PORTFOLIO
samad ibrahim
+971 52 812 77 00
SAMAD IBRAHIM
BIM MODELER | ARCHITECTURE &
STRUCTURE DRAUGHTSMAN
/in/samad-ibrahim
Mob: +971 52 812 77 00
Email : [email protected]
ARCHITECTURAL DRAWINGS
A BC D EF G
13100 GROUND FLOOR PLAN
2150 1750 2650 2650 1750 2150
W3 W4 W2 W4 PROJECT : TWIN VILLA
77
D1
BATH BATH
W3 42.63 SF 32.94 SF W5
4140 BEDROOM-2 BEDROOM-1 D2 MAID ROOM 4140
158.49 SF 149.75 SF 101.78 SF
D2 BATH
D1 D1
29.06 SF
D2
66
D2
3800 W2 BEDROOM-3 LIVING ROOM MD
161.57 SF 306.52 SF VERANDA
67.79 SF
3800
5 D1 5
4150 DINING KITCHEN D2 4150
136.01 SF 131.85 SF BATH
VERANDA SD SD MASTER BEDROOM W2
46.50 SF
72.66 SF 225.23 SF
MD
2418044 24180
3900 DINING KITCHEN BATH MASTER BEDROOM W2 3900
129.07 SF 126.84 SF 46.48 SF 239.31 SF
D2
3 D2 3
4050 LIVING ROOM D1 W2 4050
317.44 SF BEDROOM-3
142.43 SF
22
D2 BATH D1 D1
D2
29.06 SF
BATH
4140 MAID ROOM BEDROOM-1 BEDROOM-2 4140
42.62 SF
101.78 SF BATH D2 148.43 SF 157.20 SF
W5 32.94 SF W3
1 D1 1
W4 W2 W4 W3
2150 1750 2650 2650 1750 2150
13100
A BC D EF G
PORTFOLIO - SAMAD IBRAHIM
A BC D EF G
ROOF PLAN 13100
PROJECT : TWIN VILLA
2150 1750 2650 2650 1750 2150
7 4140 5.83° 9.40° 4140 7
6 SLOPE SLOPE 6
5 5
4 3800 3800 4
3 3
2 4150 4150 2
1 1
24180 24180
3900 3900
4050 4050
4140 9.40° 5.83° 4140
S LOP E S LOP E
2150 1750 2650 2650 1750 2150
13100
A BC D EF G
PORTFOLIO - SAMAD IBRAHIM
BEDROOM-2 BATH BEDROOM-1 BATH GROUND FLOOR COLOR
MAID ROOM SCHEME LEGEND
BATH PROJECT : TWIN VILLA
BEDROOM-3VERANDA LIVING ROOM Room Legend
VERANDA
DINING KITCHEN BATH MASTER BEDROOM BATH
BEDROOM-1
DINING KITCHEN BATH MASTER BEDROOM BEDROOM-2
BEDROOM-3
DINING
KITCHEN
LIVING ROOM
MAID ROOM
MASTER BEDROOM
VERANDA
LIVING ROOM BEDROOM-3
BATH
MAID ROOM BEDROOM-1 BEDROOM-2
BATH
BATH
PORTFOLIO - SAMAD IBRAHIM
GROUND FLOOR 3D PLAN
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
GROUND FLOOR 3D VIEW
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
EAST ELEVATION
PROJECT : TWIN VILLA
1 2 3 4 56 7
24180
4140 4050 3900 4150 3800 4140
1200 PARAPET
5400
ROOF
4200
5400
3600
600 GROUND FLOOR
600
F.G.L.
0
PORTFOLIO - SAMAD IBRAHIM
SOUTH ELEVATION
PROJECT : TWIN VILLA
A BC D EF G
13100
2150 1750 2650 2650 1750 2150
1200 PARAPET
5400
ROOF
4200
5400
3600
600 GROUND FLOOR
600
F.G.L.
0
PORTFOLIO - SAMAD IBRAHIM
WEST ELEVATION
PROJECT : TWIN VILLA
7 65 43 2 1
24180
4140 3800 4150 3900 4050 4140
1200 PARAPET
5400
ROOF
4200
5400
3600
600 GROUND FLOOR
600
F.G.L.
0
PORTFOLIO - SAMAD IBRAHIM
NORTH ELEVATION
PROJECT : TWIN VILLA
G FE D CB A
13100
2150 1750 2650 2650 1750 2150
1200 PARAPET
5400
ROOF
4200
5400
3600
600 GROUND FLOOR
600
F.G.L.
0
PORTFOLIO - SAMAD IBRAHIM
SECTION VIEW
PROJECT : TWIN VILLA
76 3800 5 4150 4 3900 3 4050 2 4140 1
4140 False Ceiling As Speci ed 100 3950 200 False Ceiling As Speci ed 100 3950 100 False Ceiling As Speci ed 250
3800
250 2640 100 1200 100 3800 3940
W4 LIVING ROOM
BATH
200 2600 KITCHEN KITCHEN LIVING ROOM BEDROOM 1 W2
D2
Floor Tiles As Speci ed Floor Tiles As Speci ed
GROUND FLOOR
600
Well Compacted Soil
200mm Thick Floor Slab
PORTFOLIO - SAMAD IBRAHIM
DOORS & WINDOWS Door Tag Door Type Elevation View Plan View Window Tag Window Type Elevation View Plan View
SCHEDULE
PROJECT : TWIN VILLA 1800 Triple 2400
W2 casement
SD Exterior double 2100 2100
sliding door window
1500 2000
MD Exterior double 2100 W3 Double sliding 2100
hinged door window
1000 600
750
W4 Single hung 1500 600
window
D1 Exterior / 2100
Interior single
hinged door
W5 Single awning
window
800
D2 Interior single 2100
hinged door
DOOR SCHEDULE WINDOW SCHEDULE
DOOR TYPE HEIGHT WIDTH ROUGH HEIGHT ROUGH WIDTH COUNT WINDOW TYPE HEIGHT WIDTH ROUGH HEIGHT ROUGH WIDTH COUNT
D1 2100 1000 2125 1050 8 W2 2100 2400 2115 2415 6
D2 2100 800 2125 850 10 W3 2100 2000 2115 2015 4
MD 2100 1500 2125 1550 2 W4 600 600 615 615 4
SD 2100 2800 2 W5 1500 750 1515 765 2
PORTFOLIO - SAMAD IBRAHIM 22 16
G rand total: 22 G rand total: 16
NORTH & WEST
SKETCH ELEVATIONS
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
SOUTH & EAST
SKETCH ELEVATIONS
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
STRUCTURAL DRAWINGS
A BC D EF G
13100
2150 1750 2650 2650 1750 2150 FOUNDATION LAYOUT
PROJECT : TWIN VILLA
7 F2 7
F2 2100 X 2100
2100 X 21004140 F3 4140
-600 S.S.L. 1400 X 1400
6 6
F2 F1 F2
2100 X 2100 2400 X 2400 2100 X 2100
3800 -550 S.S.L. 3800 Str. Column As Per SHD. Column Stirrups
Short Span Steel As Per SHD. Column Reinforcement
Bituminous Paint
55 Long Span Steel As Per SHD.
50
F2 F1 F2 Depth As Per Schedule
2100 X 2100 2400 X 2400 2100 X 2100
4150 4150 50
2418044 24180
F2 F1 F2
2100 X 2100 2400 X 2400 2100 X 2100
3900 3900 Width As Per Schedule
2200
33
F2 F1 F2 100mm Thick Blinding
2100 X 2100 2400 X 2400 2100 X 2100 1000 Gauge Polythene Sheet
Earth Fill
4050 4050
TYP. SECTION OF COLUMN AND FOOTING
22
F2
F1 F2
2100 X 2100
2400 X 2400 2100 X 2100
4140 -650 S.S.L. 4140
1 F2 1
F2 2100 X 2100
2100 X 2100
F3
1400 X 1400
2150 1750 2650 2650 1750 2150
13100
A BC D EF G PORTFOLIO - SAMAD IBRAHIM
A BC D EF G
COLUMN AXIS LAYOUT 13100
PROJECT : TWIN VILLA
2150 1750 2650 2650 1750 2150
PORTFOLIO - SAMAD IBRAHIM
C1 C1 C1 200 400 400 200 200 200 200
77
400 400
4140 4140
2003800400 400 200 200 500 400 3800 6
5
6 C2 C1
C1 500 400
200 C2 C1
5
C1
4150 4150
40024180200 200 500 200 200 400 24180 4
3
4 3900 C2 C1 3900 2
C14050 500 200 4050
400 200 C2 200 C1
3 500 200
C1 C2 C1
400
2 C1
4140 4140
400 400200 200 200 400 1
1 C1
C1 C1
2150 1750 2650 2650 1750 2150
13100
A BC D EF G
GRAPHICAL COLUMN SCHEDULE
PROJECT : TWIN VILLA
R oof R oof
4200 4200
T op of Foundation C1 C1 C1 C1 C1 C1 C1 C1 C2 C2 C2 T op of Foundation
-600 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 500 200X 500 200X 500 -600
Column Locations
-650 -600 -600 -600 -600 -600 -600 -600 -550 -550 -550
R oof
4200 A-1 A-2 A-3 A-4 A-5 A-6 B-7 C-1 D-2 D-3 D-4
T op of Foundation R oof
-600 4200
Column Locations
C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 T op of Foundation
200X 500 200X 500 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 -600
-550 -550 -600 -600 -600 -600 -600 -600 -600 -650
D-5 D-6 E-7 F-1 G-2 G-3 G-4 G-5 G-6 G-7
PORTFOLIO - SAMAD IBRAHIM
A BC D EF G
GROUND FLOOR 13100
TIE BEAM LAYOUT
PROJECT : TWIN VILLA 2150 1750 2650 2650 1750 2150
7 TB4 TB4 TB3 7
6 6
5 4140 TB1 5
4 4
3 TB1 4140 3
2 2
SCHEDULE OF TIE BEAMS 1 TB2 TB2 1
TB2 TB2
TYPE BEAM SIZE BOTTOM STEEL STRAIGHT TOP STEEL STIRRUPS COUNT 3800 TB1 TB1 TB1
EXTRA @ CONT. SUPPORT
CTB 250 x 600 1 TB1 3800
TB1 200 x 400 1
TB2 200 x 600 2-Y16 (3+2)-Y16 - Y8 AT 200 C/C 9
TB3 250 x 600 2
TB4 250 x 600 3-Y16 2-Y16 1-Y16 Y8 AT 200 C/C 3
Grand total: 16 16
(2+2)-Y16 2-Y16 3-Y16 Y8 AT 200 C/C
3-Y16 (3+2)-Y16 - Y8 AT 200 C/C 4150 4150
(2+2)-Y16 2-Y16 3-Y16 Y8 AT 200 C/C TB1 TB1 TB1 TB1
24180 24180
Width As Per Schedule 3900 3900
Reinf. As Per ScheduleDepth As Per Schedule 4050 TB2 TB2 TB1
Stirrups As Per Schedule TB2 TB2
TB1 4050
Typ. Beam Cross Section TB1
4140 TB1
TB1 4140
T B 3 T B 4 CTB
2150 1750 2650 2650 1750 2150
13100
PORTFOLIO - SAMAD IBRAHIM A BC D EF G
A BC D EF G
13100 ROOF BEAM LAYOUT
PROJECT : TWIN VILLA
2150 1750 2650 2650 1750 2150
7 CB B 5 B4 7
4140 B2
B2 4140
6 B3 B3 6
3800 B1
B2
B2
3800
5 B3 B3 5
4150 B2 B2 B2 B2 B2 B2 4150 SCHEDULE OF BEAMS
TOP STEEL
24180 B3 B3 24180 TYPE BEAM SIZE BOTTOM STEEL STRAIGHT EXTRA @ CONT. STIRRUPS COUNT
SUPPORT
4 4
B1 200 x 400 3-Y16 2-Y16 Y8 AT 200 C/C 2
3900 3900 B2 200 x 600 3-Y16 2-Y16 1-Y16 Y8 AT 200 C/C 14
B3 200 x 600 (2+2)-Y20 2-Y25 1-Y16 2-Y25+1-Y20 10
B4 200 x 600 2-Y16 (2+2)-Y16 Y8 AT 200 C/C 2
3 B3 B3 3 B5 200 x 600 (2+2)-Y16 2-Y16 2-Y25 Y8 AT 200 C/C 2
CB 200 x 600 2-Y16 2-Y16+2-Y25 Y8 AT 200 C/C 2
Grand total: 32 32
4050 B2
B2 4050
B1
2 B3 B3 2
4140 B2
B2 4140
1 B 4 B 5 CB 1
2150 1750 2650 2650 1750 2150
13100
A BC D EF G PORTFOLIO - SAMAD IBRAHIM
STRUCTURAL 3D VIEW
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
THANKS
A BC D EF G
13100
2150 1750 2650 2650 1750 2150 FOUNDATION LAYOUT
PROJECT : TWIN VILLA
7 F2 7
F2 2100 X 2100
2100 X 21004140 F3 4140
-600 S.S.L. 1400 X 1400
6 6
F2 F1 F2
2100 X 2100 2400 X 2400 2100 X 2100
3800 -550 S.S.L. 3800 Str. Column As Per SHD. Column Stirrups
Short Span Steel As Per SHD. Column Reinforcement
Bituminous Paint
55 Long Span Steel As Per SHD.
50
F2 F1 F2 Depth As Per Schedule
2100 X 2100 2400 X 2400 2100 X 2100
4150 4150 50
2418044 24180
F2 F1 F2
2100 X 2100 2400 X 2400 2100 X 2100
3900 3900 Width As Per Schedule
2200
33
F2 F1 F2 100mm Thick Blinding
2100 X 2100 2400 X 2400 2100 X 2100 1000 Gauge Polythene Sheet
Earth Fill
4050 4050
TYP. SECTION OF COLUMN AND FOOTING
22
F2
F1 F2
2100 X 2100
2400 X 2400 2100 X 2100
4140 -650 S.S.L. 4140
1 F2 1
F2 2100 X 2100
2100 X 2100
F3
1400 X 1400
2150 1750 2650 2650 1750 2150
13100
A BC D EF G PORTFOLIO - SAMAD IBRAHIM
A BC D EF G
COLUMN AXIS LAYOUT 13100
PROJECT : TWIN VILLA
2150 1750 2650 2650 1750 2150
PORTFOLIO - SAMAD IBRAHIM
C1 C1 C1 200 400 400 200 200 200 200
77
400 400
4140 4140
2003800400 400 200 200 500 400 3800 6
5
6 C2 C1
C1 500 400
200 C2 C1
5
C1
4150 4150
40024180200 200 500 200 200 400 24180 4
3
4 3900 C2 C1 3900 2
C14050 500 200 4050
400 200 C2 200 C1
3 500 200
C1 C2 C1
400
2 C1
4140 4140
400 400200 200 200 400 1
1 C1
C1 C1
2150 1750 2650 2650 1750 2150
13100
A BC D EF G
GRAPHICAL COLUMN SCHEDULE
PROJECT : TWIN VILLA
R oof R oof
4200 4200
T op of Foundation C1 C1 C1 C1 C1 C1 C1 C1 C2 C2 C2 T op of Foundation
-600 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 500 200X 500 200X 500 -600
Column Locations
-650 -600 -600 -600 -600 -600 -600 -600 -550 -550 -550
R oof
4200 A-1 A-2 A-3 A-4 A-5 A-6 B-7 C-1 D-2 D-3 D-4
T op of Foundation R oof
-600 4200
Column Locations
C2 C2 C1 C1 C1 C1 C1 C1 C1 C1 T op of Foundation
200X 500 200X 500 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 200X 400 -600
-550 -550 -600 -600 -600 -600 -600 -600 -600 -650
D-5 D-6 E-7 F-1 G-2 G-3 G-4 G-5 G-6 G-7
PORTFOLIO - SAMAD IBRAHIM
A BC D EF G
GROUND FLOOR 13100
TIE BEAM LAYOUT
PROJECT : TWIN VILLA 2150 1750 2650 2650 1750 2150
7 TB4 TB4 TB3 7
6 6
5 4140 TB1 5
4 4
3 TB1 4140 3
2 2
SCHEDULE OF TIE BEAMS 1 TB2 TB2 1
TB2 TB2
TYPE BEAM SIZE BOTTOM STEEL STRAIGHT TOP STEEL STIRRUPS COUNT 3800 TB1 TB1 TB1
EXTRA @ CONT. SUPPORT
CTB 250 x 600 1 TB1 3800
TB1 200 x 400 1
TB2 200 x 600 2-Y16 (3+2)-Y16 - Y8 AT 200 C/C 9
TB3 250 x 600 2
TB4 250 x 600 3-Y16 2-Y16 1-Y16 Y8 AT 200 C/C 3
Grand total: 16 16
(2+2)-Y16 2-Y16 3-Y16 Y8 AT 200 C/C
3-Y16 (3+2)-Y16 - Y8 AT 200 C/C 4150 4150
(2+2)-Y16 2-Y16 3-Y16 Y8 AT 200 C/C TB1 TB1 TB1 TB1
24180 24180
Width As Per Schedule 3900 3900
Reinf. As Per ScheduleDepth As Per Schedule 4050 TB2 TB2 TB1
Stirrups As Per Schedule TB2 TB2
TB1 4050
Typ. Beam Cross Section TB1
4140 TB1
TB1 4140
T B 3 T B 4 CTB
2150 1750 2650 2650 1750 2150
13100
PORTFOLIO - SAMAD IBRAHIM A BC D EF G
A BC D EF G
13100 ROOF BEAM LAYOUT
PROJECT : TWIN VILLA
2150 1750 2650 2650 1750 2150
7 CB B 5 B4 7
4140 B2
B2 4140
6 B3 B3 6
3800 B1
B2
B2
3800
5 B3 B3 5
4150 B2 B2 B2 B2 B2 B2 4150 SCHEDULE OF BEAMS
TOP STEEL
24180 B3 B3 24180 TYPE BEAM SIZE BOTTOM STEEL STRAIGHT EXTRA @ CONT. STIRRUPS COUNT
SUPPORT
4 4
B1 200 x 400 3-Y16 2-Y16 Y8 AT 200 C/C 2
3900 3900 B2 200 x 600 3-Y16 2-Y16 1-Y16 Y8 AT 200 C/C 14
B3 200 x 600 (2+2)-Y20 2-Y25 1-Y16 2-Y25+1-Y20 10
B4 200 x 600 2-Y16 (2+2)-Y16 Y8 AT 200 C/C 2
3 B3 B3 3 B5 200 x 600 (2+2)-Y16 2-Y16 2-Y25 Y8 AT 200 C/C 2
CB 200 x 600 2-Y16 2-Y16+2-Y25 Y8 AT 200 C/C 2
Grand total: 32 32
4050 B2
B2 4050
B1
2 B3 B3 2
4140 B2
B2 4140
1 B 4 B 5 CB 1
2150 1750 2650 2650 1750 2150
13100
A BC D EF G PORTFOLIO - SAMAD IBRAHIM
STRUCTURAL 3D VIEW
PROJECT : TWIN VILLA
PORTFOLIO - SAMAD IBRAHIM
THANKS