3. Project OPTIKAL ‐ Philippines Space Agency (PhilSA) With the partnership of PhilSA and the team of STAMINA4Space (Space Technology and Applications Mastery, Innovation and Advancement) Project OPTIKAL conducted a hyperspectral aerial survey in Batangas on October 24-29, 2022. Hyperspectral imaging obtains the spectrum for each pixel in an image of a scene that gathers and processes information from across the electromagnetic spectrum which collects photographs at several wavelengths that allows for the identification of the present in the scene that has a spectral signature. It can also be used to detect plant health, and vegetation classification. The survey aims to test their own developed airborne hyperspectral images from Project OPTIKAL for agricultural missions. The below images are the output of their survey. Balayan, Batangas Alitagtag, Batangas Nasugbu, Batangas


● TECHNICAL ASSISTANCE 1. RDE In‐House Review 2022 The National In-House Review which is being conducted annually by the Luzon Agricultural Research and Extension Center (LAREC) in Pampanga and La Granja Agricultural Research and Extension Center (LGAREC) in Negros Occidental. In the review, research outputs, on-going projects, and proposed studies are presented and discussed. This year’s In-House Review was hosted by LAREC held in Microtel by Wyndham Pampanga, City of San Fernando, Pampanga last November 28-29, 2022. The ABE-CE team facilitated in the preparation and consolidation of the completed papers, proposed studies, venue for function hall and accommodation of the participants, programs, certificates, and even technical assistance during the said event. During the review, The ABE-CE team assisted in registration of participants and as part of the technical committee, maintained the audio and visual PowerPoint slides during the presentation and also online viewing via zoom application for online attendees. Technical committee with Top Management Technical committee view during the presentation Zoom meeting for online attendees Registration section during In House


2. Farm‐to‐Mill Road Network Mapping The Crop Estimate Team also assisted on the Farm-to-Mill Road network mapping for the updating of the SRA-Infrastructure Masterplan. The aforementioned mapping covers all completed, on-going, proposed and even dirt roads within all the Mill Districts of Luzon, Visayas and Mindanao which are suitable for FMR projects. Pictures shown above were the sample output maps of the FMR network mapping in Davao, Ormoc, Bogo‐HISUMCO and Sagay‐Danao District.


3. Blockfarm Parcellary Map The SRA Crop Estimation Team assisted with mapping out the existing and proposed block farms in some mill districts in Luzon and Mindanao. The parcellary map has a major role in determining the boundaries and individual parcels of the sugarcane area in the district, and it is one of the requirements for block farm accreditation. Below are some of the parcellary maps in the districts.


D. Government Internship Program for Agricultural and Biosystems Engineering Youth (GIP for ABE Youth) I . Highlights of Accomplishment The Government Internship Program for Agricultural and Biosystems Engineering Youth (GIP for ABE Youth) is a collaborative Program of the Department of Agriculture (DA) and Department of Labor and Employment (DOLE) through the Bureau of Agricultural and Fisheries Engineering (BAFE). This program is in support to the Section 24 of Republic Act No. 10601 or the Agricultural and Fisheries Mechanization (AFMech) Law which mandates all the DA regional field offices, bureaus, attached agencies and corporations to strengthen the provision of agricultural and biosystems engineering services on the implementation of agri-fishery mechanization, infrastructures and engineering programs and projects. In support of the said program, the Sugar Regulatory Administration (SRA), through the ABE unit, have deployed a total of 18 ABE youth in the different offices. The internship program covers 3-6 months duration. SRA Office Batch I Batch II LAREC 3 3 LGAREC 5 6 ABE NCR 1 Total Deployed Interns 9 9 II. Best Practices The interns were engaged in various activities such as site monitoring, distribution and inventory of sugarcane farm machineries, encoding of data, area validation, mapping and other ABE related activities. III. Photo Documentation First day orientation headed by Engr. Laverne Olalia Calibration of the soil moisture meter


Familiarization of various agricultural equipment The GIPs were taught how to gather the monthly growth data of the sugarcanes by measuring the crop’s height using measuring tape; determining base internode, middle internode, and last dew lap diameter using a caliper; and counting the number of nodes. Introduction of ArcGIS, ArcMAP, and ArcCatalog to Mr. Ruzzel Rivera, Ms. Raemae Tamsi, and Mr. Jerwin Vincent Serreon (left to right) The GIP assisted on the encoding of various ABE‐ related data Getting the chlorophyll of sugarcane using SPAD KINOCA MINOLTA


The GIPs were able to observe the process of harvesting the sugarcane Different Google Earth Pro features and tools (add path, add polygon, etc.) and the application itself were explored by the GIPs and were utilized to create their first maps. The GIPs participated on the BMO for Sugarcane Production Seminar Calibration of the fertilizer applicator‐boom sprayer


GIP‐Visayas attended seminars on BMO Production and OPSI Training The GIPs assisted on the Farmers’ RSBSA Enrolment and other block farm‐related documents.


The GIPs conducted Area Validation at SRA‐LGAREC Nursery & UPLB Research and Training Center‐La Granja using handheld GPS with the supervision of Farm Surveyors of La Carlota and BISCOM MDs.


IV. Sustainability Plan of the PAP The SRA will continually support the Government Internship Program for Agricultural and Biosystems Engineering Youth (GIP for ABE Youth), which is a collaborative Program of the Department of Agriculture (DA) and Department of Labor and Employment (DOLE) through the Bureau of Agricultural and Fisheries Engineering (BAFE). Assisted in encoding the necessary information in Job Order (JO) request file, Disbursement Voucher (DV), and Purchase Order (PO).


E. OTHER ACCOMPLISHMENT ● FUEL DISCOUNT FOR FARMERS AND FISHERFOLKS The Department of Agriculture (DA) has issued Memorandum Circular No. 32, Series of 2022, or the Amendments to Memorandum CircularNo. 29, Series of 2022, On the Provision of Fuel Discount for Farmers and Fisherfolk. The said Memorandum directs all concerned offices under DA distributing farm machinery to submit a master list of recipients and corresponding machinery to the DA Regional Field Offices for subsequent submission to the Bureau of Agricultural and Fisheries Engineering (BAFE). Under MC 32 s 2022, the coverage of the fuel discount/assistance shall be expanded to include all agricultural commodities. The program will therefore cover all farm machinery with an attached engine that is being used for crop production as well as motorized banca. The Sugar Regulatory Administration already submitted a master list consisting of 3,263 sugarcane farmers nationwide to the Bureau of Agricultural and Fisheries Engineering (BAFE) in October 2022. Specific qualifications for individual farmers and/or farmer’s cooperatives and associations (FCA) are the following: ● The farmer must be registered at RSBSA and encoded in FFRS; and ● A farmer must own, operate, or rent machinery. As per BAFE, target beneficiaries will be set per region, but allocation per commodity (at the regional level) will be first come, first served, and the scheme options for implementation are fuel assistance through cards, through vouchers, or through ayuda. This provision will be greatly beneficial to farmers, especially now that fuel prices have increased. The above table shows the number of proposed beneficiaries based on the submitted data from each Mill Districts in Luzon, Visayas and Mindanao.


Geotagged photo of various farm machineries owned/rented by sugarcane farmers.


● Online Training on the Use and Operation of Agricultural and Biosystems Engineering Management Information System (ABEMIS) The Bureau of Agricultural and Fisheries Engineering (BAFE) conducted an online training on the use and operation of the Agricultural and Biosystems Engineering Management Information System (ABEMIS) on November 24-25, 2022, to strengthen the information linkage between BAFE and SRA on agricultural mechanization, irrigation, farm-to-mill roads, and other infrastructure interventions. The training was participated in by SRA ABE-CE personnel, namely Mr. Marby Gonzales, Engr. Jezelle Salayon, Engr. Casey Cagatin, and Engr. Camille Joyce Martin. It was focused on ABEMIS, which is a BAFE in-house developed web-based information system that serves as the central repository and monitoring tool of agricultural and fisheries machinery and infrastructure projects of DA from proposal, validation, procurement, construction, completion, and operation. Currently, all DA-RFOs are encoding to ABEMIS all of their agricultural engineering-related projects funded under the different banner programs, including their Budget Accountability Report. During the training, the participants were familiarized with the features, benefits, and interface of ABEMIS for proper data encoding and processing, which will support the information provided by the DA in the monitoring and reporting of the status of project implementation. Photo documentation during the online training


ANNEX A List and Status of the Approved Infrastructure Projects under GAA 2021 and 2022 GAA 2022 Project Location Municipality Cong. District Mill District Province DPWH Implementing Office Region Specifications Length (km) Project allocation REMARKS Road Type Thickness (m) 1 Sitio Divisoria to Sitio Asilang, Sampaguita, Solana, Cagayan Solana 3rd Carsumco Cagayan Cagayan 3rd DEO II Secondary Arterial 0.300 0.220 3,952,291.90 Awarded but construction has not yet started. 2 Sitio Dingading to Sitio Kurauitan, San Mariano San Mariano 2nd Isabela Isabela Isabela 3rd DEO II Secondary Arterial 0.300 0.363 6,529,873.58 On-going construction. 50% accomplished (pavement concreting) 3 San Martin, Concepcion, Tarlac Concepcion 3rd Tarlac Tarlac Tarlac 2nd DEO III Secondary Arterial 0.300 0.328 5,897,506.88 Construction completed. For final inspection. 4 Brgy. San Jose Mitla Road, Porac, Pampanga (continuation) Porac 1st Pampanga Pampanga Pampanga 2nd DEO III Secondary Arterial 0.254 0.171 3,084,506.07 Awarded. Construction not yet started due to bad weather. 5 Brgy. Malapad na Bato, Nasugbu, Batangas Nasugbu 1st Don Pedro Batangas Batangas 1st DEO IV-A Secondary Arterial 0.254 0.568 10,224,407.32 On-going construction. 15% accomplished (50


ggp(meters concreted) 6 Brgy. Magabe, Balayan, Batangas Balayan 1st Balayan Batangas Batangas 1st DEO IV-A Secondary Arterial 0.300 0.798 14,357,293.18 On-going construction. 3% accomplished (Road Clearing and widening) 7 Zone 3, Brgy. Pawili, Bula, Camarines Sur Bula 5th Pensumil Camarines Sur Camarines Sur 5th DEO V Secondary Arterial 0.254 0.146 2,620,541.37 Construction completed. For final inspection. 8 Merced Sevilleno to Merced Javellana, Pontevedra, Negros Occidental Pontevedra 4th La Carlota Negros Occidental Negros Occ. 4th DEO VI Secondary Arterial 0.254 0.700 12,600,000.00 On-going site clearing. 49% accomplished 9 So. Agho to Camandag Elementary School, Brgy. Camandag, La Castellana, Negros Occidental La Castellana 5th La Carlota Negros Occidental Negros Occ. 2nd DEO VI Main Arterial Road 0.300 0.186 3,353,761.36 Construction completed. 10 Had. Rene to Had. Margarita, Brgy. Ma-ao, Bago City Bago City 4th Ma-ao Negros Occidental Negros Occ. 4th DEO VI Main Arterial Road 0.300 0.571 10,280,572.82 On-going construction. 70% accomplished. 11 Purok Baging Hacienda Mirasol, Brgy. Caliban to Had. Paz, Brgy. Canlandog, Murcia, Negros Occidental Murcia 3rd First Farmers / Bac-mur Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial 0.254 0.979 17,613,474.79 On-going construction. 35% accomplished.


12 Crossing Luguay- Brgy. Hawaiian, Silay, Negros Occidental Silay 3rd Hpco Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial 0.300 0.208 3,748,949.35 On-going construction. 60% accomplished. 13 So. Binolwangan- So. Patag Duitay, Brgy. Guimbala-on, Silay, Negros Occidental Silay 3rd Hpco Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial 0.300 0.208 3,748,949.35 Construction completed. 14 Brgy. San Isidro - Brgy. Canlusong, E.B. Magalona, Negros Occidental E.B. Magalona 3rd Hpco Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial 0.300 0.208 3,748,949.35 On-going construction. 74% accomplished. 15 From. Hda San Jose Gaston to Hda Remedios, Victorias City, Negros Occidental Victorias City 3rd Victorias Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 1.424 25,635,768.16 On-going construction. 21 % accomplished. 605 meters of the first lane has been cemented. 16 Crossing FI to Had. Paraon, Brgy. Cabahug, Cadiz City, Negros Occidental Cadiz City 2nd Lopez Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.172 3,096,837.65 Construction completed. 17 Sitio Camungguhan Road, Brgy. Cabahug, Cadiz Cadiz City 2nd Lopez Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.172 3,096,837.65 On-going construction. 94.13% accomplished. 18 Sitio Camp Banting to Serafin Integrated Elem. School, Brgy. Tadlong, Sagay City, Sagay City 2nd Lopez Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.172 3,096,837.65 On-going construction. 36.14% accomplished.


Negros Occidental 19 Sitio Camp Banting to Purok Garganera, Brgy. Tadlong, Sagay Sagay City 2nd Lopez Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.172 3,096,837.65 On-going construction. 94.25% accomplished. 20 Brgy. Marcelo Proper to Sitio Kamao Road Section, Calatrava, Negros Occidental Calatrava 1st Sagay - Danao Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.261 4,699,449.78 Awarded but construction has not yet started. 21 Brgy. Dian-ay Proper to Sitio Mianog, Escalante City Road Section Escalante City 1st Sagay - Danao Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.261 4,699,449.78 Awarded but construction has not yet started. 22 Brgy. Maquiling Proper to Sitio Lauyan Road Section Sagay City 2nd Sagay - Danao Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.261 4,699,449.78 On-going construction. 90% accomplished. 23 Crossing Igmamatay to Sitio Igmamatay, Brgy. Codcod, San Carlos, Negros Occidental San Carlos 1st San Carlos Negros Occidental Negros Occ. 1st DEO VI Secondary Arterial Road 0.254 0.566 10,192,857.72 Has been surveyed by the DPWH on Sept. 07, 2022 24 Proper Payao to Pallacon 2 to Sitio Mangahoycahoy, Brgy. Santol, Binalbagan, Negros Occidental Binalbagan 5th Biscom Negros Occidental Negros Occ. 2nd DEO VI Secondary Arterial Road 0.254 0.289 5,203,008.42 On-going construction. 95% accomplished. 25 Brgy. Sikatuna to Brgy. Banogbanog, Isabela, Negros Occidental Isabela 5th Biscom Negros Occidental Negros Occ. 2nd DEO VI Secondary Arterial Road 0.254 0.289 5,203,008.42 On-going construction. 95% accomplished.


26 Sitio Tongo, Brgy. Cabadiangan to Brgy. Mambagaton, Himamaylan, Negros Occidental Himamaylan 5th Biscom Negros Occidental Negros Occ. 2nd DEO VI Secondary Arterial Road 0.254 0.289 5,203,008.42 On-going construction. 95% accomplished. 27 Banga Lida to Hda. Montilla, Brgy. Bagaas, Hinigaran, Negros Occidental Hinigaran 5th Biscom Negros Occidental Negros Occ. 2nd DEO VI Secondary Arterial Road 0.254 0.289 5,203,008.42 On-going construction. 55% accomplished. 28 Brgy. Guinpanaan to So. Kabayabasan, Brgy. Montilla, Moises Padilla, Negros Occidental Moises Padilla 5th Biscom Negros Occidental Negros Occ. 2nd DEO VI Secondary Arterial Road 0.254 0.289 5,203,008.42 On-going construction. 95% accomplished. 29 Brgy. Tan-awan, Kabankalan, Negros Occidental Kabankalan 6th Sonedco/ Dacongcogon Negros Occidental Negros Occ. 3rd DEO VI Secondary Arterial Road 0.300 1.248 22,468,779.47 On-going construction. 30% accomplished. 30 Brgy. Datag to Sitio Candugay, Brgy. Casalaan, Siaton, Negros Oriental Siaton 3rd Tolong Negros Oriental Negros Oriental 3rd DEO VII Main Arterial Road 0.300 0.624 11,236,537.72 Awarded. Construction has not yet started. No available source of sand and gravel. 31 Brgy. Tara to Brgy. Pantao, Mabinay Negros Oriental (continuation) Mabinay 2nd Bais- Ursumco Negros Oriental Negros Oriental 2nd DEO VII Secondary Arterial Road 0.300 0.640 11,513,198.15 On-going construction. 5% accomplished. Brgy. Sta. Agueda to NegrosSecondaryOngoing


32 So. Naga, Pamplona, Negros Oriental (continuation) Mabinay 2nd Bais- Ursumco Negros Oriental Negros Oriental 2nd DEO VII Secondary Arterial Road 0.300 0.640 11,513,198.15 On-going construction. 5% accomplished. 33 Brgy. Talongonan Road, Passi City, Iloilo (continuation) Passi City 4th Iloilo Iloilo Iloilo 2nd DEO VI Secondary Arterial Road 0.254 0.325 5,848,246.43 On-going construction. 15% accomplished. 34 Brgy. Camiros to Brgy. Balabag Road, Anilao, Iloilo (continuation) Anilao 4th Iloilo Iloilo Iloilo 2nd DEO VI Secondary Arterial Road 0.254 0.325 5,848,246.43 On-pre implementation processes. 35 Bangga Dabong, Brgy. Patong-Patong to Brgy. Dabong to Brgy. Tiringanan to Brgy. Pangilihan to Brgy. Canauili Road Janiuay, Iloilo Janiuay 3rd Iloilo Iloilo Iloilo 2nd DEO VI Secondary Arterial Road 0.254 0.325 5,848,246.43 On-pre implementation processes. 36 Brgy. Vizcaya, President Roxas, Capiz President Roxas 1st Capiz Capiz Capiz 1st DEO VI Secondary Arterial Road 0.254 0.567 10,197,772.31 On-going. Materials were already delivered and establishment of formworks already started. 37 Junction National Highway- Brgy. Tindog to Sitio Kabalyero- Medellin 4th Bogo- Medellin Cebu Cebu 1st DEO VII Secondary Arterial Road 0.254 0.286 5,155,163.35 Construction completed.


Brgy. Canhabagat via Sitio Franco Proper 38 Brgy. Donghol to Mahayag, Ormoc City, Leyte Ormoc City 4th Ormoc- Kananga Leyte Leyte 4th DEO VIII Secondary Arterial Road 0.300 0.320 5,756,599.08 On-going construction. 39 P-1 crossing Montalban to P-17 OADI, San Jose, Quezon, Bukidnon (Phase II) Quezon 3rd Bukidnon Bukidnon Bukidnon 2nd DEO X Secondary Arterial Road 0.300 1.680 30,240,000.00 On-going construction. 17% accomplished (road clearing and widening) 40 Brgy. Pinilayan to Sta. Cruz, Quezon, Bukidnon Quezon 3rd Bukidnon Bukidnon Bukidnon 2nd DEO X Secondary Arterial Road 0.300 1.228 22,112,402.24 On-going construction. 15% accomplished (road clearing and widening) 41 Brgy. Mahayahay, Hagonoy, Davao del Sur Hagonoy 1st Davao Davao del Sur Davao del Sur DEO XI Secondary Arterial Road 0.300 0.415 7,475,321.95 On-going construction. 65% accomplished. 42 Natutungan Road 12, Natutungan, Matalam, North Cotabato Matalam 2nd Cotabato North Cotabato Cotabato 1st DEO XII Secondary Arterial Road 0.300 0.601 10,825,843.04 On-going construction. 5% accomplished (road clearing and widening) TOTAL 19.785 356,130,000.00


GAA 2021 PROJECT SITE MUNICIPALITY CONG. DISTRICT PROVINCE MILL DISTRICT IMPLEMENTING DPWH DISTRICT REGION SPECIFICATIONS ROAD LENGTH BUDGET CEILING REMARKS TYPE THICKNESS (m) 1 Sitio Divisoria to Sitio Asilang, Sampaguita Solana 3rd Cagayan Carsumco Cagayan 3rd DEO II Secondary Road 0.30 0.478 7,914,705.82 Completed. For final inspection and turn- over. 2 Villabuena to Sitio Gutgutao, Santa Maria, Isabela Sta. Maria 1st Isabela Isabela Isabela 1st DEO II Secondary Road 0.30 0.323 5,400,000.00 Completed. For final inspection and turn- over. 3 District 2, Benito Soliven, Isabela Benito Soliven 2nd Isabela Isabela Isabela 2nd DEO II Secondary Road 0.03 0.24 4,063,235.22 Completed. For final inspection and turn- over. 4 Brgy. San Jose Mitla Road Porac 1st Pampanga Pampanga Pampanga 2nd DEO III Secondary Road 0.254 0.471 7,033,764.65 Completed. For final inspection and turn- over. 5 San Martin, Concepcion, Tarlac Concepcion 3rd Tarlac Tarlac Tarlac 2nd DEO III Secondary Road 0.30 0.796 13,066,473.87 Completed. For final inspection and turn- over. 6 Brgy. Talon San Luis 2nd Batangas Balayan Batangas 2nd DEO IV-A Secondary Road 0.254 0.606 9,000,000.00 Completed. For final inspection and turn- over. 7 Brgy. San Antonio San Luis 2nd Batangas Balayan Batangas 2nd DEO IV-A Secondary Road 0.254 0.762 11,268,000.00 Completed. For final inspection and turn- over.


8 Brgy. Tejero San Luis 2nd Batangas Balayan Batangas 2nd DEO IV-A Secondary Road 0.254 0.57 8,467,870.82 Completed. For final inspection and turn- over. 9 Brgy. Palincarao Tuy 1st Batangas Don Pedro Batangas 1st DEO IV-A Secondary Road 0.254 0.359 5,400,000.00 Completed. For final inspection and turn- over. 10 Brgy. San Jose to Dao to Putol, Tuy, Batangas Tuy 1st Batangas Don Pedro Batangas 1st DEO IV-A Secondary Road 0.254 1.099 16,164,132.19 Completed. For final inspection and turn- over. 11 Zone 3, Brgy. Pawili, Bula, Camarines Sur Bula 5th Camarines Sur Pensumil Camarines Sur 5th DEO V Secondary Road 0.254 0.402 6,022,058.78 Completed. For final inspection and turn- over. 12 Crossing Luguay- Brgy. Hawaiian Silay 3rd Negros Occidental HawPhil Neg. Occ. 1st DEO VI Secondary Road 0.30 0.459 7,593,529.36 Completed. For final inspection and turn- over. 13 So. Binolwangan- So. Patag Duitay. Brgy. Guimbala-on Silay 3rd Negros Occidental HawPhil Neg. Occ. 1st DEO VI Secondary Road 0.30 0.459 7,593,529.36 Completed. For final inspection and turn- over. 14 Brgy. San Isidro- Brgy. Canlusong E. B. Magalona 3rd Negros Occidental HawPhil Neg. Occ. 1st DEO VI Secondary Road 0.30 0.459 7,593,529.36 Completed. For final inspection and turn- over. 15 Sta. Teresita, brgy. Dos Hermanas to So. Hiyang - hiyang, Brgy. Katilingban, Talisay City Talisay Sity 3rd Negros Occidental BacMur/ First Farmers Neg. Occ. 1st DEO VI Main Arterial Road 0.3 0.711 11,694,264.62 Completed. For final inspection and turn- over.


16 From Brgy Sta. Rosa Proper to Sito Bahay, Sta. Rosa, Murcia Murcia 3rd Negros Occidental BacMur/ First Farmers Neg. Occ. 1st DEO VI Main Arterial Road 0.3 0.711 11,694,264.62 On-going construction. 98% accomplished. 2 percent remaining for the road shoulder completion. 17 From Bangga Lion to Purok Daisy, Brgy. San Miguel, Murcia Murcia 3rd Negros Occidental BacMur/ First Farmers Neg. Occ. 1st DEO VI Main Arterial Road 0.3 0.711 11,694,264.62 Completed. For final inspection and turn- over. 18 CPSU Campus to Sitio Bato Moises Padilla 5th Negros Occidental Biscom Negros Occ. 2nd DEO VI Main Arterial Road 0.3 0.61 10,054,177.51 Completed. For final inspection and turn- over. 19 Highway Poblacion 5, Highway to Had. Nalipay Isabela 5th Negros Occidental Biscom Negros Occ. 2nd DEO VI Secondary Road 0.254 0.805 11,880,000.00 Completed. For final inspection and turn- over. 20 Proper Payao to Pallacon II Binalbagan 5th Negros Occidental Biscom Negros Occ. 2nd DEO VI Secondary Road 0.254 0.679 10,054,177.51 Completed. For final inspection and turn- over. 21 Brgy. Patiqui to Brgy. Cambugsa Hinigaran 5th Negros Occidental Biscom Negros Occ. 2nd DEO VI Main Arterial Road 0.3 0.61 10,054,177.51 Completed. For final inspection and turn- over. 22 Crossing Sambag to Bonton, Brgy. Carabalan Himamaylan 5th Negros Occidental Biscom Negros Occ. 2nd DEO VI Secondary Road 0.254 0.679 10,054,177.51 Completed. For final inspection and turn- over. 23 Brgy. Caliling, Cauayan, Negros Occidental Cauayan 5th Negros Occidental Sonedco/ Dacongcogon Negros Occ. 3rd DEO VI Secondary Road 0.3 2.766 44,995,722.02 Completed. For final inspection and turn- over.


24 Crossing Sitio Polopongyan, Brgy. Bug-ang to Sitio Pasto, Brgy. Magticol, Toboso Road Section (cont.) Toboso 1st Negros Occidental Sagay- Danao Neg. Occ. 1st DEO VI Secondary Road 0.254 0.375 5,631,936.05 Completed. For final inspection and turn- over. 25 Stitio Aurora, Brgy. San Jose, Toboso Road Section Toboso 1st Negros Occidental Sagay- Danao Neg. Occ. 1st DEO VI Secondary Road 0.254 0.375 5,631,936.05 Completed. For final inspection and turn- over. 26 Sitio Bato Bato, Brgy. Tabun-ac to Sitio Bayombong, Brgy. Bandila, Toboso Road Section Toboso 1st Negros Occidental Sagay- Danao Neg. Occ. 1st DEO VI Secondary Road 0.254 0.375 5,631,936.05 Completed. For final inspection and turn- over. 27 Sitio Alamay Junction, to brgy. Tabun-ac Proper, Toboso Road Section Toboso 1st Negros Occidental Sagay- Danao Neg. Occ. 1st DEO VI Secondary Road 0.254 0.375 5,631,936.05 Completed. For final inspection and turn- over. 28 Brgy. Dian-ay Proper to sitio Mudrock, Escalante City Road Section Escalante City 1st Negros Occidental Sagay- Danao Neg. Occ. 1st DEO VI Secondary Road 0.254 0.375 5,631,936.05 Completed. For final inspection and turn- over. 29 Brgy. Antipolo to Had. Casal-agan Nuevo, Brgy. Antipolo Pontevedra 4th Negros Occidental La Carlota Negros Occ. 4th DEO VI Main Arterial Road 0.3 0.789 12,960,000.00 Completed. For final inspection and turn- over.


30 Antipolo Proper to Sitio Camingawan Pontevedra 4th Negros Occidental La Carlota Negros Occ. 4th DEO VI Main Arterial Road 0.3 0.467 7,740,000.00 Completed. For final inspection and turn- over. 31 Brgy. Ayungon to Sitio Abaca, La Carlota City La Carlota 4th Negros Occidental La Carlota Negros Occ. 4th DEO VI Secondary Road 0.254 0.761 11,248,381.09 Completed. For final inspection and turn- over. 32 Continuation from Brgy. Malubon proper to Brgy. Campo Himogaan Proper Sagay City 2nd Negros Occidental Lopez Negros Occ. 1st DEO VI Secondary Road 0.254 0.322 4,859,835.85 Completed. For final inspection and turn- over. 33 Bangga Martinez / Had. Ricky Road to Sitio Intaplan, Brgy. Himogaam Baybay Sagay City 2nd Negros Occidental Lopez Negros Occ. 1st DEO VI Secondary Road 0.254 0.322 4,859,835.85 Completed. For final inspection and turn- over. 34 National Highway (Severino) - Sitio Tilapas - San Vicente Brgy. Bulanon Sagay City 2nd Negros Occidental Lopez Negros Occ. 1st DEO VI Secondary Road 0.254 0.322 4,859,835.85 Completed. For final inspection and turn- over. 35 Brgy. Pob. 1 proper to Brgy. Luna Road Sagay City 2nd Negros Occidental Lopez Negros Occ. 1st DEO VI Secondary Road 0.254 0.322 4,859,835.85 Completed. For final inspection and turn- over. 36 Bangga OPTION Brgy. Pob. 2 Sagay City 2nd Negros Occidental Lopez Negros Occ. 1st DEO VI Secondary Road 0.254 0.322 4,859,835.85 Completed. For final inspection and turn- over. 37Caduhaan, Cadiz City, Had. Lagnon Road to Brgy. Purisima, Victoriascity3rdNegros VictoriasNeg. Occ. 1st VISecondary 0301605Completed. For final inspectionandturn


37 Manapla, Hda. Candelaria and Hda. Nazareth Victorias city 3rd Occidental Victorias DEO VI Road 0.30 1.605 17,427,402.22 inspection and turn- over. 38 Brgy. X, Estado main cemented road to Hda. Loreta Chang, Victorias City Victorias City 3rd Negros Occidental Victorias Neg. Occ. 1st DEO VI Secondary Road 0.30 1.605 17,427,402.22 Completed. For final inspection and turn- over. 39 Brgy. Caduhaan, Cadiz City, Had. Lagnon Road to Brgy. Purisima, Manapla, Had. Cadelaria Manapla and Cadiz City 2nd Negros Occidental Victorias Negros Occ. 1st DEO VI Secondary Road 0.30 1.065 17,427,402.22 Completed. For final inspection and turn- over. 40 Crossing Igmamatay to Sitio Igmamatay, Brgy. Codcod San Carlos City 1st Negros Occidental San Carlos Negros Occ. 1st DEO VI Secondary Road 0.254 1.426 20,929,992.20 Completed. For final inspection and turn- over. 41 Purok Kayapas to Sitio Malunggay, Brgy. Ilijian, Bago City Bago City 4th Negros Occidental Ma-ao Negros Occ. 4th DEO VI Main Arterial Road 0.3 0.625 10,293,737.35 Completed. For final inspection and turn- over. 42 Purok Ideal to Sitio Sandungao, Brgy. Bacong, Bago City Bago City 4th Negros Occidental Ma-ao Negros Occ. 4th DEO VI Main Arterial Road 0.3 0.625 10,293,737.35 Completed. For final inspection and turn- over. 43 Sitio Catmon to Sitio Pusi-on, Brgy. Maninihon Bayawan City 3rd Negros Oriental Tolong Negros Oriental 3rd DEO VII Secondary Road 0.254 1.547 22,697,999.83 Completed. For final inspection and turn- over.


44 Brgy. Tara, Mabinay, Negros Oriental - Brgy. Pantao, Mabinay, Negros Oriental Mabinay 2nd Negros Oriental Bais- Ursumco Negros Oriental 2nd DEO VII Secondary Road 0.3 1.407 22,969,852.77 Completed. For final inspection and turn- over. 45 Brgy. New Namangka Proper, Mabinay Negros Oriental - Brgy. Inapoy, Mabinay Negros Oriental Mabinay 2nd Negros Oriental Bais- Ursumco Negros Oriental 2nd DEO VII Secondary Road 0.3 1.407 22,969,852.77 Completed. For final inspection and turn- over. 46 Brgy. Rizal, CFMR Project Pontevedra 1st Capiz Capiz Capiz 1st DEO VI Secondary Road 0.254 0.966 14,237,351.36 Completed. For final inspection and turn- over. 47 Brgy. Jolongahog Road Pontevedra 1st Capiz Capiz Capiz 1st DEO VI Secondary Road 0.254 0.407 6,101,722.01 Completed. For final inspection and turn- over. 48 Brgy. Talongonan Road Passi City, Iloilo Passi City 4th Iloilo Iloilo Iloilo 2nd DEO VI Secondary Road 0.254 0.791 11,685,661.68 Completed. For final inspection and turn- over. 49 Brgy. Camiros to brgy. Balabag Road, Anilao, Iloilo Anilao 4th Iloilo Iloilo Iloilo 2nd DEO VI Secondary Road 0.254 0.791 11,685,661.68 Completed. For final inspection and turn- over. 50 Brgy. Dalid to Brgy. Carsavana to Brgy. Ipil Road, Calinog, Iloilo Calinog 3rd Iloilo Iloilo Iloilo 2nd DEO VI Secondary Road 0.254 0.791 11,685,661.68 Completed. For final inspection and turn- over. Junction National Highway- Brgy. Caputatan Norte to BogoSecondaryCompleted. Turned- overtoJuanicoV


51 Brgy. Dalingding Sur to Junction Mainline National Highway - Brgy Panugnawan Medellin 4th Cebu Bogo Medellin Cebu 1st DEO VII Secondary Road 0.254 0.709 10,495,588.16 over to Juanico V. Diaz on December 28, 2022. 52 Purok 4, Juaton to Guinowanan, Dolores Road Ormoc City 4th Leyte Ormoc- Kananga Leyte 4th DEO VII Secondary Road 0.3 0.664 10,925,735.21 Turned-over and accepted by Hon. Dorina M. Tan on November 22, 2022 53 Calao-calao, Don Carlos to Bershiba, Kitaotao Don Carlos 3rd Bukidnon Bukidnon Bukidnon 2nd DEO X Secondary Road 0.3 3.878 63,000,000.00 Completed. For final inspection and turn- over. 54 Brgy. Pigtauranan, Pangantucan Pangantucan 4th Bukidnon Bukidnon Bukidnon 3rd DEO X Secondary Road 0.3 2.535 41,252,160.99 Completed. For final inspection and turn- over. 55 Brgy. Cogon Bacaca Kiblawan 2nd Davao del Sur Davao Davao del Sur DEO XI Secondary Road 0.3 0.969 15,875,282.53 Completed. For final inspection and turn- over. 56 Brgy. Calunasan to Ugpay to Magallon M'lang 3rd North Cotabato Cotabato Cotabato 3rd DEO XII Secondary Road 0.3 1.206 19,714,499.85 Completed. For final inspection and turn- over. TOTAL 46.29 712,260,000.00 ANNEX B


Proposed Priority Infrastructure Projects for Funding under GAA 2023 Proposed Location Municipality Province Mill District DPWH Implementing Office Congressional District Region Indicative Length (km) Farm-to-Mill Road Projects 1 Sitio Malasat, Sto. Domingo to Sta. Barbara, Piat, Cagayan Piat Cagayan Carsumco Cagayan 2nd DEO 2nd II 0.232 2 Villa Ancheta to Sitio Lapak, Brgy. Old San Mariano, Isabela San Mariano Isabela Isabela Isabela 3rd DEO 2nd II 0.558 3 Brgy. San Antonio, Arayat, Pampanga Arayat Pampanga Pampanga Pampanga 1st DEO 3rd III 0.191 4 San Martin, Concepcion, Tarlac Concepcion Tarlac Tarlac Tarlac 2nd DEO 3rd III 0.442 5 Brgy. Tejero, San Luis, Batangas San Luis Batangas Balayan Batangas 2nd DEO 2nd IV-A 0.279 6 Brgy. Talon, San Luis, Batangas San Luis Batangas Balayan Batangas 2nd DEO 2nd IV-A 0.110 7 Brgy. Talon, San Luis, Batangas San Luis Batangas Balayan Batangas 2nd DEO 2nd IV-A 0.143 8 Brgy. Talon, San Luis, Batangas San Luis Batangas Balayan Batangas 2nd DEO 2nd IV-A 0.578 9 Brgy. Cumba, Lian, Batangas Lian Batangas Don Pedro Batangas 1st DEO 1st IV-A 0.790 10Zone3,Brgy.Pawili,Bula,BlCiSPilCamarinesSur5th5thV0201


10 Zone 3, Brgy. Pawili, Bula, Camarines Sur Bula Camarines Sur Pensumil Camarines Sur 5th DEO 5th V 0.201 11 Crossing Luguay- Brgy. Hawaiian, Silay, Negros Occidental Silay Negros Occidental HPCo Negros Occ. 1st DEO 3rd VI 0.434 12 So. Binolwangan-So. Patag Duitay, Brgy. Guimbala-on, Silay, Negros Occidental Silay Negros Occidental HPCo Negros Occ. 1st DEO 3rd VI 0.434 13 Brgy. Abu-abo, Murcia to Brgy. Buenavista, Murcia, Negros Occidental Murcia Negros Occidental First Farmers/ Bac-mur Negros Occ. 1st DEO 3rd VI 0.677 14 Had. De Fuego 1, Brgy. Dos Hermanas, Talisay City to Had. Bagacay, Brgy. Sto Rosario / Bagtic, Silay City Talisay City Negros Occidental First Farmers/ Bac-mur Negros Occ. 1st DEO 3rd VI 0.677 15 Sitio Tonggo to Brgy. Mambagaton, Himamaylan, Negros Occidental Himamaylan Negros Occidental Biscom Negros Occ. 2nd DEO 5th VI 1.005 16 Had. España to Brgy. Cabcab, Isabela, Negros Occidental Isabela Negros Occidental Biscom Negros Occ. 2nd DEO 5th VI 1.005 17 From Brgy. Pinggot, Ilog to Sitio Cogon, Brgy. Gatuslao, Ilog, Negros Occidental Ilog Negros Occidental Sonedco/ Dacongcogon Negros Occ. 3rd DEO 6th VI 1.000


18 From Km. 12, Brgy, Dancalan to Sitio Ga-id, Brgy. Mambugsay, Ilog Negros Occidental Ilog Negros Occidental Sonedco/ Dacongcogon Negros Occ. 3rd DEO 6th VI 0.737 19 Brgy. Dian-ay Proper to Sitio Mudrock, Escalante City Road Section (Continuation) Escalante City Negros Occidental Sagay- Danao Negros Occ. Sub DEO 1st VI 0.549 20 Bangga Gerard, Brgy. Bato, Sagay City Road Section Sagay City Negros Occidental Sagay- Danao Negros Occ. Sub DEO 2nd VI 0.549 21 Zamora to Hda. Pio, Pontevedra, Negros Occidental Pontevedra Negros Occidental La Carlota Negros Occ. 4th DEO 4th VI 0.630 22 Brgy. Cambarus Proper to Purok 6, Brgy. Cambarus, Pontevedra, Negros Occidental Pontevedra Negros Occidental La Carlota Negros Occ. 4th DEO 4th VI 0.603 23 Bangga Had. San Luis to Had. Uychiat Road Section, Brgy. Lopez Jaena, Sagay City Sagay City Negros Occidental Lopez Negros Occ. 1st DEO 2nd VI 0.483 24 Had. Maya, Sitio Camungguhan, Brgy. Cabahug, Cadiz City Road Section (Continuation) Cadiz City Negros Occidental Lopez Negros Occ. 1st DEO 2nd VI 0.483 25 Hda. Da-u to Hda. Tres Hermanos of Brgy. Luna, Cadiz City, Negros Occidental Cadiz City Negros Occidental Victorias Negros Occ. 1st DEO 2nd VI 0.987


yg26 Sitio Paho Road, Brgy. Teresa, Manapla, Negros Occidental Manapla Negros Occidental Victorias Negros Occ. 1st DEO 2nd VI 0.987 27 Crossing Igmamatay to Sitio Igmamatay, Brgy.Codcod San Carlos City Negros Occidental San Carlos Negros Occ. Sub DEO 1st VI 0.846 28 Brgy. Banate Road ,Pontevedra, Capiz (Continuation) Pontevedra Capiz Capiz Capiz 1st DEO 1st VI 0.789 29 Sitio Proper to Sitio Compound, Brgy. Jamuitan Road, Passi City, Iloilo Passi City Iloilo Iloilo Iloilo 2nd DEO 4th VI 1.357 30 Sitio Omod to Sitio Ayum, Brgy. Maninihon, Bayawan City, Negros Oriental Bayawan City Negros Oriental Tolong Negros Oriental 3rd DEO 3rd VII 0.868 31 Brgy. Bagtic, Mabinay, Negros Oriental - Sitio Mampalasan, Brgy. Bagtic, Mabinay, Negros Oriental Mabinay Negros Oriental Bais Ursumco Negros Oriental 2nd DEO 2nd VII 0.560 32 Brgy. Samac, Mabinay, Negros Oriental - Sitio Bala-on, Brgy. Samac, Mabinay, Negros Occidental Mabinay Negros Oriental Bais Ursumco Negros Oriental 2nd DEO 2nd VII 0.560 33 Brgy. Pantao, Mabinay, Negros Oriental - Sitio Cansadya, Brgy. Mabinay Negros Oriental Bais Ursumco Negros Oriental 2nd DEO 2nd VII 0.660


Pantao, Mabinay, Negros Oriental 34 Junction National Highway- Brgy. Caputatan Norte to Brgy. Dalingding Sur Junction Mainline National Highway - Brgy. Panugnawan Medellin Cebu Bogo Medellin Cebu 1st DEO 4th VI 0.338 35 Brgy. Juaton to Brgy. Catmon, Ormoc City, Leyte Ormoc City Leyte Ormoc Leyte 4th DEO 4th VIII 0.398 36 Brgy. Butong to Brgy Lumintao, Quezon, Bukidnon Quezon Bukidnon Bukidnon Bukidnon 2nd DEO 3rd XI 4.112 37 Brgy. New Cebu, Sulop, Davao del Sur Sulop Davao del Sur Davao Davao del Sur DEO 1st XI 0.566 38 Natutungan Road 12, Natutungan, Matalam, North Cotabato Matalam North Cotabato Cotabato Cotabato 1st DEO 2nd XII 0.890 TOTAL 26.71 Bridge Project Proposed Location Municipality Province Mill District DPWH Implementing Office Congressional District Region Length 1 Cabura Bridge, Sitio Cabura, Brgy. Dulao, Bago City Bago City Negros Occidental Ma-ao Negros Occ. 4th DEO 4th VI 20 meters


ANNEX C GEOTAGS OF GAA 2022 ONGOING FARM‐TO‐MILL ROAD PROJECTS as of December 31, 2022 (Based on the submission of the Mill District Offices) TARLAC Mill District ● Concreting of Sugarcane Farm-to-Mill Road (FMR), San Martin, Concepcion, Tarlac PENSUMIL Mill District ● Zone 3, Brgy. Pawili, Bula, Camarines Sur


BUKIDNON Mill District ● Concreting of Sugarcane FMR, Brgy.Pinilayan to Sta.Cruz, Quezon, Bukidnon ● Concreting of Sugarcane FMR, Purok 1, Crossing Montalban to P-17 OADI, Brgy. San Jose, Quezon, Bukidnon DAVAO Mill District ● Concreting of Sugarcane FMR, Brgy. Mahayahay, Hagonoy, Davao del Sur


COTABATO Mill District ● Construction of Sugarcane FMR, Natutungan Road 12 (Phase II) BISCOM Mill District ● Concreting of Sugarcane FMR, Proper Payao to Pallacon II to Sitio Mangahoycahoy, Brgy. Santol, Binalagan, Neg. Occ.


● Concreting of Sugarcane FMR, Brgy. Guinpanaan to So. Kabayabasan, Brgy. Brgy. Montilla, Moises Padilla, Negros Occidental ● Concreting of Sugarcane FMR, Brgy. Sikatuna to Banogbanog, Isabela, Neg. Occ. ● Concreting of Sugarcane Farm to Mill Road, So. Tongo, Brgy. Cabadiangan to Mambagaton, Himamaylan, Negros Occidental


● Concreting of Sugarcane Farm to Mill Road, Bangga Lida to Had Montilla, Brgy. Bagaas, Hinigaran, Neg. Occidental MA‐AO Mill District ● Concreting of Sugarcane Farm to Mill Road, Had. Rene to Had.Margarita, Brgy. Ma-ao, Bago City BAIS URSUMCO Mill District ● Concreting of Sugarcane Farm to Mill Road, Brgy. Tara, Mabinay, Negros Oriental - Brgy. Pantao, Mabinay, Negros Oriental


ANNEX D CARSUMCO MILL DISTRICT


ISABELA MILL DISTRICT


TARLAC MILL DISTRICT


PAMPANGA MILL DISTRICT


DON PEDRO MILL DISTRICT


BALAYAN MILL DISTRICT


PENSUMIL MILL DISTRICT


BUKIDNON MILL DISTRICT


DAVAO MILL DISTRICT


ANNEX E CARSUMCO MILL DISTRICT Mr. Jaymark Bibbigan Google Earth (Lines, Points, Polygons) QGis (Farm Machinery Location Map) Graph (Weekly Raw Sugar Production ) ArcMap ‐ Slope Map ArcMap ‐ Elevation Map ` ArcMap ‐ Soil Erosion Map


Click to View FlipBook Version