2018 Water Master Plan

2018 Water Master Plan

APPENDIX B

2017 ARKANSAS DEPARTMENT OF HEALTH
CT ANALYSIS REPORT

Arkansas Department of Health

4815 West Markham Street ● Little Rock, Arkansas 72205-3867 ● Telephone (501) 661-2000
Governor Asa Hutchison

Nathaniel Smith, MD, MPH, Director and State Health Officer

Engineering Section, Slot 37 Ph 501-661-2623 Fax 501-661-2032
www.Healthy.Arkansas.gov/eng/
After Hours Emergency (800) 554-5738

CERTIFIED

October 9, 2017

Mr. Matt Mitchell
Hot Springs Waterworks
798 Adams
Hot Springs, AR 71901

RE: Hot Springs Waterworks, PWS #209
Lakeside Plant
Calculated/Tracer CT Analysis Report
Required Inactivation: 0.5 log cyst/2.5 log virus
Revised CT Compliance

Dear Mr. Mitchell:

The CT letter for Hot Springs Waterworks – Lakeside Plant has been revised to include the
LT2ESWTR microbial toolbox option of reduced turbidity that your system selected for Bin 2
compliance.

Based on current conditions, CT compliance can be achieved in the filters and both
clearwells. Both clearwells are assigned a baffle factor of 0.4 for calculation of the T10 time
based on a 6.5 minimum water level. This compliance is based on the following:

1. A maximum flow rate of 6.0 MGD (4167 gpm) with an approved T10 time of 20.5
minutes in the filters, 19.8 minutes in the large clearwell and 13.6 minutes in the
small clearwell.

2. The following information must be used for daily calculations for CT compliance
and reported with the monthly operation report form:

A. The daily maximum flow rates through the filters and clearwells.
B. The minimum daily water level in the clearwells.
C. The minimum daily chlorine residuals.
D. The minimum daily temperatures.

Mr. Matt Mitchell
October 9, 2017
Page 2

E. The maximum daily pHs.

3. The maximum flow rates must be measured and recorded daily at raw water line
and the effluent from the clearwell.

4. The water quality parameters in item 2 must be monitored daily at the following
locations.

a. Effluent from the filters prior to post chlorination.
b. Effluent from the large clearwell prior to post lime addition.
c. Effluent from the small clearwell.

The CT compliance is based on the specific chlorination points at the filter influent and large
clearwell influent and pH adjustment point at the influent to the small clearwell. Therefore,
no deletion or relocation of a chlorination point or pH adjustment point for CT compliance is
to be completed without first notifying this office in writing and receiving confirmation of the
proposal.

If the above conditions cannot be met, the water system must reanalyze its CT compliance
as soon as possible. If necessary, contact this office for assistance. The water system must
begin immediately to monitor the above plant parameters to ensure SWTR compliance is
being achieved. Measures should also be taken to ensure that the LT2ESWTR individual filter
and combined finished turbidity requirement of 0.15 NTU in 95% of samples can also be met.

Past operation reports have indicated that the finished water pH has been above 9.0 units
on a regular basis. The CT tables in the SWTR do not allow for CT inactivation credit under this
condition. Therefore, no CT credit will be allowed for the small clearwell or other treatment
units when the pH is above 9.0 units.

This letter should remain a permanent part of the water system’s compliance file for the SWTR
until notified or superseded in writing by this office.

If you have any questions concerning the CT analysis or subsequent steps to take for
compliance, feel free to contact this office. Please call Lance Jones or myself at 661-2623.

Sincerely,

Aaron Hilborn, P.E. SWTR:VDW:PWS#209:09272016
Engineering Supervisor
Engineering Section

LAJ:AH:DT:SY:CR:VDW:vdw

CERTIFIED

April 9, 2010

Mr. Don Cochran, Manager
Hot Springs Waterworks
798 Adams
Hot Springs, AR 71901

RE: Hot Springs Waterworks- Ouachita Plant, PWS #209
Calculated/Tracer CT Analysis Report
Required Inactivation: 0.5 log cyst/2.5 log virus
Daily CT Compliance

Dear Mr. Cochran:

The CT criteria for Hot Springs – Ouachita Plant have been revised due to the water
treatment plant expansion and modifications. Based on these modifications, CT compliance
is to be achieved in the remaining clearwell. The clearwell is assigned a baffle factor of 0.65
for calculation of the T10 time based on the lowest water level each day. CT compliance as
outlined in the Surface Water Treatment Rule (SWTR) can be achieved based on the
adjustment of the chlorine residuals to provide adequate CT levels to maintain compliance
with changing pH levels, temperatures, flow rates and clearwell depths.

1. The following conditions must be maintained at all times

A. The flow rates shall not exceed the maximum of 15,507 gpm through the
clearwell.

B. The pH must not exceed the maximum 9.0 units.

2. The following information must be used for daily calculations for CT compliance
and reported with the monthly operation report form:

A. The daily maximum flow rate through the clearwell.
B. The minimum daily water level in the clearwell.
C. The minimum daily chlorine residual.
D. The minimum daily temperature.
E. The maximum daily pH.

3. The water quality parameters in item 1 must be monitored daily at the effluent
from the clearwell during the maximum flow rate prior to any post chlorination.

Mr. Don Cochran
April 9, 2010
Page 2

4. To determine the T10 in minutes for the new clearwell, use the following
formula:

T10 = (18,131 ft2)(min. clearwell depth)(0.65BF)(7.48 gal/ft3)
(max. flow rate)

The CT compliance is based on the specific chlorination points as outlined below:

*****Filter effluent

Therefore, no deletion or relocation of a chlorination point for CT compliance is to be
completed without first notifying this office in writing and receiving confirmation of the
proposal.

If the above conditions cannot be met, the water system must reanalyze its CT compliance
as soon as possible. If necessary, contact this office for assistance. The water system must
begin immediately to monitor the above plant parameters to ensure SWTR/IESWTR
compliance is being achieved. Measures should also be taken to ensure that the IESWTR
turbidity requirement of 0.3 NTU in 95% of samples can also be met.

This letter should remain a permanent part of the water system’s compliance file for the SWTR
until notified or superseded in writing by this office.

If you have any questions concerning the CT analysis or subsequent steps to take for
compliance, feel free to contact this office. Please call Vickie Welytok or myself at 661-2623.

Sincerely,

Lyle Godfrey, P.E. CT:VDW:209:040920010
Engineering Supervisor
Division of Engineering

RH:LG:LD:DT:KJP:VDW:vdw

APPENDIX C

2018 ARKANSAS DEPARTMENT OF HEALTH
WATER TREATMENT PLANT CAPACITY









CITY OF HOT SPRINGS
Lakeside Water Treatment Plant - Filter Evaluation

Filter Backwash Cycle 23
Filter Run Time Between Backwash Cycle (hours): 1

Time Offline for Backwash Cycle (hours):

Filter Length Width Area Filtration Production
No. (ft) (ft) (ft2) Rate (gpm)

345 (gpm/ft2)
345
1 15 23 345 1.4 483
2 15 23 345 1.4 483
3 15 23 345 1.4 483
4 15 23 345 1.4 483
5 15 23 2070 1.4 483
6 15 23 1.4 483
Total
2,898

24-Hour Avg. Daily Avg. Available Firm Filter
n Production Time Offline Daily Time in Production
for Backwash Service (hours) (gallons)
(gallons)
(minutes)
(no backwash)

3 695,520 60 23.0 666,540

3 695,520 60 23.0 666,540

3 695,520 60 23.0 666,540

3 695,520 60 23.0 666,540

3 695,520 60 23.0 666,540

3 695,520 60 23.0 666,540

8 4,173,120 3,999,240

1/25/2018

CITY OF HOT SPRINGS
Ouachita Water Treatment Plant - Filter Evaluation

Filter Backwash Cycle 35
Filter Run Time Between Backwash Cycle (hours): 1

Time Offline for Backwash Cycle (hours):

Filter Length Width Area Filtration Production
No. (ft) (ft) (ft2) Rate (gpm)

374 (gpm/ft2)
374
1 22 17 374 3.9 1,459
2 22 17 374 3.9 1,459
3 22 17 374 3.9 1,459
4 22 17 374 3.9 1,459
5 22 17 535.5 3.9 1,459
6 22 17 535.5 3.9 1,459
7 31.5 17 535.5 3.9 2,088
8 31.5 17 3851 3.9 2,088
9 31.5 17 3.9 2,088
Total
15,017

24-Hour Avg. Daily Avg. Available Firm Filter
n Production Time Offline Daily Time in Production
for Backwash Service (hours) (gallons)
(gallons)
(minutes)
(no backwash)

9 2,100,384 40 23.3 2,042,040

9 2,100,384 40 23.3 2,042,040

9 2,100,384 40 23.3 2,042,040

9 2,100,384 40 23.3 2,042,040

9 2,100,384 40 23.3 2,042,040

9 2,100,384 40 23.3 2,042,040

8 3,007,368 40 23.3 2,923,830

8 3,007,368 40 23.3 2,923,830

8 3,007,368 40 23.3 2,923,830

7 21,624,408 21,023,730

1/25/2018

EXHIBIT I

WATER DISTRIBUTION SYSTEM MAP

Ouachita WTP

Q3""

&. .&

Doubloon PRV Gold Nugget PRV Lakeside WTP
Upstream = 150 psi Upstream = 147 psi
Setting = 125 psi Setting = 108 psi Q3Bethel Lake

Crystal Hill PRV Holly Street Tank !
Upstream = 132 psi 2,000,000 Gallons
Setting = Royal 1 Tank Controls O.F. = 876'
Open: when tank is below 75'
Closed: when tank is above 96.5'

&.

Mountain Pine Street Pump Station
Pine North (Emergency Use Only)
Pressure Zone F.F. = 671'

Mountain Pine North PRV "
Upstream = 127 psi .&
Setting = 125 psi

Woodmere/Whittington Tank !
250,000 Gallons
O.F. = 868.5'

ALBERT PIKE .&
&.
Cooper Lane (Twins)
Music Mountain Tank 6,000,000 Gallons
(2,000,000 Gallons) O.F. = 869 ft
And Pump Station
Mountain Pine South PRV O.F. = 710 ft !! SUMMER
Setting = 120 psi
"!

EBMOLNK

AIRPORT HIGDON FERRY Hollywood FCV/PRV
Open 127' Closed 133'
Highway 70 Tank Setting = 100 psi
500,000 Gallons
O.F. = 687 ft &.

! Keuka PRV
Setting = 60 psi

DR MARTIN LUTHER KING JR

^

CENTRAL

8/7/2017 P:\2015 PROJECTS\1560 - HOT SPRINGS MASTER PLAN\GIS\HOT_SPRINGS_WATER_DISTRIBUTION_MAP(48X36).MXD HOT_SPRINGS WATER.MXD ^ Lake Hamilton
AR 7
Amity Road Tank HWY 290
Out of Service JACK MOUNTAIN
O.F. = 714 ft

Central

0 3,000 6,000 9,000 12,000 AR 128
Hwy 7
Feet

Belvedere Pressure Zone PIPE DIAMETER (Inches)
O.F.= 980'
2 10 20
PARK Country 4 12 24
Club 6 14 30
Lake 8 16

Belvedere Tank

! 300,000 Gallons
O.F. = 980'

" Twins Pressure Zone
O.F. = 869'
^
DeSoto Pump Station
Park Avenue Tank F.F. = 597'
Out of Service

GRAND

GRAND

GRAND

GRAND ON RAMP MLK MLK EXWY
MALVERN GRAND
Twins Pressure Zone
Pleasant Valley PRV O.F. = 869'
Setting = 70 psi
Ouachita Pressure Zone
Lowery PRV &. O.F. = 687' - 710'
Setting = 48 psi
^
.&

MLK

.& HOLLYWOOD !

Hollywood Avenue Tank
1,000,000 Gallons
O.F. = 705 ft

.& AR 171

i GOLF LINKS Industrial Park Pressure Zone
O.F. = 537'

Industrial Park PRV Industrial Park Tank AR 270
Setting = 61 psi 250,000 Gallons
O.F. = 537 ft
&.
!^
AR 51

CARPENTER DAM Lake
Catherine
HWY 290
AR 171
HWY 171
CITY OF HOT SPRINGS
Garland County WATER DISTRIBUTION SYSTEM
Hot Spring County
EXHIBIT I
Ouachita Pressure Zone
O.F. = 687' - 710' CRIST ENGINEERS, INC.
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS

AUGUST 2017

EXHIBIT II

WATER DISTIBUTION SYSTEM
IMPROVEMENT MAP

TIEMILL SEARS LOOP KELLY HOLLOW
FISHER LOOP WILDCAT
MOUNTAIN PINE BROKEN TREE
HUDDLESTON SPRINGS RABBIT CREEK
Ouachita WTP

"" BRAZIL

GOLD NUGGETDOUBLOON JOHN HOLT BLOWOUT MOUNTAIN

?TREASURE ISLE CLEARCREEK W F GODWIN BEAR CAT HOLLOW SNAKEHEAD
?
Gold Nugget PRV CEDARGLADE Lakeside WTP
Doubloon PRV Upstream = 147 psi
Upstream = 150 psi Setting = 108 psi VALLEY ACRES Bethel Lake
Setting = 125 psi
"
MOUNTAIN PINE MEEKS
PINELAND
PRIVATE Crystal Hill PRV WILDCAT Holly Street Tank «¬13
Upstream = 132 psi 2,000,000 Gallons
Setting = RoyEaLlK1HOTRaNnk Controls TURKEY TROT O.F. = 876' !.
Open: when tank is below 75'
Closed: when tank is above 96.5' CEDARGLADE SHORT LEAF CEDARGLADES

?
CRYSTAL HILL VO-TECHHUGHES
PINEY
RAITHWOOD GLADE «¬
CRYSTAL HILL BLACKSNAKE
BLACKSNAKE CANTERBURY
LORADO MID AMERICA
LILLARD ¬«5Pine Street Booster CEDAR PARK

TREASURE ISLE Lakeside Pressure Zone Pump Station
O.F. = 869' - 876'
«¬9F.F. = 671'
«¬28 /"
BLACKSNAKE WALNUT ?

«¬23 Mountain Pine North PRV BLACKSNAKE WHITTINGTON
! Upstream = 127 psi
Setting = 125 psi
JETSON BUXTON WEST MOUNTAIN
MOUNTAIN PINE WEST MOUNTAIN
ALBERT PIKE WoodWmHeITrTeIN/WGTOhNittington Tank SUMMIT CENTRAL
250,000 Gallons
¬«12 «¬5 ALBERT PIKE O.F. = 868.5'

WINKLER ALBERT PIKE Cooper Lane (Twins) !.
6,000,000 Gallons
O.F. = 869 ft GRAND
FLEETWOOD ? FAIRWOOD BAYOU «¬18Music Mountain Tank PROQSUPAEPACWTOUACHITA ORANGE
? ¬«14 «¬31 ¬«32(2,000,000 Gallons) GRAND

LODGE KIRSCHWOOD WESTPINE BULL And Pump Station M
MOUNTAIN O.F. = 710 ft
MONOPOLY ¬«11 Mountain Pine South PRV SUMMER Lowery
Setting = 120 psi LINWOOD Recom
ARROWHEAD DAKOTA WARD Setting
THORNTON FERRY
GARLAND
RECTOR
HOBSON
MUSIC ¬«15 «¬7 «¬16«¬1 ¬«3¬«30«¬29 «¬16EBMOLNK
HOBSON
THORNTON FERRY "!. ALBERT PIKE
WOOOVDESRTOVICEKW
WEST MOUNTAIN VIEW «¬4 «¬14 «¬10SAINTLOUIS GREENWOOD

LEONARDLOCPKRHAIVVAETNE¬«15 «¬13MOLLY SPRINGS
LAKESHORELAZY «¬4 «¬27STOVER
MAIN
LONGHORN WESTON SUMMER Hollywood FCV/PRV
DR MARTIN LUTHER KING JR
7TH
3RD
CENTRAL
FREIDA Open 127' Closed 1

HOUSTON ALPINE Setting = 100 psi

AIRPORT WOODLAWN

SPRINGWOOD ¬«10 RICHARD ?
PANAMA
WINDAMERE WOODALL KIMERY EMORY Keu
HIGDON FERRY Rem
CREEK MAJESTIC LODGE «¬4 with
LAKE
LAKE FOREST SHORES ROCK HARBOR AIRPORT AVIATION MCLEOD COLUMBIA HILLS
CRESTVIEW
MOORE
LAKESHORE
MOORE DR MARTIN LUTHER KING JR WERNER
PITTMAN
Highway 70 Tank MARION TELEVISION H
ROGERS 500,000 Gallons PAK
KAUFMANProposed O.F. = 710ft
ANDERSON STONEGATE SHORES ¬«26
SUNSET BAY«¬2¬«1!2!.«¬11AIRPORTMORPHEW ¬«2 (!«¬1
MOORE

¬«11 HIGDON FERRY FILES BUENA VISTA
CENTRAL
PRIVATE TWIN POINTS FIV
AIRPORT BURCHWOOD BAY
WILDWOOD FOREST

MARION ANDERSON CENTRAL
LAKE HAMILTON
LAKELAND

CHARMING HEIGHTS WALKWAY LITTLE JOHN

«¬9 WALNUT HILL NORTHSHORE OSPREY
GERONIMO WATERVIEW
TANGLEWOOD
RANCHESTER HOUSLEY

MARIONDEAENRDVEIREWSON JOY LITTLE MAZARN LONG ISLAND
OLD BRUNDAGE LOOKOUT
PITTMAN
RANDALL
CENTRAL
AMITY Lake Hamilton
MOORE ECHO VALLEY

12/11/2017 P:\2015 PROJECTS\1560 - HOT SPRINGS MASTER PLAN\GIS\HOT_SPRINGS_WATER_DISTRIBUTION_IMPROVEMENT_MAP(48X36).MXD HOT_SPRINGS WATER.MXD KIGHT PRIVATE LONG BEACH BEACHVIEW
MOORE LAWLER
OMOUNTAIN MEADOW VALLEY RIDGE CAROLINE ACRES
ALBRIGHT MOUNT CARMEL
AMITY
RUSH FORK AMITY ALBRIGHT HWY 290 FISH HATCHERY

GOBERT

Amity Road Tank MOUNT RIANTE HWY 290

Out of Service

O.F. = 714 ft

AMITY PRIVATE

HIDDEN VALLEY HWY 290

CENTRAL LEE WARREN MEADOWLARK

JACK MOUNTAIN

Nature Central PROPOSED LOCATION
OF NEW WATER TREATMENT PLANT
0 3,000 6,000 9,000 12,000 Central AS IDENTIFIED IN THE WATER SUPPLY STUDY

Hwy 7 AR 128

Feet AR 7

QUARRY MOUNTAIN QUARRY VALLEY SCOTT KING TEN MILE

SLEEPY VALLEY ROCKPILE TEN MILE

Belvedere Pressure Zone PARK LOG HOUSE SILICA PIT PIPESILICAMINE DIAMETER (Inches)
O.F.= 980' FOREST

FOX PASS MILL CREEK 2 10 20 CEDAR CREEK

BELVEDERE CEDAR CREEK 4 12 24

Country SLEEPY VALLEY MARYJANE OHANA
Club Lake

¬«17.! Belvedere Tank 6 TH1R4ESHER 30
8 16 36
300,000 Gallons SHORTHORN
PARK O.F. = 980' DENISE SHORTTHORN
SLEEPY VALLEY NORTHLAKE
STONEBRIDGE MOST HIGH PRIVATE SANGSTER
LYNNETTE
PULLMAN MOUNTAIN VALLEY ¬«8 " DeSoto Pump Station NOVASTONE IMMANUEL HARRIET W22464 RED = IMMEDIATE IMPROVEMENTS
CEDAR CREEK SHADE TREE BLUE = 10 YEAR IMPROVEMENTS
F.F. = 597' HOLY SPIRIT
MILL CREEK PURPLE = 20 YEAR IMPROVEMENTS

«¬3 RAMBLE Park Avenue Tank GORGE MILL CREEK HIGHER GROUND GRAND SPRING
Out of Service
JERICHO JAVA
NORTH MOUNTAIN TEMPLE

HOT SPRINGS MOUNTAIN «¬5 HALK WHITE SULPHUR PROMISE LAND JAVA
GRAND GRAND
GRAND S FRONTAGE

GRAND

MILLCREEK

OLD CHURCHSPRINGCYPRESS¬«6MCCLENDONKELTON¬«7BRUMLEYTURPEN BRATTON
GRAND S FRONTAGECONVENTIONILLINOIS MCCLENDON CEDAR CREEK EAGLE ROCK
SPRING
PMLEALAVSEARNNT SILVER WADE GRAND MCCLENDON GRAND HEARTPINE

CYPRESSVALE RIDGEWAY GRAND ON RAMP MLK MLK EXWY GRAND SPRING

¬«4 E GRAND

MAURICE CRESCENT Pleasant Valley PRV SPRING «¬4
RecomCmHeATnTdAeNOdODGAownstream
Setting = 58 psi SPRING WESTINGHOUSE SPRING

y PRV GAINES BALD MOUNTAIN Twins Pressure Zone
mmended Downstream O.F. = 869'
g = 43 psi ? CONES ¬«13

BELDING RIDGEWAY

¬«25? «¬4
«¬14
«¬6 «¬12 BELLAIRE «¬15 WHISPERING HILLS QUAIL RIDGE BALD MOUNTAIN

MLK Ouachita Pressure Zone
O.F. = 687' - 710'
?HOLLYWOOD «¬!.8 RAVENWOOD
SHADY GROVE LEIGH «¬8 QUAIL CREEK
V Hollywood Avenue Tank
133' 1,000,000 Gallons LAKESIDE
O.F. = 705 ft WESTINGHOUSE

COUNTRY CLUB LAKESIDE PRIVATE STRATCOR

? AR 171

uka PRV MALVERN CEDARWOOD FAIRPLAY Industrial Park Pressure Zone
moved from service GOLF LINKS O.F. = 537'
h P.Z. Expansion ¬«2 !¬«22
SHADY GROVE «¬21 WILDWOOD MALVERN ¬«10 SCENIC
¬«3
PINE MEADOWS SKYLINE ESSEX PARK
HILL DR MARTIN CATHERINE HEIGHTS PRIVATE SITnRdAuTCsOtrRial Park PRV
KIS LUTHER Setting = 61 psi
KING JR
MALVERN
DR MARTIN LUTHER KING JR BRODRICK MALVERN MALVERN
?
SHADMYAPHLEEILGEAHFTS Industrial Park Tank AR 270
EXTRUSIO2ON5.F0.,0=0503G7aftllons AR 51
Lake
GRAND POINT SHADY HILLS Catherine ¬«16!.!«¬1

HUMPHREYS WILSONS LAKE COUCHWOOD

VE POINTS DAVIDSON SHADY GROVE HIDEAWAY HILLS GREEN BAY

LAKEPARK COOLWOOD AKERS
CARPENTER DAM
BAYSHORE HAYMEADOW
PENINSULA
POWERHOUSE PRIVATE HERITAGE COBBLE HILL DIAMONDHEAD
PRIVATE TALL HICKORY
ARKRIDGE SHARON SHADY GROVE PLUM HOLLOW Independence Independence
Plum Hollow Catherine Park
LONGVIEW CARPENTER DAM WAIKIKI INDEPENDENCE Lake Catherine State Park
Arlington
RESTFUL RIDGE RED RIDGE PEBBLE BEACH

«¬24 GRANDSTAFF POSSUM RUN Catherine Park
!
RED OAK CARPENTER DAM CATHERINE PARK HOLLY HILL
TWIN OAKS PRIVATE RAZORBACK

HWY 290 OHIO

FARR SHORES FARRS LANDING «¬9 RED OAK HWY 290

WARWICK ERNIES COOPER CREEK HWY 171

IATILE APPLEGATE

AR 171 AR 171

HWY 290

WESTBRANCH

PROPOSED ROUTE OF FINISHED WATER LINE CITY OF HOT SPRINGS
FROM NEW AMITY ROAD WTP AS IDENTIFIED WATER DISTRIBUTION SYSTEM
IN THE WATER SUPPLY STUDY
IMPROVEMENT MAP
Garland County EXHIBIT II

Hot Spring County

Ouachita Pressure Zone
O.F. = 687' - 710'

CRIST ENGINEERS, INC.
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS

DECEMBER 2017