PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
WALNUT
CONNECT TO 6"
ON LINDEN PARK LANE
CONNECT TO 6"
ON LINDEN ST.
LINDEN
«¬25
6-INCH WATER LINE LINDEN PARK
LOOP
MYRTLE
SABIE RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
WHITTINGTON
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #25
TAIN 6" LINDEN PARK LOOP JASPER
CITY OF HOT SPRINGS, ARWEST CRORAINSOKTE ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 55 110 220 330 440
CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
Feet User Community
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 1 IMPROVEMENT #25 - LINDEN PARK LOOP - LINDEN ST TO LINDEN PARK LANE
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 740
3 Ashpalt Resurfacing EA 2 $30 $22,200
LF 315 $12,400
$75 $23,625
Construction Cost Estimate $58,000
30% Contingency $17,400
$11,600
20% Engineering, Legal, Environmental, Admin. $87,000
TOTAL COST ESTIMATE
PIPE DIAMETERS
2 Inch 10 Inch 18 Inch
4 Inch 12 Inch 20 Inch
24 Inch
BEARD 6 Inch 14 Inch 30 Inch
ANNA 8 Inch 16 Inch
BAXTER
ALBERT PIKE SOUTH
AFTON CONNECT TO 12"
ON SUMMER
CONNECT TO 6"
ON AFTON ST.
PATTERSON «¬GREENWOOD CENTERVIEW
26 SUMMER
CONNECT TO 6" 6-INCH WATER LINE
ON GREENWOOD LOOP ALONG GREENWOOD
«¬27 IRA
6-INCH WATER LINE CONNECT TO 6" FRANCIS
LOOP ON IRA STREET
PINEWOOD PLAIN
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROHVEELMENENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT 26 & 27
6" GAP ON GREENWOOD & 6" PATTERSON ST. & IRA ST. LOOP
BESS
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 1 IMPROVEMENT #26 - GREENWOOD LOOP - AFTON ST TO SUMMER ST
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 870
3 Ashpalt Resurfacing EA 2 $30 $26,100
4 Concrete surface repair LF 870 $12,400
LF 240
5 Miscellaneous & Incidential LS $75 $65,250
$55 $13,200
$5,000
Construction Cost Estimate $122,000
30% Contingency $36,600
$24,400
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $183,000
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 1 IMPROVEMENT #27 - PATTERSON ST TO IRA ST LOOP - ALONG PATTERSON ST AND IRA ST.
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 690
3 Ashpalt Resurfacing EA 2 $30 $20,700
4 Concrete surface repair LF 350 $12,400
LF 340
5 Miscellaneous & Incidental LS $75 $26,250
$55 $18,700
$5,000
Construction Cost Estimate $83,000
30% Contingency $24,900
$16,600
20% Engineering, Legal, Environmental, Admin. $125,000
TOTAL COST ESTIMATE
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
GRAND
CONNECT TO 6"
ON WESTOVER
WESTOVER
MCCAFFERTY ¬«28
6-INCH WATER LINE
LOOP ALONG PEARL ST.
WOOD PEARL
CONNECT TO 20" WATER MAIN
ON WOOD STREET
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #28
6" PEARL STREET LOOP
CITY OF HOT SPRINGS, AR CRISNTOLEES NGINEERS, INC.
WATER SYSTEM MASTER PLAN
Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 55 110 220 330 440
CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
Feet User Community
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 1 IMPROVEMENT #28 - PEARL ST LOOP - WESTOVER TO WOOD STREET
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 500
3 Ashpalt Resurfacing EA 2 $30 $15,000
4 Miscellaneous & Incidential LF 500 $12,400
LS
$75 $37,500
$5,000
Construction Cost Estimate $70,000
30% Contingency $21,000
$14,000
20% Engineering, Legal, Environmental, Admin. $105,000
TOTAL COST ESTIMATE
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
CONNECT TO 6"
ON FAWN STREET
«¬29 FAWN
6-INCH WATER LINE
LOOP ALONG SHELBY ST.
CONNECT TO 6" SHELBY
ON LACEY ST. ETTER
LAWSON
CONNECT TO 6"
ON GRAND AVE.
«¬29
GRAND
6-INCH WATER LINE CONNECT TO 6"
LOOP ALONG GRAND AVE. ON BEARD STREET
WESTOVER
LACEY GARLAND PATTERSON
THORNTON
00009
BEARD
00012
RECTOR
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT# 29
6" GRAND AVENUE & SHELBY STREET LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
HOBCSSONoEuNrSc/eA:irEbCsuOrsiN, DSDUSigL,TitUIaNlSGGDlEoANb,GeUI,NSGEGEeRoSJSUE, NAyeEe,,rEoL2GI0aT1rRTt8hLIDsEt,aRIrGOGCNeK,o,agAnrRadKpthhAieNcsSG,AISS
0 55 110 220 330 440 User Community
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 1 IMPROVEMENT #29 - GRAND AVE LOOP & SHELBY ST LOOP - LACEY ST TO BEARD ST AND
GRAND AVE TO ETTER ST.
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 1,204
3 Ashpalt Resurfacing EA 4 $30 $36,120
4 Miscellaneous & Incidental LF 1,204 $24,800
LS
$75 $90,300
$5,000
Construction Cost Estimate $156,000
30% Contingency $46,800
$31,200
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $234,000
MID TERM
IMPROVEMENTS
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
PURCHASE PROPERTY EXISTING
ADJACENT TO HWY. 70 TANK HIGHWAY 70 WEST
FOR FUTURE TANK SITE 500,000 GALLON ELEVATED
WATER STORAGE TANK
¬«1
AIRPORT
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #1
PURCHASE PROPERTY ADJACENT TO HWY. 70 TANK
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
PIPE DIAMETERS
2 Inch 10 Inch 18 Inch
20 Inch
BRADY 4 Inch 12 Inch 24 Inch
M6OIUnNchTAIN 14 Inch 30 Inch
16 Inch
8 Inch
LOVIA RAINWATER
KETCHUM
ROYAL PUMP STATION CLEO
«¬2
"/ALBERT PIKE
INSTALL FLOW METER
MEADOW
CREEK
WILLIAMSON
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #2
ROYAL PUMP STATION IMPROVEMENTS
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 115 230 460 690 920
CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
Feet User Community
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #2 - ROYAL BOOSTER PUMP STATION IMPROVEMENTS
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matt D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity Unit Cost Total Cost
1 Trench & Excavation Safety Systems $1,000
2 Prefab Flow Meter Vault $40,000
3 Yard Piping
4 Asphalt Repairs $5,000
5 Electrical $5,000
6 Telemetry $7,500
$20,000
Contractor Bonds, Mobilization, Overhead, Markup (15%) $12,000
TOTAL CONSTRUCTION COST $91,000
CONTINGENCY (30%) $27,300
ENGINEERING (20%) $18,000
TOTAL COST ESTIMATE $136,000
PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
HYACINTH
CONNECT TO 24" 12-INCH PARALELL
WATER TRANSMISSION MAIN WATER LINE
¬«3HOBSON
CONNECT TO 8"
SOUTH OF HOBSON
MISSION
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #3
12" MISSION STREET LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 10 20 40 60 80
Feet JUNE, 2018
1 inch = 50 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #3 - MISSION STREET PARALELL LINE - CROSSING HOBSON AVE AT MISSION ST
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 12-inch DIP Water Line Unit Cost Total Cost
LF 35
2 8-inch Connection EA 1 $50 $1,750
3 24-inch Connection EA 1 $6,100
3 Ashpalt Street Surface Repair LF 35
4 Miscellaneoue & Incidental Work LS $14,430
$75 $2,625
$5,000
Construction Cost Estimate $30,000
30% Contingency $9,000
20% Engineering, Legal, Environmental, Admin. $6,000
$45,000
TOTAL COST ESTIMATE
PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
PROPOSED 2,500,000 GALLON EXISTING
ELEVATED WATER STORAGE TANK HIGHWAY 70 WEST
O.F. = 710 FT MSL 50,000 GALLON ELEVATED
WATER STORAGE TANK
(REMOVE FROM SERVICE)
«¬4 .!
AIRPORT
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #4
2.5 MILLION GAL. ELEVATED WATER STORAGE TANK HWY. 70
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 115 230 460 690 920
JUNE, 2018
Feet
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #4 - 2,500,000 GALLON WATER STORAGE TANK - ADJ. HWY 70 TANK
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 2,500,000G Elevated Water Storage Tank LS 1 $3,500,000
2 Tank Mixing System LS 1 $80,000
3 Yard Piping LS 1 $225,000
4 Site Work LS 1
5 Logo LS 1 $40,000
7 Miscellaneous & Incidental LS 1 $60,000
8 Telemetry LS 1
9 Electrical LS 1 $5,000
10 Chain Link Fencing LS 1 $40,000
$15,000
$20,000
Construction Cost $3,985,000
10% Contingency $398,500
20% Engineering, Legal, Enviromental, Admin. $797,000
TOTAL COST ESTIMATE $5,180,000
CONNECT TO 20" GRAND
TWINS TANK FILL LINE
CONNECT TO 20"
WOOD WATER TRANSMISSION LINE
GARLAND
«¬5
CONNECT TO 12"
ON SUMMER STREET
AIRPORT
ALBERT PIKE SUMMER
PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
GRAND
20-INCH WATER MAIN CENTRAL
ALONG WOOD STREET
AND GARLAND AVENUE
CONNECT TO 12"
ON CENTRAL AVENUE
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #5
20" PARALLEL LINE ON WOOD STEEET & GARLAND AVENUE
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 170 340 680 1,020 1,360
Feet
Source: Esri, DigitalGlobe, Ge1oinEcyhe,=E7a5r0thfsetaetr Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, JUNE, 2018 GIS User Community
IGN, and the
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #5 - WOOD STREET/GARLAND AVE PARALLEL WATER MAIN - MASON ST TO
CENTRAL AVENUE
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 20-inch DIP Water Line $140 $1,190,000
LF 8,500
2 20-inch Connection EA 2 $75 $36,940
3 12-inch Connection EA 2 $55 $14,800
4 8-inch Connection EA 2 $4,500 $12,200
5 Ashpalt Resurfacing LF 8,500 $637,500
6 Concrete Resurfacing LF 100
7 Fire Hydrant Assembly EA 1 $5,500
$4,500
Construction Cost Estimate $1,901,000
30% Contingency $570,300
$380,200
20% Engineering, Legal, Environmental, Admin.
$2,852,000
TOTAL COST ESTIMATE
WOODRIDGE PIPE DIAMETERS
IDLEWOOD
2 Inch 10 Inch 18 Inch
ROBINWOOD 4 Inch 12 Inch 20 Inch
24 Inch
CYPRESSVALE 6 Inch 14 Inch 30 Inch
TIRELLI 8 Inch 16 Inch
DRIFTWOOD KERRY
BRIARWOOD
GOSSETT HUDGINS
CONES
HIGHLAND PARK 8-INCH WATER LINE LOOP DAVID GIBBS EDDIEMEE
OMA
CONNECT TO 6" BOAZ CASTLETON
ON RIDGEWAY STREET MARK DOTTIE
SHERRI
KAYLA PLEASANT VALLEY ¬«6
RIDGEWAY
PAULINE
CONNECT TO 6" CONNECT TO 8"
ON APACHE ST. ON PAULINE ST.
SEMINOLE COMANCHE
APACHE
MALVERN FOX RUN
AUTUMNRIDGE MOHAWK
SHAWNEE DINO
RED = NEAR TERM IMPROVEMENTS
BLUE = 10 YEAR IMPROVEMENTS
PURPLE = 20 YEAR IMPROVEMENTS
SAWTODOTIHSOTARK IBUTION8"SYMSATINEMONIMRPIRDOGVEEWMAEYNSTTSR-EIEMTPROVEMENT #6
RIDGE
«¬7 CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC. FAIROAKS
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 115 230 460 690 920
Feet MELWOOD JUNE, 2018
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #6 - RIDGEWAY STREET LOOP - HIGHLAND PARK ST TO PLEASANT VALLEY ST
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 8-inch PVC Water Line Unit Cost Total Cost
LF 2,300
2 8-inch Connection EA 1 $30 $69,000
3 6-inch Connection EA 2 $6,100
4 Ashpalt Street Surface Repair LF 80
5 Route Clearing LF 1,784 $12,200
6 Miscellaneous & Incidental Work LS $75 $6,000
7 Fire Hydrant Assembly EA 1
$8 $14,272
$10,000
$4,500
Construction Cost Estimate $122,000
30% Contingency $36,600
$24,400
20% Engineering, Legal, Environmental, Admin.
$183,000
TOTAL COST ESTIMATE
PIPE DIAMETERSEDDY 18 Inch
2 Inch 10 Inch 20 Inch
BLUFF 4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
HOLLY
AGATE GLADE MAGNOLIA
BREEZE
CONNECT TO 16" PARK
ON CEDAR STREET
CONNECT TO 12"
«¬7 AMBER ON GLADE STREET
12-INCCHREWST ATER MAIN
ALONG AMBER STREET
CARLTON
CEDAR
PINE ARBOR
WAHOO
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #7
WALNUT 12" MAIN ON AMBER STREET
CITY OF HOT SPRINGS, ARWHITTI
WATER SYSTEM MASTER PLAN CRIST ENGINEERS, INC.
0 115 230 460 690 920 Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
Feet CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
User Community
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #7 - AMBER STREET LOOP - CEDAR STREET TO PARK AVENUE
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 12-inch PVC Water Line Unit Cost Total Cost
LF 2,100
2 16-inch Connection EA 1 $50 $105,000
3 12-inch Connection EA 1 $14,880
4 Ashpalt Street Surface Repair LF 1,500 $7,400
5 Route Clearing LF 600
6 Miscellaneous & Incidental Work LS $75 $112,500
7 Fire Hydrant Assembly EA 1 $8 $4,800
$10,000
$4,500
Construction Cost Estimate $259,000
30% Contingency $77,700
$51,800
20% Engineering, Legal, Environmental, Admin.
$389,000
TOTAL COST ESTIMATE
PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
CONNECT TO 8" SHADY GROVE
ON KAY STREET
¬«8
8-INCH WATER MAIN
CONNECT TO 8"
ON SHADY GROVE ROAD
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #8
8" KAY STREET LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
«¬2WATER SYSTEM MASTER PLAN CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440 JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #8 - KAY STREET LOOP - KAY STREET TO SHADY GROVE ROAD
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 8-inch PVC Water Line $30 $27,000
LF 900
2 8-inch Connection EA 2 $65 $12,200
3 8-inch Slick Bore (Hot Springs Creek) LF 150 $75 $9,750
4 Ashpalt Resurfacing LF 485 $55
5 Concrete Resurfacing LF 25 $36,375
6 Gravel Resurfacing LF 225 $8 $1,375
7 Fire Hydrant Assembly EA 1 $4,500 $1,800
8 Miscellaneous & Incidental LS $4,500
$5,000
Construction Cost Estimate $98,000
30% Contingency $29,400
$19,600
20% Engineering, Legal, Environmental, Admin.
$147,000
TOTAL COST ESTIMATE
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
RECTOR HEIGHTS
6-INCH WATER LINE
ALONG RECTOR HEIGHTS DR
AND MEADOW STREET
CONNECT TO 6" «¬9
CONNECT TO 8"
ON ALBERT PIKE RD
ALBERT PIKE
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #9
6" MAIN ON RECTOR HEIGHTS DRIVE
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #9 - RECTOR HEIGHTS LOOP - ALBERT PIKE RD TO MEADOW ST @ PATRICIA ST
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
LF 1,620
2 6-inch Connection $30 $48,600
3 Ashpalt Resurfacing EA 3
4 8-inch slick bore LF 1,620 $18,600
5 Miscellaneous & Incidental Work LF 120 $75 $121,500
6 Fire Hydrant Assembly LS $65 $7,800
EA 1
$5,000
$4,500
Construction Cost Estimate $206,000
30% Contingency $61,800
20% Engineering, Legal, Environmental, Admin. $41,200
$309,000
TOTAL COST ESTIMATE
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
WHISPERING
HILLS CONNECT TO 6"
WATER LINE ON
RAVENWOOD PLACE
AND
WHISPERING HILLS
TAYLOR 8" WATER MAIN
ALONG QUAIL CREEK
«¬10 RAVENWOOD
QUAIL CREEK HIGH MEADOW
CONNECT TO 6"
WATER LINE
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #10
8" QUAIL CREEK PARALLEL LINE
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #10 - QUAIL CREEK PARALLEL LINE - SOUTH OF TAYLOR TO RAVENWOOD
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 8-inch PVC Water Line Unit Cost Total Cost
LF 1,000
2 8-inch Connection EA 2 $30 $30,000
3 8-inch Slick Bore LF 65 $12,200
4 Ashpalt Street Surfacing Repair LF 1,000
5 Concrete Surface Repair LF 60 $65 $4,225
6 Miscellaneous & Incidental Work LS $75 $75,000
$55 $3,300
$10,000
Construction Cost Estimate $135,000
30% Contingency $40,500
$27,000
20% Engineering, Legal, Environmental, Admin.
$203,000
TOTAL COST ESTIMATE
PRIVATE POGUE RESTFUL PIPE DIAMETERS PRIVATE 18 Inch
Lake Hamilton ARKRIDGE 2 Inch 10 Inch CARPENTER DAM20 Inch
RESTFUL RIDGE 4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
ALVIN MOORE TWIN OAKS
RED OAKELGIN CONNECT TO 8"
Lake ON RED OAK DR.
Hamilton
ARKOTA SHORES «¬11
FARRS LANDING
CONNECT TO 8" 8-INCH WATER LINE
WATER LINE ON ALONG RED OAK DR.
FARR LANDING RD HWY 290RICKY TOO
PRIVATE
ERNIES
WARWICK
290
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #11
8" RED OAK LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 230 460 920 1,380 1,840 JUNE, 2018
Feet
1 inch = 1,000 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #11 - RED OAK DRIVE LOOP - FARRS LANDING ROAD TO TWIN OAKS ROAD
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 8-inch PVC Water Line Unit Cost Total Cost
LF 2,650
2 8-inch Connection EA 2 $30 $79,500
4 Ashpalt Street Surface Repair LF 1,000 $12,200
5 Gravel Resurfacing LF 60
6 Route Clearing LF 1,000 $75 $75,000
7 Miscellaneous & Incidental Work LS $25 $1,500
8 Fire Hydrant Assembly EA 1
$8 $8,000
$10,000
$4,500
Construction Cost Estimate $191,000
30% Contingency $57,300
$38,200
20% Engineering, Legal, Environmental, Admin.
$287,000
TOTAL COST ESTIMATE
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS 18 Inch
BLUE = MIDTERM IMPROVEMENTS 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
PURPLE = LONG TERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
ALBERT PIKE
EXISTING OAK GROVE «¬.! 12 OAKGROVE
700,000 GALLON STANDPIPE
ASSUMED O.F. = 705 FT REPAINT AND INSTALL
TANK MIXING SYSTEM
FORESTRIDGE
OAKGROVE
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #12
OAK GROVE TANK IMPROVEMENTS
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 462.5 925 1,850 2,775 3,700 CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
User Community
Feet
1 inch = 2,000 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #12 - OAK GROVE TANK IMPROVEMENTS
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 Insurance, Bonds, Mob., Demobilization LS 1 $13,250
2 Tank Mixing System LS 1 $54,000
3 Interior Coating Repair LS 1 $125,000
4 Exterior Coating Repair LS 1 $200,000
5 Repairs & Improvements LS 1
6 Disinfection LS 1 $8,900
7 Miscellaneous & Incidental LS 1 $5,000
$5,000
Construction Cost $411,000
30% Contingency $123,300
20% Engineering, Legal, Enviromental, Admin.
$82,200
TOTAL COST ESTIMATE
$620,000
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS
BLUE = MIDTERM IMPROVEMENTS
2 Inch 10 Inch 18 Inch
PURPLE = LONG TERM IMPROVEMENTS 4 Inch 12 Inch 20 Inch
24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
CRYSTAL SPRINGS
OWL CREEK
ALBERT PIKE
EXISTING CRYSTAL SPRINGS
400,000 GALLON STANDPIPE
ASSUMED O.F. = 1,007 FT
INSTALL TANK MIXING SYSTEM
AND MODIFY OVERFLOW PIPING
.! CYSTAL SPRINGS
«¬13
RAGWEED VALLEY
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #13
CRYSTAL SPRINGS TANK IMPROVEMENTS
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 345 690 1,380 2,070 2,760 CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
User Community
Feet
1 inch = 1,500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #13 - CRYSTAL SPRINGS TANK IMPROVEMENTS
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 Insurance, Bonds, Mob., Demobilization LS 1 $15,000
2 Tank Mixing System LS 1 $54,000
3 Interior Coating Repair LS 1 $100,000
4 Exterior Coating Repair LS 1 $150,000
5 Repairs & Improvements LS 1
6 Disinfection LS 1 $20,000
7 Miscellaneous & Incidental LS 1 $4,000
$5,000
Construction Cost $348,000
30% Contingency $104,400
20% Engineering, Legal, Enviromental, Admin.
$69,600
TOTAL COST ESTIMATE
$520,000
RED = NEAR TERM IMPROVEMENTS PIPE DIAMETERS
BLUE = MIDTERM IMPROVEMENTS
2 Inch 10 Inch 18 Inch
PURPLE = LONG TERM IMPROVEMENTS 20 Inch
QUAPAW OUACHITA684HIIIAnnnWcccThhhHORNE 12OIRnAcNhGE OAK24 Inch
PROSPECT 14 Inch 30 Inch
FAWN 16 Inch
GRAND PECAN HAZEL WOODBINE
99011
WARD GRAND CENTRAL MAURICE
HAGEN SANFORD
GARLANDSUMMER
7TH RECTOR 2ND 00011
6TH SCHOOL CHARTEROAK
5TH
4TH
HOBSON LINWOOD
00010
CSOONUNTHECT TO 12"
ON 7TH STREET
PATTERSON CONNECT TO 12" BELDING
CENTERVIEW ON CENTRAL AVENUE MORRISON
GREENWOOD POND OAKCLIFF
ALCORN
«¬14
WINONA
MANOR
CENTRAL
VIRGINIA
SAINT LOUIS 12-INCH WATER MAIN LASER
ALONG GREENWOOD AVENUE
TRIVISTA LEFT
MEADOWBROOK TRIVISTA RIGHT
3RD
SONNET TALISMAN
LEACH LEVIN
PATRIOT CRESTWOOD RY ENTRAL
SUMMER OAKWOOD
HENDERSON
7TH
CLARK BELL
OAKLAWN
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #14
12" GREENWOOD WATER MAIN SELLERS
CITY OF HOT SPRINGS, AR HIGDO
CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN VINEYARD
Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 230 460 920 1,380 1,840
CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
Feet User Community
1 inch = 1,000LEfeOeNt ARD
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #14 - GREENWOOD WATER MAIN - 7TH STREET TO CENTRAL AVENUE
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
ESTIMATED
Item No. Description Unit Total Unit Cost Total Cost
Quantity
1 12-inch DIP Water Line $50 $156,500
LF 3,130
3 12-inch Connection EA 2 $75 $14,800
4 8-inch Connection EA 2 $55 $12,200
5 Ashpalt Resurfacing LF 3,130 $4,500 $234,750
6 Concrete Resurfacing LF 100
7 Fire Hydrant Assembly EA 1 $5,500
8 Miscellaneous & Incidental LS $4,500
$5,000
Construction Cost Estimate $433,000
30% Contingency $129,900
20% Engineering, Legal, Environmental, Admin. $86,600
TOTAL COST ESTIMATE $650,000
ADCOCK PIPE DIAMETERS 18 Inch
CESSNA 2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
DOUGLAS
BRADFORD
TIMBS HUNTERSCOVE
CONNECT TO 12"
WATER LINE
8-INCH PARALLEL WATER LINE
ALONG MARION ANDERSON &
MORPHEW RD.
MARION MORPHEW
ANDERSON
«¬15
FOREST CONNECT TO 8" COPPER MOUNTAIN
WATER LINE ON
HUNTERSCOVE DRIVE
PATHWAY
CONNECT TO 6" RED = NEAR TERM IMPROVEMENTS
WATER LINE ON BLUE = MIDTERM IMPROVEMENTS
WALKWAY DR
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #15
BLEDSOE
8" MARION ANDERSON PARALLEL LINE
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 115 230 460 690 920
JUNE, 2018
Feet
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #15 - MARION ANDERSON PARALLEL LINE - WALKWAY DRIVE TO STONEGATE SHORES
OWNER: CITY OF HOT SPRINGS ESTIMATE BY: Matthew D. Dunn, P.E.
DATE: June 8, 2018
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 8-inch PVC Water Line Unit Cost Total Cost
LF 1,400
2 6-inch PVC Water Line LF 2,000 $30 $42,000
3 12-inch Connection EA 1 $30 $60,000
4 6-inch Connection EA 2
5 8" Slick Bore LF 120 $7,400
6 6" Slick Bore LF 120 $12,200
7 Asphalt Street Surface Repair LF 500 $65 $7,800
8 Concrete Surface Repair LF 120 $40 $4,800
LS $75 $37,500
9 Miscellaneous & Incidental Work $55 $6,600
$5,000
Construction Cost Estimate $183,000
30% Contingency $54,900
$36,600
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $275,000
PRIVATE PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
RED = NEAR TERM IMPROVEMENTS 4 Inch 12 Inch 24 Inch
BLUE = MIDTERM IMPROVEMENTS 6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
PURPLE = LONG TERM IMPROVEMENTS
SONGER
CONNECT TO 6"
WATER LINE
8-INCH PARALLEL WATER LINE
ALONG AIRPORT ROAD
«¬AIRPORT 16
OLD AIRPORT
PINKERTON ALDRIDGE UNNAMEDCONNECT TO 12"
WATER MAIN
MARTINGALE
LHAM
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #16
6" AIRPORT ROAD LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
Source: ECsOriN, SDUigLTitIaNlGGlEoNbGeI,NGEEeRoSEye, ELIaTrTthLsEtaRrOGCeKo,gArRaKphAiNcsS,AS
0 115 230 460 690 920
CNES/Airbus DS, USDA, USGSJU, NAEe,ro2G01R8ID, IGN, and the GIS
Feet User Community
1 inch = 500 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #16 - AIRPORT RD LOOP - OLD AIRPORT ROAD TO ALDRIDGE
OWNER: CITY OF HOT SPRINGS WATER UTILITIES
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 8-inch PVC Water Line Unit Cost Total Cost
LF 1,800
2 12-inch Connection EA 1 $30 $54,000
3 6-inch Connection EA 1 $7,400
4 Ashpalt Street Surface Repair LF 210 $6,200
5 Gravel Resurfacing LF 200
6 Miscellaneous & Incidental Work LS $75 $15,750
$25 $5,000
$5,000
Construction Cost Estimate $93,000
30% Contingency $27,900
$18,600
20% Engineering, Legal, Environmental, Admin.
$140,000
TOTAL COST ESTIMATE
PLAIN PIPE DIAMETERS
2 Inch 10 Inch 18 Inch
4 Inch 12 Inch 20 Inch
24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
PINEWOOD
CHITWOOD CONNECT TO 6" PATTERSON
ON SAINT LOUIS ST.
CENTERVIEW
SAINT LOUIS
6-INCH WATER LINE
LOOP ALONG PINEWOOD
& LEEPER STREET
MAIN
«¬17
CONNECT TO 6"
ON PATTERSON ST.
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #17
ORCHARD 6" PINEWOOD LEEPER LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #17 - PINEWOOD / LEEPER LOOP - SAINT LOUIS TO PATTERSON
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 826
3 Ashpalt Resurfacing EA 2 $30 $24,780
4 Miscellaneous & Incidental LF 826 $12,400
LS
$75 $61,950
$5,000
Construction Cost Estimate $104,000
30% Contingency $31,200
$20,800
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $156,000
PIPE DIAMETERS 18 Inch
2 Inch 10 Inch 20 Inch
4 Inch 12 Inch 24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
MASON
COOPER
MCCLARD
AIRPORT ALBERT PIKE TREVA
BABER
6-INCH WATER LINE CONNECT TO 6"
LOOP ALONG WYNN ST.
¬«18
CONNECT TO 6"
SAINT LOUIS
FREEMANCHESS
BRENDA
WYNN
DEXTER
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #18
6" WALYONNZON STREET LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
JUNE, 2018
Feet
1 inch = 250 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #18 - WYNN STREET LOOP - GAP ON WYNN STREET
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 100
3 Ashpalt Resurfacing EA 2 $30 $3,000
4 Miscellaneous & Incidental LF 100 $12,400
LS
$75 $7,500
$5,000
Construction Cost Estimate $28,000
30% Contingency $8,400
$5,600
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $42,000
PIPE DIAMETERS
ALBERT PIKE 2 Inch 10 Inch 18 Inch
4 Inch 12 Inch 20 Inch
24 Inch
6 Inch 14 Inch 30 Inch
8 Inch 16 Inch
DICKSON
CONNECT TO 6" MISSION
CASH 6-INCH WATER LINE
LONGTREE LOOP ALONG HAMMOND DR.
«¬19 HAMMOND
DORIS
CONNECT TO 6"
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #19
6" HAMMOND DRIVELOOP
AIRP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN
CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 55 110 220 330 440
Feet
1 inch = 250 feet JUNE, 2018
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #19 - HAMMOND LOOP - 6" LINE TO 6" LINE ON HAMMOND ST
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 2,000
3 Ashpalt Resurfacing EA 2 $30 $60,000
4 Miscellaneous & Incidental LF 2,000 $12,400
$75 $150,000
$5,000
Construction Cost Estimate $227,000
30% Contingency $68,100
$45,400
20% Engineering, Legal, Environmental, Admin.
TOTAL COST ESTIMATE $341,000
OAKCLIFF PIPE DIAMETERS
2 Inch 10 Inch
4 Inch 12 Inch 18 Inch
6 Inch 14 Inch 20 Inch
8 Inch 16 Inch 24 Inch
30 Inch
ALCORN
MILLER
CARSON
CONNECT TO 6" 6-INCH WATER LINE
LOOP ALONG WINONA ST.
¬«20WINONA
CONNECT TO 8"
RED = NEAR TERM IMPROVEMENTS
BLUE = MIDTERM IMPROVEMENTS
PURPLE = LONG TERM IMPROVEMENTS
DISTRIBUTION SYSTEM IMPROVEMENTS - IMPROVEMENT #20
6" WINONA STREET LOOP
CITY OF HOT SPRINGS, AR CRIST ENGINEERS, INC.
WATER SYSTEM MASTER PLAN CONSULTING ENGINEERS LITTLE ROCK, ARKANSAS
0 20 40 80 120 160 JUNE, 2018
Feet
1 inch = 100 feet
CRIST ENGINEERS, INC.
JOB ESTIMATE COST SUMMARY
PROJECT: PH 2 IMPROVEMENT #20 - WINONA LOOP - CARSON STREET TO MILLER STREET
OWNER: CITY OF HOT SPRINGS
DATE: June 8, 2018 ESTIMATE BY: Matthew D. Dunn, P.E.
JOB NO: 1560
Item No. Description Unit Total ESTIMATED
Quantity
1 6-inch PVC Water Line Unit Cost Total Cost
2 6-inch Connection LF 350
3 Ashpalt Resurfacing EA 2 $30 $10,500
4 Miscellaneous & Incidental LF 350 $12,400
LS
$75 $26,250
$5,000
Construction Cost Estimate $54,000
30% Contingency $16,200
$10,800
20% Engineering, Legal, Environmental, Admin. $81,000
TOTAL COST ESTIMATE