120b, GBTL120,
Ph. (03) 338 2600 GBT180, GBS60,
Fax (03) 338 4386 GBSL60a, GBSL60b,
GBS120

Fyresafe timber clad interconnecting fire -/120/60, GBT60a, GBT60b, Not available
doors in steel frames. or -/60/60 GBTL60, GBT120a,
in 60 minute GBT120b, GBTL120,
rated wall GBS60, GBSL60a,
GBSL60b, GBS120

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

20

Fire Rated Doors

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By
Solid core fire doors in timber frames,
New Zealand Fire Timber fire single or double leaf in a range of leaf sizes, -/15/15* GBS30, GBT15 Not available
Doors Ltd rated doors with optional vision panels, and with many -/30/30*
PO Box 12-709, hardware options. Some doors may have GBS30, GBT30b
Penrose, Auckland optional side lights or overlights. -/60/60* (100 x 50mm stud)
Ph. (09) 579 8895
Fax (09) 579 2933 *Insulation 0 minutes if non-insulating Steel or timber
vision panel, side light or over light fitted. framed walls of FRR
-/60/60 or higher

Timber fire doors in timber frames with -/30/30, GBT30a, GBTL30, Not available
optional sidelight, glazed overlight, or or -/30/- if GBT30b*, GBT60a*,
solid transom panels glazed with GBS30, GBS60
non-insulating *Minimum stud size

glass nominal 100 x 50mm

E Core timber clad fire doors in -/60/30, GBT30a, GBT60a, Not available
timber frames. or -/30/30 in GBT60b, GBTL60,
a 30 minute GBS30, GBSL30,
GBS60, GBSL60
rated wall

Timber and E Core timber or steel clad fire doors -/wall GBT60a, GBT60b, Not available
steel fire in steel frames with optional solid integrity GBTL60, GBT120a,
rated doors transom panels. GBT120b, GBTL120,
rating GBT180, GBS60,
/30 GBSL60, GBSL60a,
GBS60b, GBS120

E Core timber clad interconnecting -/120/60, GBT60a, GBT60b, Not available
fire doors in steel frames. or -/60/60 GBTL60, GBT120a,
in 60 minute GBT120b, GBTL120,
rated wall GBS60, GBSL60a,
GBSL60b, GBS120

Pacific Fire Door Hinged Doors Single or double leaf hinged doors in timber -/15/15* GBT30a, GBT30b, BRANZ
Systems Ltd or steel frames, available in a range of GBT60a, GBT60b, Assessment
PO Box 36-065, sizes and configurations, including side and GBSL30b, GBS60, 91/146 &
Moera, Lower Hutt over lights and panels, and with a range GBUW30a, 92/204
Ph. (04) 568 6109 of vision panels and hardware options. GBUW30b & 96/944
Fax (04) 568 8531
*Insulation 0 minutes if non-insulating -/30/30* GBT30a, GBT30b,
vision panel fitted. GBT60a, GBT60b,
GBSL30b, GBS60,
GBUW30a,
GBUW30b

-/60/60* GBT60a, GBT60b,
GBS60, GBUW60a
GBUW60

-/90/90* GBT90 (nominal 100
x 50mm minimum
studs), GBSL60a,
GBSL60b, GBS120,
GBUW90

-/120/90* GBT180

Double Acting Single or double leaf double acting doors -/30/30* GBT60a, GBT60b, BRANZ
Doors in steel frames, available in a range of sizes -/60/60* GBS60, GBUW60a, Assessment
and configurations, and with a range of GBUW30b 91/146 &
Sliding Doors vision panels and hardware options. 92/204
GBT60a, GBT60b, & 96/944
* Insulation 0 minutes if non-insulating GBS60, GBUW60a,
vision panel fitted GBUW60b

-/120/60 GBT180

Single panel sliding doors on steel -/30/30* GBT60a, GBT60b, BRANZ
tracks, available in a range of sizes and -/90/30*
configurations, and with a range of facing, -/120/120* GBTL60 Assessment
vision panel and hardware options.
GBT120a, GBT120b, 91/146 &
*Insulation 0 minutes if non-insulating 92/204
vision panel fitted. GBTL120
& 96/944
GBT180

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

21

Fire Rated Windows, Screens and Miscellaneous Access Panels

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Steel framed fully glazed screen with Penetration Suitable For Assessed By
optional single leaf door and/or opening
Adams Steelguard Steel framed vents, available with a range of glass -/60/- GBT60a, GBT60b, Not available
Ltd fire rated types and pane sizes GBTL60, GBT120a,
PO Box 100 555, windows GBT120b, GBTL120,
NMSC, Auckland Steel framed insulating glazed screen, GBT180
Auckland available in a range of configurations
Ph. (09) 443 2722 and pane sizes.
Fax (09 443 7877
Steel framed insulating glazed screen,
[email protected] available in a range of configurations -/30/30 GBT30a, GBT30b, Not available
www.steelguard.co.nz and pane sizes in 30 minute GBTL30, GBT60a,
rated wall, GBT60b, GBT120a,
Fire Window in timber frame with or -/60/30 GBT120b, GBTL120,
with various glass types in 60 minute GBT180, GBS60 with
wall or better 102 x 51mm studs
Firesafe hinged or screw fixed
access panels. -/60/60 GBT60a, GBT60b, Not available
GBTL60, GBT120a,
Timber or steel framed windows available GBT120b, GBTL120,
in single or multiple units, with a variety of GBT180, GBS60
glass options with 102 x 51 studs

Metalbilt Fire rated Steel framed windows available in -/30/-, or GBT30a, GBTL30, Not available
PO Box 71-169, windows single or multiple units, with a variety of -/30/30 with
Rosebank, Auckland glass options
Ph. (09) 828 1167 Fire rated Steel framed windows available in insulating
Fax (09) 828 6358 access panel single or multiple units, with a variety of glass
glass options
For Wellington and VP90-FH Large Access Hatch for -/120/30 GBT60a, GBT60b Not available
Christchurch address floor/ceiling or ceiling systems in 120 or 180 GBTL60, GBT90,
see Fire Rated Doors incorporating a steel frame to be minute rated GBTL90, GBT120a,
fixed to the floor framing members wall, or -/wall GBT120b, GBTL120,
Fyreguard fire rated ceiling access hatch integrity/30 GBT180, GBS60,
Product Data Sheet No. FGCH-99 for 60 or 90 GBSL60a, GBSL60b,

Fyreguard fire rated wall access hatch. minute GBS90, GBSL90
Product Data Sheet No. FGWH-99. rated walls
Note: fire exposure from the hatch
Pacific Fire Door Timber or steel rated ceiling -/30/30, GBT30a, GBT30b, BRANZ
Systems Ltd framed fire or -/30/- GBS90, GBSL30b, Assessment
PO Box 36-065, rated windows with non- GBUW30a, 91/146 &
Moera, Lower Hutt insulating GBUW30b 92/204 &
Ph. (04) 568 6109 96/944
Fax (04) 568 8531 glass

-/60/- GBT60a, GBT60b,
GBS60, GBUW60a,
GBUW60b

-/120/- GBT120a, GBT120b,
GBS120

Access hatch -/90/90 GBFC90 Fire Logical
letter of
-/60/60 opinion
14/11/90
-/120/60
North Island: Fire rated (Note GBFC15, GBUC15, BRANZ
PBS Distributors Ltd access hatch GBFC30, GBCJ30, Project
PO Box 302-202 insulation GBFC30, GBCJ30, FC2104
North Shore City 1330 rating only GBSC30, GBUC30a,
Ph. (09) 415 4399 GBUC30b GBSC60,
Fax (09) 415 4398 up to GBCJ60, GBFC60,
[email protected] 60 minutes) GBUC60

South Island: GBSL15, GBS30, BRANZ
Progressive Building GBSL30a, Project
Systems (S.I.) Ltd GBSL30b, FC2104
PO Box 38-021 GBS60, GBSL60a,
Christchurch GBSL60b, GBS90,
Ph. (03) 377 7406 GBSL90, GBS120
Fax (03) 377 7407
[email protected]

All Areas
0800 Call PBS,
0800 2255 727

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

22

Ducts and Dampers

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By
Holyoake IBD Fire Damper. Integrity and Not available
Associated Fire Door Duct doors Interlocking blade fire dampers used as insulation as GBT30a, GBT30b,
Manufacturers Ltd duct, plenum or air transfer shut off in the GBTL30 BRANZ
c/- PO Box 27-061, event of fire. Available in a range of sizes. for wall (all with 100mm Assessment
Mt Roskill, Auckland Holyoake HFS-R-146 Fire/Smoke Damper. x 50mm studs) 96/919
Ph. (09) 620 9059 Leakage rated multi-leaf steel fire damper -/30/- GBT60a, GBT60b,
Fax (09) 620 7585 for the prevention of the spread of fire -/60/- GBTL60
and/or smoke through ducted air systems,
Holyoake Industries Fire Damper or between plenums. Available in a range -/30/- GBS30,
Ltd of sizes. -/60/- GBS60
PO Box 58-479 FD100 sealing system for gaps around
Greenmount fire dampers -/60/- GBS30, BRANZ
Auckland FD100 -/15/15 GBS60 Assessment
Ph. (09) 274 4144 up to 96/1019
Fax (09) 274 4288 Annular gap around damper to be sealed -/180/180
[email protected] using suitably sized Promaseal IBS and
www.holyoake.co.nz coated with Promaseal Acrylic Sealant
Suitable only for the tested damper
North Island: Promafoam installations (consult the supplier for details) BRANZ
Test Report
PBS Distributors Ltd Sealing system GBT60a (100mm x FR2284
50mm nominal studs)
PO Box 302-202 around Fire
GBT15, GBT30a, CSIRO
North Shore City 1330 Dampers GBS30, GBT30b, Assessment
GBT60a, GBS60, FCO2191
Ph. (09) 415 4399 Promaseal IBS GBT60b, GBT90, CSIRO
Fax (09) 415 4398 Foam Strip GBS90, GBT120a, Assessment
[email protected] GBT120b, GBS120, FCO2106
GBT180
South Island:
Progressive Building
Systems (S.I.) Ltd
PO Box 38-021
Christchurch
Ph. (03) 377 7406
Fax (03) 377 7407
[email protected]

All Areas
0800 Call PBS,
0800 2255 727

Ravenscroft Fire Damper Halton Fire Dampers BSD-PW100 to -/15/- GBT15, GBTL15 BRANZ
BSD-PW 500 modified with insulation and to -/120/-
PO Box 21-038 an outer sleeve. BSD-PW 400 and GBSL15, Assessment
BSD-PW 500 dampers must be screw -/60/-
Christchurch fixed to the wall studs. GBT30a, GBTL30, FAR2086

Ph. (03) 389 2231 Sola-Tube 407FD Fire Damper for GBT30b, GBTL30b,
use with the 250mm Sola-Tube for
Fax (03) 389 2245 natural light penetrations through GBTL30b, GBS30,
roof/ceiling systems.
[email protected] GBSL30a, GBSL30b,

www.ravenscroft.co.nz GBT60a, GBTL60,

GBT60b, GBS60,

GBSL60a, GBSL60b,

GBT90, GBTL90,

GBS90, GBSL90

GBT120a, GBT120b,

GBTL120, GBS120

Solatube NZ Limited Fire Damper GBUC60 CSR Gyprock
PO Box 39-146 for Sola Tube Bradford
Wellington Research
Ph (04) 568 3232 Centre Test
Fax (04) 568 2028 Certificate
0800 HOMETECH 95-13
[email protected]
www.solatube.co.nz

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

23

Downlights

Supplier Name Product Description FRR of GIB® Systems Tested/
and Address and Purpose Penetration Suitable For Assessed By

Forman Building Fire rated TBA Firefly Canopies to protect luminaries -/30/30 GBFC15, GBFC30, BRANZ
Systems Ltd downlight cover and downlighters in a timber floor/ceiling
PO Box 12-349 system lined with plasterboard up to a GBCJ30, GBSC30, Assessment
Ph. (09) 276 4000 FRR of 30 minutes. The luminaries and
Fax (09) 276 4141 downlighters must have been shown by GBUC15, GBUC30a, FAR1627
Freephone test to be suitable for use in fire rated
0800 45 4000 ceiling constructions. GBUC30b and FC1627

TBA Firefly Canopies to protect luminaries -/60/60 GBFC15, GBFC30,
and downlighters in a plasterboard ceiling GBCJ30, GBSC30,
protecting steel beams or concrete floors GBUC15, GBUC30a,
up to FRR of 60 minutes. The luminaries GBUC30b,
and downlighters must have been shown GBFC60, GBCJ60
by test to be suitable for use in fire rated
rated ceiling constructions. GBFC15, GBUC15 BRANZ
GBFC30, GBTP30, Assessment
Gartner Superlux Ltd Fire rated Gartner Superlux SD125 and SD125F SD125 GBSC30, GBUC30a, FAR1759
recessed downlight. Installed in a -/30/30 GBUC30b
PO Box 13-441 downlight plasterboard ceiling that:
a) not more than one of the downlights SD125F GBFC15, GBUC15, BRANZ
Auckland -/60/60 GBFC30, GBTP30, Assessment
is installed in each unsupported section GBSC30, GBUC30a, FAR1759
Ph. (09) 636 6092 of ceiling between the timber framing; GBUC30b, GBSC60,
and GBFC60, GBTP60,
Fax (09) 634 6802 b) the diameter of the hole in the ceiling GBUC60
lining is not more than 10mm greater
[email protected] than the diameter of the light fitting where GBFC15, GBUC15, BRANZ
it passes through the ceiling lining; and GBFC30, GBTP30, Assessment
c) any light fitting is not placed closer than GBSC30, GBUC30a, 98/1195
50mm to any timber framing within the GBUC30b, GBSC60,
floor/ceiling cavity. GBFC60, GBTP60,
GBUC60
Halcyon Lighting Ltd Fire rated R601 FR Incandescent fitting and R698 FR -/60/60
Halogen fitting installed in a plasterboard
PO Box 58-501 downlight ceiling provided that
a) not more than one of the R601 FR
East Tamaki
downlight fitting or two of the R698 FR
Auckland light fittings is installed in each
unsupported section of ceiling lining
Ph. (09) 273 9177 between the timber framing; and
b) the diameter of the hole in the ceiling
Fax (09) 273 9155 lining is not more than 5mm greater than
the diameter of the light fitting where it
0800 101 027 passes through the ceiling lining; and
c) any light fitting is not placed closer than
[email protected] 50mm to any timber framing within the
floor/ceiling cavity
www.halcyonlights.co.nz

North Island: Fire rated PBS102 and PBS103 ceiling -/60/60 GBSC60, GBFC60, BRANZ
downlight fittings GBTP60, GBUC60 Test Report
PBS Distributors Ltd downlights
FP2208
PO Box 302-202

North Shore City 1330

Ph. (09) 415 4399

Fax (09) 415 4398

[email protected]

South Island:
Progressive Building
Systems (S.I.) Ltd
PO Box 38-021
Christchurch
Ph. (03) 377 7406
Fax (03) 377 7407
[email protected]

All Areas
0800 Call PBS,
08002255 727

Note: Suppliers wishing to be listed in future revisions of this publication please contact the
Technical Manager, Winstone Wallboards Ltd, Tel 0800 100 442, Fax 0800 229 222,
[email protected]

Winstone Wallboards Ltd accepts no liability for the Proprietary System listings. It has listed these products solely on the basis of
information provided by the manufacturer at the time of publication about their suitability for installation in specific GIB® Fire Rated
systems. Winstone Wallboards has not independently verified this information and accepts no responsibility for its accuracy.

24

Notes

25

Notes

26

Notes

27




Click to View FlipBook Version