The words you are searching are inside this book. To get more targeted content, please make full-text search by clicking here.
Discover the best professional documents and content resources in AnyFlip Document Base.
Search
Published by sboland, 2020-01-06 11:32:16

Education K-12 Brochure

Education K-12 Brochure

Tampa | Ft. Lauderdale | Miami | Orlando

EDUCATION K-12

Peter B. Davidsen Middle School - Tampa, Florida

Master Consulting Engineers, Inc. (MCE) was respon-
sible for the structural engineering of this prototype
school, located in the Westchase area of Tampa, Flor-
ida. This 130,000 square foot middle school complex
is comprised of seven buildings, namely the Admin-
istration Building, three, 2-story classroom buildings,
the food service/multi-purpose building, the Media
Center, and the gymnasium. Also included is an art
studio, music suite and a physical education facility.
Each building is supported by a steel framing system
in the interior and load-bearing concrete tilt-up panels
at the exterior. All of the buildings are interconnected
by a covered walkway supported by masonry beams,
pilasters and/or walls. The building complex features
a curved steel-framed metal canopy at the bus loop.

Mulrennan Middle School - Tampa, Florida

This prototype project, located in Tampa,
Florida consists of a campus of 7 build-
ings and 1,511 student stations; three
2-story buildings and four 1-story build-
ings, including an administrative build-
ing, a gymnasium, a food/multi-purpose
service area, music department and me-
dia building. Outside facilities include a
new bus loop, teacher and visitor parking,
basketball courts and running track. This
school also doubles as a hurricane shel-
ter in accordance with the Miami-Dade
Code for Enhanced Hurricane Protection.

Hillsborough High School - Tampa, Florida

MCE’s renovation responsibility included rein-
forcing the gabled ends with structural steel
framing as to prevent their collapse as well
as repairing two (2) roof areas. Construction
consists of restoration, replacement, reno-
vations, upgrading, installation and electri-
cal renovations. These improvements were
finished in 2003. Services were also provid-
ed for a small addition and to provide hurri-
cane straps to existing wood roof trusses for
the baseball dugout to bring it up to Code.

Freedom High School - Tampa, Florida

This 229,000 square foot project, locat-
ed in downtown Tampa, Florida, con-
sists of a high school that shares its space
with an adjacent middle school and a
municipal downtown park. The design
was created in order to share as many
amenities as possible with the school
and the downtown space available in
order to cut costs for the school board.
Student capacity is for 2,485 students.

MCE’s Extensive Education K-12 Work

Broward County Additions and remodeling

• Continious Contract with School Board • Bellamy Elementary School
• Bing Elementary School
Additions and remodeling • Boyette Springs Elementary School
• Brooker Elementary School
• Silver Shores Elementary • B. T. Washington Elementary School
• Stirling Elementary • Chiles Elementary School
• Chapel Trail Elementary • Clark Elementary School
• Tropical Elementary • Claywell Elementary School
• North Lauderdale Elementary • Egypt Lake Elementary School
• Attucks Middle School • Forest Hills Elementary School
• Gorrie Elementary School
Hillsborough County • Ippolito Elementary School
New Construction • Limona Elementary School
• Mabry Elementary School
• Elementary School O / Muller Elementary School • MacFarlane Elementary School
• Middle School SS / Barrington Middle School • Mendenhall Elementary School
• Middle School MM / Farnell Middle School • Mitchell Elementary School
• Fishhawk/Randall Middle School • Nelson Elementary School
• Middle School PP / Giunta Middle School • Oak Park Elementary School
• Walker Middle School
• Riverview High School
• Wharton High School

MCE’s Extensive Education K-12 Work

Hillsborough County Palm Beach County
New Construction
Additions and remodeling • Palm Beach Day School
• Benjamin School
• Palm River Elementary School Additions and remodeling
• Potter Elementary School • Carver Middle School
• Riverview Elementary School • Lantana Middle School
• Roosevelt Elementary School
• Summerfield Crossings Elementary School Polk County
• Tampa Bay Boulevard Elementary School New Construction
• Tampa Palms Elementary School • Karen M Siegel academy
• Temple Terrace Elementary School • McKeel Academy
• Trinity School for Children • Mulberry Middle School
• Benito Middle School Additions and Remodeling
• Burns Middle School • Lincoln Avenue Academy
• Coleman Middle School • Bartow Elementary School
• Davidsen Middle School • Crystal Lake Elementary School
• Ferrell Middle School • Eagle Lake Elementary School
• Madison Middle School • Elbert Elementary School
• Mann Middle School • Gibbons Street Elementary School
• Memorial Middle School • Highland City Elementary School
• Mulrennan Middle School • Medulla Elementary School
• Progress Middle School
• Wimauma Middle School
• Blake High School
• Brandon High School
• Chamberlain High School
• D. W. Waters Career Center
• Durant High School
• Freedom High School
• Gaither High School
• Hillsborough High School
• Jefferson High School
• King High School
• Leto High School
• Newsome High School
• Plant City High School
• Plant High School
• Robinson High School

Connect with us : Structural Engineering | Threshold Inspections | Forensic Engineering

Master Consulting Engineers (MCE) established in 1999, a WMBE and DBE Florida firm led
by a group of engineers with a combined experience of more than 100 years. Our Prin-
cipals bring leadership in structural design; threshold inspections; forensic engineering;
with a diverse portfolio of projects ranging from half million to $1 Billion in construction
costs. MCE has offices in Tampa, Orlando, Fort Lauderdale, and Aventura.

Tampa | Fort Lauderdale | Miami | Orlando
www.mcengineers.com


Click to View FlipBook Version